NETWORK STATEMENT - 2026 ANNEX 19 SECTIONS AND STATIONS WITH CAPACITY AND MANEUVER RESTRICTION Validity: 14.12.2025 – 12.12.2026 Version: 15.1.0 Update: 09.09.2026 Compania Naţională de Căi Ferate “CFR” S.A. România 1) Capacity restriction for 2026 The capacity restrictions presented may change in terms of the period depending on the progress of the works Percent/ Fit/ No. Section TOTAL Time Restriction Distance Period Observations crt. shutdown (days) category (conf. L 202/2016) Total closure, construction of projected/existing connections. After opening, traffic will be on the projected I line between Belint - Chizatau and Chizatau - Topolovat. RV 50 km/h throughout the interval (worker 1 100 Belinț Topolovăț DA 1 30.06.2026 30.06.2026 C protection, embankments), RV 30 km/h on the projected/existing connection between km 531+700 - 531+900 and on the projected/existing connection between km 533+500 - 533+700 2 100 Caransebes Zagujeni DA 367 01.05.2026 02.05.2027 A The traffic is on line 122 via Caransebes Triaj 3 100 Caransebes Balta Sarata DA 7 25.02.2027 03.03.2027 C 4 100 Caransebes Balta Sarata DA 6 27.04.2028 02.05.2028 C 5 100 Caransebes Zagujeni DA 35 02.05.2028 05.06.2028 A The traffic is on line 122 via Caransebes Triaj 6 100 Jena Gavojdia DA 7 18.12.2026 24.12.2026 C 7 100 Lugoj Belinț DA 1 29.06.2026 29.06.2026 C Total closure, creation of designed/existing connections. Traffic is completely closed for works in view of the 8 100 Recaș Timișoara Est DA 1 16.02.2026 16.02.2026 C opening of lines III, 4 and 5 from Remetea Mare station Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 2 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România Total closure of the route variant connections between km 565+500 - 567+800. After opening, traffic will be on Remetea the existing line and on the provisional route variant, RV 9 100 Timișoara Est DA 1 02.03.2026 02.03.2026 C Mare 50 km/h throughout the interval (worker protection, embankments). RV 30 km/h on connections between km 565+450 - 565+650 and 567+450 - 567+850 Total closure of the planned line II connections with the Remetea 10 100 Timișoara Est DA 1 01.04.2026 01.04.2026 C existing line. RV 30 km/h on connections between km Mare 565+450 - 565+650 and 568+000 - 568+399 11 100 Tapia Lugoj DA 6 31.08.2026 05.09.2026 C Traffic is completely closed for works in view of the Remetea opening of line II between km 545+750 - Recas, of lines II 12 100 Topolovăț DA 1 30.01.2026 30.01.2026 C Mare and 3 from Recas station and line II between Recas and km 554+450. Baile 13 100 Poarta DA 823 01.09.2026 01.12.2028 A Herculane Drobeta Băile Decommissioning of tracks at stations/sectioning points 14 100 Turnu DA 945 01.06.2026 31.12.2028 A Herculane during the period 01.06.2026–31.12.2028 Severin 15 101 Buc.Nord Buc.N.Post 5 DA 10 16.04.2026 26.04.2026 B 16 103 Jilava Frătești DA 915 02.03.2026 01.09.2028 A 17 103 Frătești Giurgiu DA 915 02.03.2026 01.09.2028 A 18 105 Radulești Giurgiu N DA 1080 10.09.2030 25.08.2033 A * The works originally scheduled for the period from Giurgiu Giurgiu N March 6, 2028, to April 5, 2028, have been brought 19* 902R DA 270 06.03.2028 05.04.2028 A Nord* Frontieră* forward to the period from April 1, 2027, to December 31, 2027. Caransebes 20 122 Caransebes DA 401 26.03.2025 30.04.2026 A Triaj Caransebes 21 122 Caransebes DA 7 25.02.2027 03.03.2027 C Triaj Caransebes 22 122 Zagujeni DA 401 26.03.2025 30.04.2026 A Triaj Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 3 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România