Document colectat · Documentul de referință al rețelei feroviare 2026
Process of conflict resolution
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 772,3 KB
Conținutul disponibil în colecție
Textul documentului
highest efficiency of the usage of all the railway
train*km paths allocated in acc. with the
allocated path, respectively who had the infrastructure
Rail Service Book)x100
lowest percentage of non-used paths access
contract in
the previous
timetable
The proportional distribution to the total
number of requests. The number of pairs
of allocated paths Ta shall be determined
with the help of the formula:
Tai=(Tsi/ΣTsi)*Tst
where:
Tai – pairs of paths allocated to each of the
RUs The calculation of Tai results in the
7 number of pairs of paths allocated to
Tsi – pairs of paths requested by each RU each applicant.
that can be considered conflicting
requests
ΣTsi – the sum of all the requests for pairs
of conflicting paths
Tst – pairs of available paths for which
conflicting requests have been submitted
CNCF „CFR”- SA QESMS
Edition: 2
OPERATIONAL PROCEDURE
Revision: 1
SETTLEMENT OF DISPUTES OVER THE INFRASTRUCTURE
Page: 11/11
TRAFFIC DIRECTORATE CAPACITY ALLOCATION
Code PO 0-8.5-08
It shall be decided in favour of the
8 Impairment of railway station capacity request that least affects the capacity of
the railway station.
The commission provided for at Item 5.2.1. shall apply the criteria in the order set out above, as follows:
a) Criteria 1-5 shall be eliminatory in the order mentioned;
b) Criterion 5 shall be analysed on the basis of the applicant's statement at the time of submitting the
path request. CFR shall reserve the right to sanction the relevant RU by calculating the Pa coefficient by including
the volume of train-kms for the case when diesel traction rolling stock is used instead of the electric one (as
indicated in the path request) in the volume of non-used train-kms. Exceptions are the cases due to the railway
infrastructure;
c) if at least one applicant did not hold a railway infrastructure access contract in the previous timetable,
Criterion 6 shall not apply;
d) By applying Criterion 6, there shall be determined the value of the non-usage coefficient for each
applicant.
In this case, the number of paths allocated to each applicant shall be determined after carrying out the
following stages:
d1) on the basis of the Pa coefficient determined for each applicant, a ranking shall be drawn up in
descending order. Each applicant shall be assigned a place in this ranking. Each applicant shall receive a number
of points according to the place he occupies in the ranking, as follows:
- Place 1 receives N points, where N is the number of applicants;
- Place 2 receives N-1 points;
- Place 3 receives N-2 points;
- ....
d2) There shall be established for each applicant a share of the number of paths in dispute to be allocated
to him, whereas this share shall be calculated with the help of the formula:
𝑁 𝑁−1 1
𝐶1 = 𝑆 ; 𝐶2 = 𝑆
; ……; 𝐶𝑁 = 𝑆
where:
S – represents the sum of all the points received by the applicants;
N – number of applicants;
C1........CN - share to be assigned to each applicant.
e) If at least one applicant did not hold a railway infrastructure access contract in the previous timetable,
Criterion 6 shall not apply, the number of allocated paths shall be assigned on the basis of the proportionality
principle (Criterion 7).
CNCF „CFR”- SA QESMS
Edition: 2
OPERATIONAL PROCEDURE
Revision: 1
SETTLEMENT OF DISPUTES OVER THE INFRASTRUCTURE
Page: 12/11
TRAFFIC DIRECTORATE CAPACITY ALLOCATION
Code PO 0-8.5-08
The result of the assessment shall be mentioned in a minutes in accordance with the template included
in Annex No. 5.
After the conclusion of the minutes, the Traffic Directorate/Division shall inform the RU, in writing, on the
modality in which the dispute between the conflicting requests was settled, by using one of the templates
included in Annexes No. 2 or 3, as appropriate.
(4) The deadline for completing the analysis shall be 10 working days from the moment when CFR finds
out that no agreement can be reached by using the coordination procedure.
