Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul documentului colectat

Secțiuni și tabele

                                  Compania Naţională de Căi Ferate “CFR” S.A.                                                  România
                                 2   Internal railway line OIL TERMINAL SA       Railway shunting; railway wagons downtime on private railway infrastructure
                                     CONSTANTA - Port Platform – Line
                                     group 10F, 11F, 12F
                                3    Internal railway line OIL TERMINAL SA Railway shunting
                                     CONSTANTA – Port Platform
3.2   Facility no. 1           Name                   Internal railway line OIL TERMINAL SA CONSTANTA – South Platform
                               Location               Internal railway line connected from North Agigea St.
                               Operation period        Undetermined, according to exploitation Authorization
                               Technical               BEFORE STATION= 4633 m rail on 4 lines for receipt/dispatch, 3 electrified ones; RAMP = 3128 m rail on
                               characteritics
                                                       4 lines of loading/discharging; 12 diverters
                               Planned changes          None
3.3   Facility no. 2           Name                    Internal railway line OIL TERMINAL SA CONSTANTA - Port Platform – Line group 10F,11F,12F
                               Location                Internal railway line connected from Constanta Port Mol5 St.
                               Operation period        Undetermined, according to exploitation Authorization
                               Technical               832 m rail on 3 non electrified lines- 2 lines for discharging/loading and 1 avoiding line; 2 diverters
                               characteritics
                               Planned changes         NONE
3.4   Facility no. 3           Name                    Internal railway line OIL TERMINAL SA CONSTANTA - Port Platform
                               Location                Internal railway line connected from Constanta Port Mol5St.
                               Operation period        Undetermined, according to exploitation Authorization
                               Technical               2722 m rail on 7 non electrified lines for discharging/loading; 8 diverters
                               characteritics
                               Planned changes         None

4. Tariffs

4.1   Information on tariffs   OIL TERMINAL SA Constanta’s TARIFFS
                               1.Tariff for shunting based on time (for shunting railway wagons using Oil Terminal’s equipment and staff, at the request of the
                               railway transport operators-OTF) = 250 EUROS per half hour started (VAT excluded)
                               2. Tariff for railway wagons parking on private railway infrastructure = 2,50 EUROS/hour/wagon (VAT excluded)
                               3. Tariff for access to private railway infrastructure (in-out) = 4,50 EUROS/wagon (VAT excluded)
                               4. Tariff for train withdrawal = 200 EUROS/ day started (VAT excluded)
                                5.Tariff for static weighing = 125 EUROS/wagon (VAT excluded)

Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963