Conținutul documentului colectat
Secțiuni și tabele
Qualitative Quantitative indicators Indicative timeline
Related Measure Further
Milestone/ indicators (for targets) for completion Responsibility
Num (Reform or Name specification
Target (for for reporting and Verification mechanism
Investment) (where
milestones) implementation
Unit of necessary)
Baseline Goal Quarter Year
measure
mix and support an annex the following documentary
for a legislative evidence:
and regulatory
framework for a) copy of the signed contracts,
private including official references of the
investment in signed contracts
renewable b) extract of the relevant parts of the
electricity specifications of the contracts proving
production alignment with the description of the
milestone and of the description of the
investment in the CID, including
compliance with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01), as specified in the
CID Annex.
118 Reform 1. Milestone Signature of Signature of Q2 2025 Ministry of Summary document duly justifying how
Electricity market contracts for award of all Energy the milestone (including all the
reform, Difference for contracts constitutive elements) was satisfactorily
replacement of renewable fulfilled. This document shall include as
coal in the energy sources an annex the following documentary
mix and support evidence:
for a legislative
and regulatory a) copy of the signed contracts,
framework for including official references of the
private signed contracts
investment in b) extract of the relevant parts of the
renewable specifications of the contracts proving
electricity alignment with the description of the
production milestone and of the description of the
investment in the CID, including
compliance with the ‘Do no
significant harm’ Technical Guidance
(2021/C58/01), as specified in the
CID Annex.
119 Reform 1. Target Decommissio Megawatt 2 355 3 780 Q4 2025 Ministry of Summary document duly justifying how
Electricity market ning of s (MW) Energy the target (including all the constitutive
reform, lignite-fired elements) was satisfactorily fulfilled. This
replacement of power document shall include as an annex the
coal in the energy following documentary evidence:
27
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c72f4c753645594284a4468173145d1a9c1d7855c09b5e5aab89bf33949e6313