5.2.4. Settlement of the Disputes related to the Conflicting Requests for Infrastructure Capacity Allocation, Other
than Those related to Conflicting Requests
(1) In case of any other disputes notified in writing by the RU, arising out of the request and
allocation of the infrastructure capacity, the settlement shall be exclusively performed by means of
consultations. The disputes shall be analysed by the commission provided for at Item 5.2.1. If all the RUs involved
agree, in writing, with the disclosure of their identity (for which the RUs’ agreement has been requested), they
shall be directly consulted. If at least one of the RUs does not agree with the disclosure of the identity or if,
following the consultations, the parties do not reach a unanimously accepted solution, CFR shall decide to reject
the complaint.
(2) The deadline for completing the analysis shall be 10 working days from the moment when the
RU’s notice is received, and the result of the analysis shall be recorded in a minutes, in accordance with the
template included in Annex No. 4.
(3) The RU shall be informed, in writing, on the modality in which the dispute was settled.
6. RESPONSIBILITIES
6.1. Head of the CAO (Traffic Directorate/Traffic Divisions within the RRB 1-8)
• Settles the disputes related to the infrastructure capacity allocation in accordance with this procedure.
• Transmits to the applicants the manner in which the disputes related to infrastructure capacity allocation
have been settled.
• Enforces the provisions of this procedure for settling the disputes related to infrastructure capacity
allocation.
• Takes part in the commission for settling the disputes related to infrastructure capacity allocation.
6.2. Deputy Head of the Central Traffic Regulator
• Takes part in the commission for settling the disputes related to infrastructure capacity allocation.
6.3. Head of the Regional Traffic Regulator
• Takes part in the commission for settling the disputes related to infrastructure capacity allocation.
6.4. Employee of the Traffic Directorate/Traffic Division within the RRB 1-8
• Takes part in the commission for settling the disputes related to the infrastructure capacity allocation.
CNCF „CFR”- SA QESMS
Edition: 2
OPERATIONAL PROCEDURE
Revision: 1
SETTLEMENT OF DISPUTES OVER THE INFRASTRUCTURE
Page: 13/11
TRAFFIC DIRECTORATE CAPACITY ALLOCATION
Code PO 0-8.5-08
7. DOCUMENTED INFORMATION (RECORDS)
Curr
Archiving
ent Name of record Prepared by Archiving place
duration
No.
Minutes on the Analysis Carried Out Following the
Application of the Criteria for Settling the Disputes Commission
1. 5 years
related to the Conflicting Requests for Infrastructure CAO
Capacity Allocation - the General Case
Request for the RUs’ Agreement with the Disclosure
2. CAO CAO 5 years
of their Identity
Information of the RUs on the Modality to Settle the
3. Conflict between the Conflicting Requests (if the RUs 5 years
CAO CAO
agree with the disclosure of their identity)
Information of the RUs on the Modality to Settle the
4. Conflict between the Conflicting Requests (if the RUs CAO 5 years
do not agree with the disclosure of their identity) CAO
Minutes on the Analysis Carried Out Following the
Application of the Criteria for Settling the Disputes
5. related to the Conflicting Requests for Infrastructure Commission 5 years
Capacity Allocation – the Case of the Traffic Sections CAO
for Intermodal Terminals
Minutes on the Consultation of the RUs on the
6. Settlement of Disputes, Other than Those related to Commission 5 years
Conflicting Requests CAO
Other Electronic Written Communications between
7. CAO CAO 5 years
CFR and the RUs
8. ANNEXES
• Annex No. 1 - Minutes on the Analysis Carried Out Following the Application of the Criteria for Settling
the Disputes related to the Conflicting Requests for Infrastructure Capacity Allocation - the general case
• Annex No. 2 – Information of the RUs on the Modality to Settle the Conflict between the Conflicting
Requests (if the RUs agree with the disclosure of their identity)
• Annex No. 3 – Information of the RUs on the Modality to Settle the Conflict between the Conflicting
Requests (if the RUs do not agree with the disclosure of their identity)
• Annex No. 4 - Minutes on the Consultation of the RUs on the Settlement of Disputes
• Annex No. 5 - Minutes on the Analysis Carried Out Following the Application of the Criteria for Settling
the Disputes related to the Conflicting Requests for Infrastructure Capacity Allocation – the Case of the
Traffic Sections for Intermodal Terminals
• Annex No. 6 - Process Diagram regarding the Development of the Dispute Settlement Procedure by
Using the Criteria – the General Case
CNCF „CFR”- SA QESMS
Edition: 2
OPERATIONAL PROCEDURE
Revision: 1
SETTLEMENT OF DISPUTES OVER THE INFRASTRUCTURE
Page: 14/11
TRAFFIC DIRECTORATE CAPACITY ALLOCATION
Code PO 0-8.5-08
• Annex No. 7 - Process Diagram regarding the Development of the Dispute Settlement Procedure by
Using the Criteria – the Case of the Traffic Sections for Intermodal Terminals
• Annex No. 8 - Process Diagram regarding the Development of the Dispute Settlement Procedure
without Using the Criteria
• Forms - The Checklist of Editions/Reviews; the Procedure Analysis Form; the Dissemination/Withdrawal
List.
