Document colectat · Documentul de referință al rețelei feroviare 2026
Process of conflict resolution
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 772,3 KB
Conținutul disponibil în colecție
Textul documentului
.........
5. CFR.........
B. Conclusions:
Participants:
Curr Last name, first name Company/firm Position Signature
ent
No.
1
2
3
4
5
6
7
Prepared by:..... (Last name, first name, signature)
Annex No. 5, PO 0-8.5-08, Edition 2, Review 1
Traffic Directorate/Traffic Division within the RRB 1-8
Capacity Allocation Office
No. ………/Date ……
Minutes
The Analysis Carried Out Following the Application of the Criteria for Settling the Disputes related to the
Conflicting Requests for Infrastructure Capacity Allocation – the Case of the Traffic Sections for Intermodal
Terminals
Concluded today, ……., following the analysis of the conflicting requests related to infrastructure
capacity allocation in the timetable .............
Curr RU Criterion
ent
1 2 3 4 5 6 8
No.
1
2
3
4
There was applied Criterion 7 (if applicable) with the following result:
Result of the application of the coordination process:
Commission:
Curr Last name, first name Position Signature
ent
No.
1
2
3
THE CHECKLIST OF EDITIONS/REVIEWS OF THE DOCUMENT
OPERATIONAL PROCEDURE
SETTLEMENT OF THE DISPUTES RELATED TO INFRASTRUCTURE CAPACITY ALLOCATION
Code PO 0-8.5-08, Edition 2, Review 1
Ed/ Change reason Changes Date of
chapter, the entry
Rev
paragraph/ into force
page/row Prepared/ Approved by
reviewed by
First name, last First name, last name
name
19.11.
1/0 Initial - Monica PAVEL Ioan PINTEA
preparation 2020
Decision of the Ch. 2; Ch. 3;
Competition Ch. 4 (4.1); Ch. 19.05.
2/0 Monica PAVEL Ion SIMU- ALEXANDRU
Council No. 5; Ch. 6; Ch. 7; 2022
1/31.03.2021 Ch. 8; Annexes
Clarification of Item 5.2.3
2/1 2022 Monica PAVEL Ion SIMU- ALEXANDRU
formulas letter d1), d2)
...
f 0-7.5-01-01, Ed. 6, Rev. 0
FORM OF THE ANALYSIS OF THE DOCUMENT
OPERATIONAL PROCEDURE
SETTLEMENT OF THE DISPUTES RELATED TO INFRASTRUCTURE CAPACITY ALLOCATION
Code PO 0-8.5-08, Edition 2, Review 1
Curren Org. structures who took part in They drew up points
Comments
t No. the analysis of the document if view
General Inspectorate for Railway x from the SMS point of view
1. Traffic Safety
2. Directorate for Human Resources x
Technical Directorate – Office for x from the EQMS point of view
3. the Management of Quality
Systems and Procedures
f 0-7.5-01-02, Ed. 6, Rev. 0
LIST OF THE DISSEMINATION/WITHDRAWAL OF THE DOCUMENT
OPERATIONAL PROCEDURE
SETTLEMENT OF THE DISPUTES RELATED TO INFRASTRUCTURE CAPACITY ALLOCATION
Code PO 0-8.5-08, Edition 2, Review 1
Nr. Name of the document (code/update):
exemplar Disseminated: Withdrawn:
PO 0-8.5-08, Edition 2, Review 1 Edition 2, Review 0
Recipient First name, last name Date Date
1 Technical Directorate
General Inspectorate for Railway
2
Traffic Safety
3 Directorate for Human Resources
Technical Directorate – Office for
4 the Management of Quality
Systems and Procedures
.... RU
Nr. Name of the document (code/update):
exemplar Disseminated: Withdrawn:
PO 0-8.5-08, Edition 2, Review 1 Edition 2, Review 0
Recipient First name, last name Date Date
The Bucharest Regional Railway
1/
Branch
The Craiova Regional Railway
2/
Branch
The Timișoara Regional Railway
3/
Branch
4/ The Cluj Regional Railway Branch
5/ The Brașov Regional Railway Branch
6/ The Iași Regional Railway Branch
7/ The Galați Regional Railway Branch
The Constanța Regional Railway
8/
Branch
…..
f 0-7.5-01-03, Ed. 6, Rev.
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
4cd059a049d599aebf2f4635dfa20977458beb1b65ad4e0be7ac17ee973c2c64