of the Brașov – Predeal Railway Line
Technical data: rehabilitation a 26,9 km of railway line
Financing source: CEF 2014-2020 and the State Budget
Value of FS: RON 19.50 million (VAT excluded)
FS preparation duration: 2020-2023
Status: Feasibility study in progress.
2. Implementation of the Necessary Measures for the Operation of the ERTMS on the Predeal-
Bucharest-Constanța Railway Section and the Extension of the GSM-R System on the Basic Railway
Transport Network
Technical data: ERTMS deployment over a length of 367 km of railway line
Financing source: LIOP 2014-2020
Value of FS: RON 4.48 million (VAT excluded)
FS preparation duration: 2020-2024
Status: Feasibility study in progress
3. Feasibility Study (FS) and Technical Design (TD) for the Modernization of the Bucharest - Craiova
Railway Line
Technical data: preparation of the technical and economic documentation for the
modernization of 204.29 km of railway line
Financing source: CEF 2014 – 2020 and the State Budget
Subsection 1 : Bucureşti Nord – Roşiori Nord
Technical data: modernization of 95.520 km
Value of FS+TD: RON 34.29 million (VAT excluded)
Status: contract on the Feasibility Study and Designing in progress
Subsection 2 : Roşiori Nord
Technical data: modernization of 95.520 km
Value of FS+TD: RON 40 million (VAT excluded)
Status: contract on the Feasibility Study and Designing in progress
4. Feasibility Study for the Modernization of the Railway Line on the Bucureşti Nord - Jilava - Giurgiu
Nord - Giurgiu Nord Border Route – Lot 2
Technical data: preparation of the technical and economic documentation for the
modernization of 91 km of railway line
Financing source: LIOP 2014 – 2020
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 7 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Value of FS: RON 19,26 million (VAT excluded)
Status: contract on the preparation of the FS in progress. The FS to be completed and
approved in accordance with the law in force. The CEF 2 financing application
was approved for Lot 2. After the signing of the grant agreement, there will be
carried out the stages for launching the procurement procedures for the
project implementation.
B. THE ORIENT/EAST-MEDITERRANEAN CORRIDOR
(Arad – Timişoara – Craiova – Calafat)
B.I Projects Under Preparation
1. Rehabilitation of the Craiova – Calafat Railway Line, a component of the Orient/East-Mediterranean
Corridor.
Technical data: modernization of 107 km railway line
FS completed. The CEF 2 (2021-2027) financing application was rejected. The financing
application will be submitted again within the next call for proposals.
C. THE CORE AND COMPREHENSIVE TEN-T NETWORK
C.I Projects Under Implementation
1. Project for the Electrification and Rehabilitation of the Cluj Napoca – Oradea – Episcopia Bihorului
Railway Line
Technical data: rehabilitation of the Cluj Napoca – Oradea – Episcopia Bihorului (166.42 km)
Railway Line
Financing source: RRNP and the State Budget
Execution period: 2021-2026
Lot 1: Cluj Napoca - Aghireş
Technical data: rehabilitation of 30.411 km of railway line
Value of works: RON 1,611.48 million (VAT excluded)
Physical status: under designing
Lot 2: Aghireş - Poieni
Technical data: rehabilitation of 36.53 km of railway line
Value of works: RON 1,535.20 million (VAT excluded)
Physical status: under designing
Lot 3: Poieni – Aleșd
Technical data: rehabilitation of 52.74 km of railway line
Value of works: RON 2,117.17 million (VAT excluded)
Physical status: under designing
Lot 4: Aleșd – Border to Hungary
Technical data: rehabilitation of 46.74 km of railway line
Value of works: RON 2,416.85 million (VAT excluded)
Physical status: under designing
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 8 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
2. Projects of the ”Quick Wins” Type – Works for Eliminating Speed Restrictions and Reestablishing the
Technical Parameters of the Track Superstructure“
Technical data: small works for eliminating the speed restrictions by replacing, layer by layer,
the component elements of the track superstructure, which will lead to an
increase in the running speed of the passenger trains along 420 km of railway
line
Financing source: RRNP
QW The Timişoara Regional Railway Branch
Technical data: works over a length of 12.648 km of railway line on the Filiași – Tg. Jiu -
Petroșani – Simeria Railway Section, 5 lots of execution works
Total value of works: RON 56.14 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Braşov Regional Railway Branch
Technical data: works over a length of 76.734 km of railway line on the Copșa Mică – Sibiu and
Coșlariu – Cluj Napoca Railway Sections, 21 lots of execution works
Total value of works: RON 351.37 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Cluj Regional Railway Branch
Technical data: works over a length of 146.88 km of railway line on the railway sections:
Coșlariu - Cluj Napoca (54.763 km), Apahida - Dej Călători - Baia Mare (80.460
km), Arad – Oradea (7.916 km), Oradea – Satu Mare – Halmeu (2.072 km), Dej
Călători – Beclean – Ilva Mică (1.669 km), 49 lots of execution works
Total value of works: RON 744.56 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Craiova Regional Railway Branch
Technical data: works over a length of 64.095 km of railway line on the railway sections:
Pitești - Slatina – Craiova (13.042 km), Bucharest – Craiova (5.053 km), 26 lots
of execution works
Total value of works: RON 308.20 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Bucharest Regional Railway Branch
Technical data: works over a length of 66.51 km of railway line on the Bucharest – Craiova
Railway Section, 15 lots of execution works
Total value of works: RON 286.88 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Galaţi Regional Railway Branch
Technical data: works over a length of 12.065 km of railway line on the Mărășești - Tecuci -
Bârlad - Vaslui – Iași and Adjud – Siculeni railway sections, 6 lots of execution
works
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 9 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Total value of works: RON 73.08 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
QW The Iaşi Regional Railway Branch
Technical data: works over a length of 41.837 km of railway line on the Tecuci – Iași Railway
Section
Total value of works: RON 163.61 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
3. Projects of the ”Renewals“ Type – “Bucharest - Pitești – Works for Replacing, Layer by Layer, the
Component Elements of the Track Superstructure”
Technical data: replacement, layer by layer, of the component elements of the track
superstructure, between Bucharest and Pitești, along a length of 217
km
Financing source: RRNP
The Craiova Regional Railway Branch
Technical data: renewal works along a length of 21.022 km of railway line related to
Lot: Călinești + Golești Track I and Track II and Golești + Pitești, Km
95+000 + Km 107+575
Total value of works: RON 82.13 million (VAT excluded)
Status: works contracts launched in 2023.
