Textul documentului
necessary for the rehabilitation of 34 km of railway line
Status: The Government Decision No. 125/2023 regarding the technical and economic
indicators of the investment. After signing the agreement for the financing
from CEF 2021-2027, there will be launched the procurement procedures for
the implementation of the project for the electrification of the Lot: the Vicșani
– Vadul Siret Railway Line
7. Modernization/Consolidation/Rehabilitation of the Gara de Nord Bucureşti Railway Station -
Feasibility Study
Technical data: modernization/consolidation/rehabilitation of 1 railway station
Financing source: LIOP 2014 – 2020
Value of FS: RON 11.3 million (VAT excluded)
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 12 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Status: FS preparation contract in progress for Stages II and III
8. Feasibility Study for the Feasibility Study and Designing for the Modernization of the Apahida-
Suceava Railway Line
Technical data: preparation of the technical and economic documentation for 310 km
of railway line
Financing source: CEF 2014 – 2020
Subsection 1: Apahida - Ilva Mică
Technical data: modernization a 119 km
Value of FS+TD: RON 29.68 million (VAT excluded)
Status: FS preparation and designing contract in progress
Subsection 2: Ilva Mică - Pojorâta
Technical data: modernization a 106 km
Value of FS+TD: RON 49.31 million (VAT excluded)
Status: FS preparation and designing contract in progress
Subsection 3: Pojorâta - Suceava
Technical data: modernization a 85 km
Value of FS+TD: RON 35.70 million (VAT excluded)
Status: FS preparation and designing contract in progress
9. Feasibility Study for the Feasibility Study and Designing for the Modernization of the Coșlariu – Cluj
Napoca Railway Line
Technical data: preparation of the technical and economic documentation for 99 km
of railway line
Financing source: CEF 2014 – 2020
Value of FS+TD: RON 41.84 million (VAT excluded)
Status: FS preparation and designing contract in progress
10. Feasibility Study for the Modernization of the Lines and Systems in the Bucharest Railway Complex
Technical data: preparation of the technical and economic documentation for 605 km
of railway line
Financing source: CEF 2014 – 2020
Value of FS: RON 20.74 million (VAT excluded)
Status: FS preparation and designing contract in progress
11. Modernization/rehabilitation of 47 railway stations in Romania
Technical data: modernization/rehabilitation of 47 railway stations in Romania (the railway
stations: Satu Mare, Baia Mare, Jibou, Dej Călători, Beclean pe Someș, Valea
lui Mihai, Carei, Salonta, Miercurea Ciuc, Fagaras, Sebes Alba, Gheorghieni,
Reghin, Aiud, Teius, Razboieni, Târgoviște, Ploiești Vest, Sinaia, Bușteni, Videle,
Titu, Neptun hc, Costinesti Tabara, Ciulnita, Mangalia, Târgu Jiu, Alexandria,
Caracal, Filiași, Roșiori Nord, Piatra Olt, Suceava Nord, Pașcani, Vatra Dornei
Bai, Verești, Dolhasca, Gura Humorului, Râmnicu Sărat, Adjud, Comăneşti,
Făurei, Tecuci, Mărăşeşti, Băile Herculane, Petroșani, Orșova)
Financing source: LIOP 2014 – 2020
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 13 / 14
Compania Naţională de Căi Ferate “CFR” S.A. Romania
Total value of FS: RON 18.26 million (VAT excluded)
Status: the technical and economic documentations approved for the stations: Titu,
Bușteni, Ploiești Vest, Sinaia, Târgoviște Sud, Videle, Băile Herculane, Orșova,
Dej Călători, Beclean pe Someș, Făgăraș, Sebeș Alba, Gheorgheni, Reghin,
Aiud, Teiuș, Războieni, Suceava Nord, Pașcani, Vatra Dornei Băi, Verești,
Dolhasca, Gura Humorului, Neptun hc, Costinești Tabără, Ciulnița, Mangalia.
The completion of the technical and economic documentations for other
railway stations in progress.
8. Rehabilitation Works on Railway Bridges, Culverts and Tunnels – Stage II
Technical data; 149 objectives
Financing source: LIOP 2014 – 2020
Total value of FS: RON 13.69 million (VAT excluded)
Status: the technical and economic documentation for 83 objectives. The completion
of the technical and economic documentations for the remaining objectives in
progress.
12. Modernization of Level-Crossings
Technical data: rehabilitation of at least 150 level-crossings
Financing source: LIOP 2014 – 2020
Total value of FS: RON 11.2 million (VAT excluded)
Status: the technical and economic documentation for 60 objectives. The completion
of the technical and economic documentations for the remaining objectives in
progress
13. Feasibility Study for the Electrification of the Răduleşti – Giurgiu Nord Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the necessary
documentation, including the general estimate, in accordance with the law in
force, for launching the works for the electrification of 57 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 2.90 million (VAT excluded)
Status: FS preparation contracts in progress.
14. Feasibility study for the Electrification and Rehabilitation of the Constanta-Mangalia Railway Line
Technical data: The purpose of the Feasibility Study is to prepare the necessary
documentation, including the general estimate, in accordance with the law in
force, for launching the works for the electrification of 43 km of railway line
Financing source: LIOP 2014 - 2020
Value of FS: RON 7.7 million (VAT excluded)
Status of FS: FS preparation contracts in progress.
CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 14 / 14
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
adb0680237e6b5473aa50b8812155c949853fff1cd31a8190f467b510ea79b22