Secțiuni și tabele
Qualitative Quantitative indicators Indicative timeline
Related Measure Further
Milestone/ indicators (for targets) for completion Responsibility
Num (Reform or Name specification
Target (for for reporting and Verification mechanism
Investment) (where
milestones) implementation
Unit of necessary)
Baseline Goal Quarter Year
measure
framework for • The decision issued by ANRE
private withdrawing the license to operate
investment in power generation capacities of a
renewable cumulative 2 025MW of coal and
electricity lignite-fired installed electricity
production production.
- • Certification from the TSO of
disconnection and decommissioning from the NTS of a cumulative 2 025MW of coal and lignite-fired installed electricity production, endorsed by the relevant ministry. b) for the mothballed capacity:
- • Copy of the certification from the
TSO of mothballed capacity;
- • Copy of the rules governing the
activation of coal and lignite-based
electricity production capacities
during the mothballing period as
approved by ministerial order.
116 Reform 1. Milestone Entry into Provision in Q2 2023 Ministry of Copy of the publication in the Official
Electricity market force of the the law Energy Journal for primary legislation and the
reform, New Energy indicating the secondary legislation that is critical for
replacement of Law entry into achieving the objectives described in the
coal in the energy force of the milestone and in the CID and reference to
mix and support Energy Law the relevant provisions indicating the
for a legislative entry into force, accompanied by a
and regulatory document duly justifying how the
framework for milestone (including all the constitutive
private elements) was satisfactorily fulfilled
investment in
renewable
electricity
production
117 Reform 1. Milestone Signature of Signature of Q4 2023 Ministry of Summary document duly justifying how
Electricity market contracts for all contracts Energy the milestone (including all the
reform, Difference for constitutive elements) was satisfactorily
replacement of renewable fulfilled. This document shall include as
coal in the energy sources
26
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c72f4c753645594284a4468173145d1a9c1d7855c09b5e5aab89bf33949e6313