Compania Naţională de Căi Ferate “CFR” S.A. România
4.2 Information on charges SC West Trans Rail does not offer charge reductions OTFs.
reductions
5. Access conditions
The access of an OTF on the traffic section managed by S.C. Vest Trans Rail SRL is made only on the basis of an access
contract within the term of validity concluded between VTR and OTF, which must hold a Transport license, a Single Safety
5.1 Legal requirements Certificate, within the term of validity, and in Annex B belonging to CUS be introduced the Ploiesti Crang –Ploiesti section.
The framework contract for access to non-interoperable infrastructure managed by VTR is the one practiced by CNCF CFR
S.A.
- - Maximum speed: 25 km / h at a maximum tonnage of 700 (t) when pushing;
- - Maximum traffic speed 30Km / h at a tonnage of 700 (t) when pulling;
5.2 Technical conditions
- - The situation of the Lines and the switches is provided in site 1 chapter 2 - PTE-Hm Ploiesti Crang
- - The situation of the light signals and indicators as well as the declivity is provided in situation 2 chapter 2 - PTE Hm.
Ploiesti Crang. 5.3 Self-service - Not applicable
5.4 IT systems VTR provides conditions for the use of information systems according to the legislation in force.
6. Allocation of service capacity
Requesting access for any OTF that has a valid access contract, it can make a written request sent by e-mail to the VTR
6.1 Allocation of service capacity
management with a maximum of 8 hours before being allowed access.
The access requests are also analyzed depending on the availability of the parking lines belonging to Hm. Ploiesti Crang are
6.2 Response to request accepted or not, the degree of occupation of the lines undergoing a constant change.
VTR does not apply priority criteria for access to infrastructure regardless of the applicant.
Any planned modification of the capacity of the service infrastructure which may produce a major impact/ temporary
Available capacities and
6.3 restrictions on the operation of the service infrastructure shall be made only with prior notice to the infrastructure
temporary restrictions
manager and after receiving his acceptance.
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963