Operational Arrangements between the European Commission and Romania
- Instituția sau publicația sursă
- PNRR România, plan și decizii
- Data preluării
- 26.09.2026 17:54
- Dimensiunea materialului
- 5.789,4 KB
Conținutul documentului colectat
Secțiuni și tabele
Qualitative Quantitative indicators Indicative timeline
Related Measure Further
Milestone/ indicators (for targets) for completion Responsibility
Num (Reform or Name specification
Target (for for reporting and Verification mechanism
Investment) (where
milestones) implementation
Unit of necessary)
Baseline Goal Quarter Year
measure
and regulatory • The decision issued by the Energy
framework for Regulator (ANRE) withdrawing the
private license to operate power generation
investment in
capacities of 1 695MW of coal-fired
renewable
electricity installed electricity production
production capacity.
- • Certification from the Transmission
System Operator (TSO) of
disconnection and decommissioning
from the National Transmission
System (the NTS) of 1 695MW of
coal-fired installed electricity
production capacity, endorsed by the
relevant ministry.
114 Reform 1. Milestone Entry into Provision in Q2 2022 Ministry of Copy of the publication in the Official
Electricity market force of the the law Energy Journal, accompanied by a summary
reform, Decarbonisati indicating the document duly justifying how the
replacement of on law entry into milestone was satisfactorily fulfilled. This
coal in the energy adopting the force of the summary document shall include a
mix and support coal/lignite legislative act reference to the relevant provisions
for a legislative phase-out indicating the entry into force and to the
and regulatory calendar provisions which fulfil the relevant
framework for elements of the milestone, as listed in the
private description of milestone and the
investment in corresponding measure in the CID annex,
renewable with appropriate links to or copies of the
electricity document(s) mentioned in the summary
production document.
115 Reform 1. Target Decommissio Megawatt 1 695 2 355 Q4 2022 Ministry of Summary document duly justifying how
Electricity market ning of s (MW) Energy the target (including all the constitutive
reform, lignite-fired elements) was satisfactorily fulfilled. This
replacement of power- document shall include as an annex the
coal in the energy production following documentary evidence:
mix and support capacity
for a legislative a) for the decommisioned capacity:
and regulatory
25
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c72f4c753645594284a4468173145d1a9c1d7855c09b5e5aab89bf33949e6313