Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

CFR development project

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:55
Dimensiunea materialului
533,2 KB

Conținutul disponibil în colecție

Textul documentului

CFR NETWORK STATEMENT - 2026 ANNEX 12.b PROJECTS FOR THE MODERNIZATION OF THE RAILWAY INFRASTRUCTURE RELATED TO THE EUROPEAN CORRIDORS AND THE TEN-T NETWORK Validity: 14.12.2025 – 12.12.2026 Version: 15.0.0 Update: 15.12.2024 Compania Naţională de Căi Ferate “CFR” S.A. Romania Contents A. The Rhine – Danube Corridor ................................................................................................... 3 A.I Projects Under Implementation ......................................................................................................... 3 A.II Projects Under Public Procurement ................................................................................................. 5 A.III Projects Under Preparation................................................................................................................ 7 B. The ORIENT/EAST-MEDITERRANEAN Corridor ...................................................................... 8 B.I Projects Under Preparation................................................................................................................ 8 C. The Core and Comprehensive TEN-T Network ........................................................................ 8 C.I Projects Under Implementation ......................................................................................................... 8 C.II Projects In the Sectoral Public Procurement Procedure .............................................................. 10 C.III Projects Under Preparation.............................................................................................................. 11 CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 2 / 14 Compania Naţională de Căi Ferate “CFR” S.A. Romania The projects for the development of the railway infrastructure related to the European corridors and the TEN-T network, carried out by CNCF "CFR" -SA and financed from external grants are: A. THE RHINE – DANUBE CORRIDOR (BORDER–CURTICI–ARAD–TIMIȘOARA/MORAVIȚA/BRAŞOV/CRAIOVA–BUCUREŞTI– GIURGIU/CONSTANŢA - SULINA) A.I Projects Under Implementation 1. The Border-Curtici-Arad-Km 614 Route Technical data: rehabilitation of 41.185 km Technical data: rehabilitation of 91.583 km of railway line Financing source: project initially financed from SOP-T 2007-2013, from the State Budget at present Value of works: RON 1,080.48 million (VAT excluded) Physical status: 99.00% 2. Rehabilitation of the Coşlariu – Simeria Railway Line – phased project Technical data: rehabilitation of 75.28 km of railway line Financing source: Phase I – financed from SOP-T 2007-2013, Phase II – financed from LIOP 2014-2020 2.1 Simeria - Vinţu de Jos Section: Technical data: rehabilitation of 42.26 km Value of works: RON 1,350.52 million (VAT excluded) Physical status: 99.95%. Project in the warranty period. Undergoing final acceptance 2.2 Vinţu de Jos – Coşlariu Section: Technical data: rehabilitation of 33.02 km Value of works: RON 766. 92 million (VAT excluded) Physical status: 99.95%. Project in the warranty period. 3. Rehabilitation of the Coşlariu – Sighişoara Railway Line, (91.583) km – phased project Technical data: rehabilitation of 91.583 km of railway line Financing source: Phase I – financed from SOP-T 2007-2013, Phase II – financed from LIOP 2014- 2020 3.1. Coşlariu – Micăsasa Section: Technical data: rehabilitation of 36.645 km of railway line; Value of works: RON 721.85 million (VAT excluded) Physical status: 100%. Final acceptance performed in April 2023 3.2. Micăsasa – Aţel Section: Technical data: rehabilitation of 29.624 km of railway line, Value of works: RON 747.50 million (VAT excluded) Physical status: 99.95%. Project in the warranty period. Undergoing final acceptance 3.3. Aţel – Sighişoara Section: Technical data: rehabilitation of 25.314 km of railway line, Value of works: RON 866.79 million (VAT excluded) CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 3 / 14 Compania Naţională de Căi Ferate “CFR” S.A. Romania Physical status: 100%. Final acceptance