Document colectat · Documentul de referință al rețelei feroviare 2026
Traffic restriction
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 856,6 KB
Conținutul disponibil în colecție
Textul documentului
Speed restriction of 30 km/h over a 50-meter section
from km 252+982 to km 253+032 (105 days). Track works
187 203 Zăvideni Fișcălia 106 17.03.2027 30.06.2027 B are being carried out during traffic breaks involving daily
line closures. TOTAL CLOSURE for 1 day, with passenger
transfer.
Speed restriction of 30 km/h over a 264-meter stretch
188 203 Cozia Lotru 611 01.03.2027 31.10.2028 B from km 320+785 to km 321+049 (17 months). Total
closure: 11 months.
Speed restriction of 30 km/h over a 106-meter stretch
from km 220+418 to km 220+524 (6 months). Total
189 203 Arcești Colibași 183 01.10.2027 31.03.2028 B
closure: 10 days for the temporary bridge; 1 month for
work completion.
Speed restriction of 30 km/h over a 300 m stretch from
190 203 Bujoreni Dăești 672 01.03.2027 31.12.2028 B km 300+594 to km 300+894 (32 months). Total closure:
30 months.
Speed restriction of 30 km/h over a 200 m stretch from
191 203 Câineni Valea Mărului 550 01.05.2027 31.10.2028 B km 352+001 to km 352+201 (14 months). Total closure: 8
months.
Full closure: 10 days for the temporary bridge; 2 months
192 203 Drăgășani Zăvideni 519 01.04.2027 31.08.2028 B
for completion of works.
Speed restriction of 30 km/h over a 110 m stretch from
km 214+852 to km 214+962 (6 months). Total closure: 10
193 203 Găneasa Arcești 183 01.04.2027 30.09.2027 B
days for the temporary bridge; 1 month for completion of
works.
Full closure: 10 days for the temporary bridge; 1.7 months
194 203 Ionești Băbeni 488 01.04.2027 31.07.2028 B
to complete the works.
195 203 Lotru Cornet 458 01.06.2027 31.08.2028 B Total closure: 6 months.
Speed restriction of 30 km/h over a 104-meter stretch
(from km 221+052 to km 221+156) for 6 months. Total
196 203 Piatra Olt Podu Olt 183 01.04.2027 30.09.2027 B
closure: 10 days; temporary bridge: 1.7 months;
completion of works.
Speed restriction of 30 km/h over a 106-meter stretch
from km 228+693 to km 228+799 (6 months). Total
197 203 Strejești Zlătărei 183 01.04.2027 30.09.2027 B
closure: 10 days for the temporary bridge; 1 month for
work completion.
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 16 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
Speed restriction of 30 km/h over a 108-meter stretch
Valea from km 365+096 to km 365+194 (5 months). Total
198 203 Turnu Roșu 153 01.03.2028 31.07.2028 B
Fratelui closure: 10 days for the temporary bridge; 20 days for
work completion.
Full closure: 10 days for the temporary bridge; 1.7 months
199 203 Zăvideni Fișcălia 549 01.04.2027 30.09.2028 B
to complete the works.
Baile
200 218 Ortisoara 1153 30.07.2024 25.09.2027 C Permanent 50 km/h speed limit
Calacea
Baile
201 218 Ortisoara 448 25.09.2027 15.12.2028 B New 120 km/h Overhead Catenary System
Calacea
202 218 Ortisoara Vinga 669 26.11.2025 25.09.2027 C Permanent 50 km/h speed limit
203 218 Ortisoara Vinga 305 25.09.2027 25.07.2028 B New 120 km/h Overhead Catenary System II
Ronat Triaj
204 218 Sanandrei 1161 22.07.2024 25.09.2027 C Permanent 50 km/h speed limit
Gr D
Ronat Triaj
205 218 Sanandrei 244 25.09.2027 25.05.2028 B New 120 km/h Overhead Catenary System II
Gr D
206 218 Sag Aradu Nou 885 24.04.2025 25.09.2027 C Permanent 50 km/h speed limit
207 218 Sag Aradu Nou 397 25.09.2027 25.10.2028 B New 120 km/h Overhead Catenary System
208 218 Sanandrei Baile Calacea 1125 27.08.2024 25.09.2027 B Permanent 50 km/h speed limit
209 218 Sanandrei Baile Calacea 154 25.09.2027 25.02.2028 B Circ pe Fir I nou 120km/h
210 218 Vinga Sag 670 25.11.2025 25.09.2027 B Permanent 50 km/h speed limit
211 300 Albești Vînători 1227 24.11.2025 03.04.2029 B Vitexă Beneficiary. Traffic is moving on Track II.