Timisoara Ronat Triaj 23 133 DA 872 26.01.2026 15.06.2028 A Nord Gr.D Rehabilitation of switches 8 and 12 1/2 on connecting 24 203 Sibiu Copșa Mică DA 4 26.05.2027 29.05.2027 C track 6-8-10-12 at the Y-end of Sibiu station. Rehabilitation of switches 6 and 10 1/2 on connecting 25 210 Sibiu Turnișor DA 5 15.05.2027 19.05.2027 C track 6-8-10-12 and switch 4 at the Y-end of Sibiu station. Caransebes 26 215 Caransebes DA 575 20.11.2025 17.06.2027 A periodic access to line 215 is ensured Tiglarie Caransebes 27 215 Caransebes DA 144 15.01.2028 06.06.2028 A Tiglarie Timisoara 28 217 Remetea Mica DA 93 22.11.2025 22.02.2026 A Installation of temporary connection. Est Establishment of 2 turnouts at Aradu Nou (Line 1, Line II, 29 218 Aradu Nou Arad DA 124 25.05.2027 25.09.2027 A new Y-switch) 30 218 Aradu Nou Arad DA 152 25.10.2028 25.03.2029 A Project for the modernization of the manufacturing line Modernization of the Orțișoara (Y-end) and Vinga (X-end) interface zones; modernization of the DN69 underpass 31 218 Ortisoara Aradu Nou DA 124 25.05.2027 25.09.2027 A and construction of the Șag–Valea Viilor connecting track; modernization of the Valea Viilor–Aradu Nou (X-end) interface zone. Modernization of the DN69 underpass and construction 32 218 Sag Aradu Nou DA 124 25.05.2027 25.09.2027 A of the Săg-Viilor junction 33 218 Sag Aradu Nou DA 6 10.12.2028 15.12.2028 C Decommissioning of the Sag-Valea Viilor inflection point 34 218 Sanandrei Baile Calacea DA 6 20.09.2027 25.09.2027 C Establishing an inflection point 35 218 Sanandrei Baile Calacea DA 6 20.05.2028 25.05.2028 C Elimination of inflection Timisoara Ronat Triaj 36 218 DA 523 26.01.2026 02.07.2027 A Nord Gr.D 37 219 Aradu Nou Zadareni DA 124 25.05.2027 25.09.2027 A Modernization of the Aradu Nou North End interface area Ramificatia 38 220 Glogovat DA 01.09.2025 A liquidation Pod Mures 39 222 Sanandrei Periam DA 124 25.05.2027 25.09.2027 A 40 300 Racos Rupea DA 1 16.11.2027 16.11.2027 C 41 300 Rupea Cata DA 1 15.01.2026 15.01.2026 C Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 4 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România Full closure to connect the new line with the old line 42 300 Vinători Cristur DA 11 26.05.2026 05.06.2026 B towards Odorhei Full closure for diagonal reversal at the X HM Beia 43 300 Beia DA 2 01.11.2026 02.11.2026 A junction. 44 300 Aghires Poieni DA 233 08.01.2026 28.08.2026 A Cluj- 45 300 Aghires DA 669 01.07.2024 30.04.2026 A Napoca Episcopia Episcopia 46 300 DA 22 10.03.2026 31.03.2026 B Contact Wire Installation Bihor Bihor Fr Episcopia 47 300 Oradea Vest DA 52 10.10.2026 30.11.2026 A Full closure for line rehabilitation Bihor Full closure for the construction of the connection Episcopia 48 300 Oradea DA 91 01.06.2026 30.08.2026 A between the new Track II and Line 2A, and the installation Bihor of a turnout at the Oradea Y-end. Episcopia Installation of temporary connection at End X – Episcopia 49 300 Oradea DA 11 01.06.2026 11.06.2026 B Bihor Bihor. Full closure for the construction of the track shift 50 300 Oradea Est Oradea DA 7 23.03.2026 29.03.2026 C connecting the planned Track I and the existing Track II at PO04. Full closure to construct the connection between the 51 300 Osorhei Oradea Est DA 11 01.02.2026 11.02.2026 B planned Track II (Line III) and Switch 2 at the Oshorei Y- end. Full closure to construct the connection between the planned Track II (Line III) and existing turnout

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

4f238e0e84f61f204528e4de16053251e7c7de6325e57d1564978e6d2abeb3ad