performed in May 2023 4. Works related to ERTMS , GSM-R , Electronic Interlocking System: Simeria - Sighişoara Financing source: Phase I – financed from SOP-T 2007-2013, Phase II – financed from LIOP 2014-2020 Value of works: RON 498.29 million (VAT excluded) Physical status: 98.90% on the Simera – Coşlariu Section, 99.10% on the Coşlariu - Sighişoara Section 5. Project for the Rehabilitation of the Km 614- Gurasada – Simeria Railway Line Technical data: Rehabilitation of 144 km of railway line between Simeria and Km 614, including all the related structures and auxiliary works, and the introduction of ERTMS/ETCS Level 2 Financing source: LIOP 2014-2020 Execution period: 2017-2024 a. Subsection 2a: Km 614- Cap Y Bârzava Technical data: rehabilitation of 41.912 km of railway line Value of works: RON 1,998.57 million (VAT excluded) in acc. with the addenda Physical status: 85.44% b. Subsection 2b: Cap Y Bârzava – Cap Y Ilteu Technical data: rehabilitation of 36.042 km of railway line Value of works: RON 2,085.56 million (VAT excluded) in acc. with the addenda Physical status: 85.70% c. Subsection 2c: Cap Y Ilteu – Cap Y Gurasada Technical data: rehabilitation of 22.341 km of railway line Value of works: RON 1,783.89 million (VAT excluded) in acc. with the addenda Physical status: 63.25% d. Section 3: Cap Y Gurasada – Cap Y Simeria Technical data: rehabilitation of 40.883 km of railway line Value of works: RON 3,101.19 million (VAT excluded) in acc. with the addenda Physical status: 76.50% 6. Rehabilitation of the Simeria – Braşov Railway Line, a component of the Rhine – Danube Corridor, for the traffic at a maximum speed of 160 km/h, the Braşov - Sighişoara Section, Subsections: 1. Braşov – Apaţa and 3. Caţa – Sighişoara (85 km) Technical data: modernization of the Braşov – Apaţa (38 km) and Caţa – Sighişoara (47 km) railway sections at European standards regarding the technical specifications for interoperability (maximum speed of 160 km/h, ERTMS/ETCS Level 2, axle load of 22.5 t, facilities for the access of the persons with reduced mobility) Financing source: CEF 2014 – 2020 and the State Budget Value of works: RON 3,007.21 million (VAT excluded) in acc. with the addenda Execution period: 2020-2025 Physical status: 22.24% CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 4 / 14 Compania Naţională de Căi Ferate “CFR” S.A. Romania 7. Rehabilitation of the Simeria – Braşov Railway Line, a component of the Rhine – Danube Corridor, for the traffic at a maximum speed of 160 km/h, the Braşov - Sighişoara Section, Subsections: 2. Apaţa - Caţa Technical data: modernization of the Apaţa - Caţa (28 km) railway section at European standards regarding the technical specifications for interoperability (maximum speed of 160 km/h, ERTMS/ETCS Level 2, axle load of 22.5 t, facilities for the access of the persons with reduced mobility) Financing source: CEF 2014-2020 and the State Budget Value of works: RON 2,742.48 million (VAT excluded) in acc. with the addenda Execution period: 2020-2026 Physical status: 22.24% 8. Works in the Feteşti and Ciulniţa Railway Stations, on the Bucharest – Constanţa Railway Line Technical data: works that remained to be performed in the Feteşti and Ciulniţa Railway Stations Financing source: LIOP 2014 – 2020 Value of works: RON 309.20 million (VAT excluded) Physical status: 3.65% 9. Project for the Modernization of the Caransebeș – Timisoara – Arad Railway Line Technical data: modernization of the Arad-Timișoara-Caransebeș (162.9 km) Railway Line ERTMS Deployment (ETCS Level 2+GSM-R) Financing source : RRNP (The Recovery and Resilience National Plan) and the State Budget Execution period: 2023-2026 Lot 2: Lugoj – Timișoara Est Technical data: modernization of 53.91 km of railway line Value of works: RON 1,916.22 million (VAT excluded) Physical status: under designing Lot 3: Timișoara Est – Ronaț Triaj Gr. D Technical data: modernization of 13.86 km of railway line Value of works: RON 1,440.43 million (VAT excluded) Physical status: under designing Lot 4: Ronaț Triaj Gr. D – Arad Technical data: modernization of 54.86 km of railway line and Aradu Nou – Glogovăţ Value of works: RON 2,184.17 million (VAT excluded) Physical status: under designing 10. Project for the Modernization