212 300 Albești Sighișoara 1363 30.10.2025 23.07.2029 B V = 80 km/h. Traffic is moving on Track I.
213 300 Apața Feldioara 104 20.06.2028 01.10.2028 B Tests involving the taking out of service of CT installations
50 km/h for 5,000 m; 80 km/h otherwise. Traffic is
214 300 Archita Cața 111 04.04.2029 23.07.2029 B
running on Track II.
215 300 Archita Vinători 95 24.07.2029 26.10.2029 B Decommissioning tests for CT equipment
Rehabilitation of tracks IV.5, 6, and 7 at Racoș + Track II
216 300 Augustin Racos 93 18.08.2025 18.11.2025 B between Rupea and Augustin. Traffic is operating on Track
I.
Rehabilitation of lines 1, 2, and III at Racoș + Track 1
217 300 Augustin Racos fir 1 25 18.11.2025 12.12.2025 B
(Augustin–Rupea section). Traffic is operating on Track II.
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 17 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
218 300 Beia Cața 404 01.11.2026 09.12.2027 B RV 50 km/h pe 4000 m. Traffic is moving on Track II.
219 300 Beia Mureni 737 29.03.2027 03.04.2029 B RV 50 km/h pe 2000 m. Traffic is moving on Track II.
220 300 Cața Beia 651 20.01.2025 01.11.2026 B RV 50 km/h pe 4000 m. Traffic is moving on Track I.
221 300 Cața Beia 481 10.12.2027 03.04.2029 B RV 50 km/h pe 4000 m. Traffic is moving on Track I.
Reduced speed for the beneficiary. Traffic is moving on
222 300 Mureni Beia 753 06.03.2025 28.03.2027 B
Track II.
Speed restriction of 50 km/h for 2,000 m. Traffic is moving
223 300 Mureni Vinători 1034 05.06.2026 03.04.2029 B
on Track I.
Track 1: 30 km/h speed restriction, temporary bridge, km
224 300 Racos Rupea 2080 08.03.2022 16.11.2027 B
225+000–225+100.
Rehabilitation of Track 2 between Racoș and Rupea.
225 300 Racos Rupea 1897 06.09.2022 15.11.2027 B
Traffic is operating on Track 1.
Rehabilitation of Track 2, km 232+600–234+750 and
226 300 Rupea Cata 707 08.02.2024 14.01.2026 B
235+525–236+290. Traffic is operating on Track 1.
227 300 Rupea Cata 307 15.01.2026 17.11.2026 B Rehabilitation of Track 1. Traffic is operating on Track 2.
Rehabilitation of Track 2, km 234+750–235+525. Traffic is
228 300 Rupea Cata 121 18.11.2026 18.03.2027 B
operating on Track 1.
229 300 Rupea Racos 336 16.11.2027 16.10.2028 B Rehabilitation of Track 1. Traffic is operating on Track 2.
Traffic on Track II is permitted only under Cautionary
230 300 Sighișoara Albești 738 28.03.2027 03.04.2029 B
Signal (CL) conditions.
Restricted speed (50 km/h) for 2,000 m. Traffic is moving
231 300 Vinători Mureni 1578 08.02.2022 04.06.2026 B
on Track II.
Speed restriction of 50 km/h for 2,000 m; 80 km/h
232 300 Vinători Archita 111 04.04.2029 23.07.2029 B elsewhere. LC+BLA signaling in effect. Traffic is running on
Track II.
233 300 Baciu Tj Garbau 214 01.05.2026 30.11.2026 B 50 km/h – worker protection. Traffic is running on Track 1.
Cluj-
234 300 Baciu Tj 214 01.05.2026 30.11.2026 B 50 km/h worker protection; traffic moving on Track 1.
Napoca
Cluj-
235 300 Cluj-Napoca 730 01.03.2024 28.02.2026 B Traffic is moving on Track II.
Napoca Est
Cluj-
236 300 Cluj-Napoca 275 01.03.2026 30.11.2026 B Traffic is moving on Track I.
Napoca Est
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 18 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
Episcopia Episcopia
237 300 87 14.12.2025 10.03.2026 B Traffic on the rehabilitated track
Bihor Bihor Fr
Episcopia
238 300 Oradea Vest 301 14.12.2025 10.10.2026 B Traffic on existing track
Bihor
Episcopia Episcopia
239 300 257 31.03.2026 12.12.2026 B Traffic on th
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
4f238e0e84f61f204528e4de16053251e7c7de6325e57d1564978e6d2abeb3ad