Deadline for work completion – by 31.12.2026
C.II Projects In the Sectoral Public Procurement Procedure
1. Projects of the ”Renewals“ Type – “Bucharest - Pitești – Works for Replacing, Layer by Layer, the
Component Elements of the Track Superstructure”
Technical data: replacement, layer by layer, of the component elements of the track
superstructure, between Bucharest and Pitești, along a length of 217
km
Financing source: RRNP
The Bucharest Regional Railway Branch
Technical data : renewal works along a length of 196.7 km of railway line related to Lot
1: the Route Chitila – Ciocănești Track II and Ciocănești- Titu Track I
and Track II from Km 10+600 to Km 49+780, running and through lines
and lines in stations, and Lot 2: the Route Titu- Călinești-Golești Track I
and Track II from Km 49+980 to Km 95+00, running and through lines
and lines in stations
Estimated value of works: RON 663.61 million (VAT excluded)
Status : the two procurement procedures are in the tender reassessment
stage
Implementation duration – 36 months of execution
2. Project ~Modernization/Consolidation/Rehabilitation of the Gara de Nord București Railway Station
– Phase I”
Financing source: the 2021-2027 Transport Programme
Estimated value of works: RON 471.15 million (VAT excluded)
Status: in the tender assessment procedure
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 10 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Implementation duration – 116 months (9 months of designing + 46 months of execution + 60 months
of warranty)
3. Project “Modernization/Rehabilitation of 47 Railway Stations in Romania – the Videle Railway
Station
Financing source: the 2021-2027 Transport Programme
Estimated value of works: RON 9.31 million (VAT excluded)
Status: in the tender assessment procedure
Implementation duration – 61 months (6 months of designing +18 months of works + 1 month of
completion + 36 of warranty)
4. Project “Modernization/Rehabilitation of 47 Railway Stations in Romania – the Ploiești Vest Railway
Station
Financing source: the 2021-2027 Transport Programme
Estimated value of works: RON 18.79 million (VAT excluded)
Status: in the tender assessment procedure
Implementation duration – 61 months (6 months of designing +18 months of works + 1 month of
completion + 36 of warranty)
5. Project Modernization /Rehabilitation of 47 Railway Stations in Romania – the Bușteni Railway
Station
Financing source: the 2021-2027 Transport Programme
Estimated value of works: RON 10.78 million (VAT excluded)
Status: in the tender assessment procedure
Implementation duration – 61 months (6 months of designing + 18 months of works + 1 month of
completion + 36 of warranty)
6. Project Modernization /Rehabilitation of 47 Railway Stations in Romania – the Sinaia Railway
Station
Financing source: the 2021-2027 Transport Programme
Estimated value of works: RON 11.56 million (VAT excluded)
Status: in the tender assessment procedure
Implementation duration – 85 months (6 months of designing +18 months of works + 1 month of
completion + 60 months of warranty)
7. Project “Modernization of the Railway Infrastructure in the Constanța Port - Stage I, Valu lui Traian”
Financing source: CEF 2021-2027
Estimated value of works: RON 456.93 million (VAT excluded)
Status: in the tender submission stage
Implementation duration – 90 months (9 months of designing + 20 months of execution + 60
months of warranty + 1 month of completion
C.III Projects Under Preparation
1. The Bucureşti Nord – Aeroport Internaţional Henri Coandă Bucureşti Railway Line – Reviewing of the
Feasibility Study - Phase II
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 11 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Technical data: modernization and construction of the Bucureşti Nord – Aeroport
Internaţional Henri Coandă Bucureşti Railway Line
Financing source: LIOP 2014 - 2020
Status of FS: FS preparation contract in progress
2. Feasibility Study for the Rehabilitation of the Ploiești-Triaj – Focșani Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the documentation
necessary for the rehabilitation of 143 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 15.96 million (VAT excluded)
Status of FS: FS preparation contract in progress
3. Feasibility study for the Rehabilitation of the Focşani – Roman Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the documentation
necessary for the rehabilitation of 147 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 19.26 million (VAT excluded)
Status of FS: FS preparation contract in progress
4. Feasibility study for the Rehabilitation of the Roman-Pașcani-Iași-Border Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the documentation
necessary for the rehabilitation of 140 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 16.50 million (VAT excluded)
Status of FS: FS preparation contract in progress
5. Feasibility study for the Rehabilitation of the Paşcani – Dărmăneşti Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the documentation
necessary for the rehabilitation of 71 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 8.40 million (VAT excluded)
Status of FS: FS preparation contract in progress
6. Feasibility study for the Rehabilitation of the Dărmăneşti - Vicşani – Border Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the documentation
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
adb0680237e6b5473aa50b8812155c949853fff1cd31a8190f467b510ea79b22