of the Bucureşti Nord - Jilava - Giurgiu Nord - Giurgiu Nord Border Railway Line - Lot 1: Reopening of the railway traffic on the bridge over the Argeş River, between Vidra and Comana Technical data: infrastructure/superstructure works over 12.02 km (the Vidra Station, from Km 18+180 - the Comana Station, km 30+200), works of art and related works along the whole route, 2 new stations, 4 new bridges, 10 new culverts, Financing source: project initially financed from LIOP 2014-2020 and then from CEF 2021-2027 + the State Budget Value of works: RON 571.91 million (VAT excluded) in acc. with the addenda Execution period: 2021-2023 Physical status: 75.64% A.II Projects Under Public Procurement 1. Modernization of the Railway Infrastructure in the Constanța Port – Stage I Valu lui Traian Technical data: modernization of 257 km of single-track line, new construction of 13.6 km of single-track line CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 5 / 14 Compania Naţională de Căi Ferate “CFR” S.A. Romania Financing source: CEF 2021-2027 + the State Budget Estimated value of designing RON 456.93 million (VAT excluded) and execution works: Implementation duration: 90 months: 9 months (Design for the building permit, Execution technical design and Building permit) + 20 months (work execution) + 60 months (warranty period) + 1 month (closing period). Procedure status: Tender submission deadline postponed to 08.08.2023 2. Project for the Modernization of the Caransebeș–Timisoara-Arad Railway Line Technical data: modernization of the Arad-Timișoara-Caransebeș (162.9 km) Railway Line, ERTMS Deployment (ETCS Level 2+GSM-R) Financing source: RRNP and the State Budget Execution period: 2021-2026 Lot 1: Caransebeș - Lugoj Technical data: modernization of 39.56 km of railway line Estimated value of works: RON 1,437.75 million (VAT excluded) Status: disputed procurement procedure 3. Rehabilitation of the Caransebes–Drobeta Turnu Severin Severin-Craiova Railway Line, a component of the Orient/East-Mediterranean Corridor Technical data: modernization of 234 km of railway line Financing source: TP 2021-2027 Status : procurement procedures launched in 2023 Lot 1: Craiova - Filiași Technical data: rehabilitation of 37.975 km of railway line Implementation duration: 117 months (12 months of designing + 42 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 1,532.19 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 Lot 2: Filiași - Igiroasa Technical data: rehabilitation of 44.265 km of railway line Implementation duration: 123 months (12 months of designing + 48 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 1,249.78 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 Lot 3: Igiroasa – Drobeta Tr. Severin Technical data: rehabilitation of 41.234 km of railway line Implementation duration: 135 months (12 months of designing + 60 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 3,377.16 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 Lot 4: Drobeta Tr. Severin – Băile Herculane Technical data: rehabilitation of 41.618 km of railway line Implementation duration: 135 months (12 months of designing + 60 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 1,605.33 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 CFR NETWORK STATEMENT - 2026 ANNEX 12.b Version: 15.0.0 Update: 15.12.2024 Page: 6 / 14 Compania Naţională de Căi Ferate “CFR” S.A. Romania Lot 5: Băile Herculane – the new stopping point Poarta Technical data: rehabilitation of 32.637 km of railway line Implementation duration: 123 months (12 months of designing + 48 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 1,595.91 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 Lot 6: The new stopping point Poarta - Caransebeș Technical data: rehabilitation of 37.160 km of railway line Implementation duration: 135 months (12 months of designing + 60 months of execution + 60 months of warranty + 3 months of final acceptance approval) Estimated value of works: RON 1,456.49 million (VAT excluded) Status: Tender submission deadline postponed to 04.09.2023 A.III Projects Under Preparation 1. Rehabilitation

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

adb0680237e6b5473aa50b8812155c949853fff1cd31a8190f467b510ea79b22