Annex No. 1, PO 0-8.5-08, Edition 2, Review 1
Traffic Directorate/Traffic Division within the RRB 1-8
Capacity Allocation Office
No. ………/Date ……
Minutes
The Analysis Carried Out Following the Application of the Criteria for Settling the Disputes related to the
Conflicting Requests for Infrastructure Capacity Allocation — the General Case
Concluded today, ……., following the analysis of the conflicting requests related to infrastructure
capacity allocation in the timetable .............
Cur RU Criterion
ren
1 2 3 4 5 6 7
t
No.
1
2
3
4
Result of the application of the coordination process:
Commission:
Curr Last name, first name Position Signature
ent
No.
1
2
3
Annex No. 2, PO 0-8.5-08, Edition 2, Review 1
Traffic Directorate/Traffic Division within the RRB 1-8
Capacity Allocation Office
No. ………/Date ……
To,
(RU)..........
Director................
Regarding: Information of the RUs on the Modality to Settle the Conflict between the Conflicting Requests (if
the RUs agree with the disclosure of their identity)
Following the analysis of your request No. ........... of …….., we send you the results of the coordination
process between the conflicting requests related to infrastructure capacity allocation:
Cur RU Criterion
ren
1 2 3 4 5 7
t
No.
1
2
3
4
There was applied Criterion 6 (if applicable) with the following result:
(Other comments)........................................................................................
Traffic Director/Head of the Traffic Division
(Last name, first name, signature)
Head of the CAO
(Last name, first name, signature)
Prepared by:..... (Last name, first name, signature)
Annex No. 3, PO 0-8.5-08, Edition 2, Review 1
Traffic Directorate/Traffic Division within the RRB 1-8
Capacity Allocation Office
No. ………/Date ……
To,
(RU)..........
Director................
Regarding: Information of the RUs on the Modality to Settle the Conflict between the Conflicting Requests (if
the RUs do not agree with the disclosure of their identity)
Following the analysis of your request No. ........... of …….., we communicate to you the following:
........................................................................................................................................
Traffic Director/Head of the Traffic Division
(Last name, first name, signature)
Head of the CAO
(Last name, first name, signature)
Prepared by:..... (Last name, first name, signature)
Annex No. 4, PO 0-8.5-08, Edition 2, Review 1
Traffic Directorate/Traffic Division within the RRB 1-8
Capacity Allocation Office
No. ………/Date ……
Minutes
the Consultation of the RUs on the Settlement of Disputes
Concluded today, ……., following the direct consultation with the applicants involved following the
disputes related to infrastructure capacity allocation in the timetable ..................
A. Opinion of the RU:
1. RU .........
2. RU .........
3. RU ..........
4. RU
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
4cd059a049d599aebf2f4635dfa20977458beb1b65ad4e0be7ac17ee973c2c64