Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul disponibil în colecție

Textul documentului

SERVICE INFRASTRASTRUCTURE OPERATED BY OMV PETROM SA Station: CFR Dornesti Service Infrastructure Operator (OIS): UNICOM HOLDING SA Service Infrastructure in the Railway Station Nr. Title General Information crt 1. General Information 1.1 Service Infrastructure UNICOM HOLDING S.A., Operator Address Voluntari, 1-IA Pipera Blvd, block A, 6th floor, Ilfov county, postal code 077190,VAT payer no 3507700,company reg.no. J23/2399/2011 Fax.0212329916/28, mobile 0740 041 320/0740247762, e-mail :holding @unicom-group.ro, website: http://unicom- holding.ro, managing the private industrial line Unicom Holding S.A.- Dornesti working point , Locality: Dornesti, at 20S Cucului St, Suceava county The economical agents (rail transport operators), providing shunting and/or rail transport services/operations on LFI (Industrial Rail Lines) in Dornesti Terminal, Suceava county, are: a) S.N.T.F.M. „CFR MARFA” S.A., contact: Address: 38 Dinicu Golescu St, sector 1, Bucharest Tel.: +40372.840.001; Fax: +4021.225.11.13 Email: [email protected] ; www.cfrmarfa.com b) GRUP FEROVIAR ROMAN S.A., contact: Address: 114 Calea Victoriei, sector 1, 010092, Bucharest Tel.: +4021 318 3090, +4037 233 6010 Fax: +4021 318 3091, +4037 233 6011 Email: [email protected] ; https://gfr.ro/ c) UNICOM TRANZIT S.A., date de contact: Address: 1-IA Pipera Blvd, block A, floors 2-5, block B, floor 2, Voluntari 077190, Ilfov, România Tel: +40 21 232 99 48;+40 21 232 99 49 Fax: +40 21 232 99 48 Compania Naţională de Căi Ferate “CFR” S.A. România Email: [email protected] ; https://unicom-tranzit.ro/ d) CARGO TRANS VAGON S.A., contact: Address: 34 Vaselor St, sector 2, 021254, Bucuresti Tel: +4 0372.245.012; +4 0372.245.080 Fax +4 021.212.33.57 Email: [email protected]; https://www.cargotransvagon.ro/ 1.2 Validity period and Permanent, any time necessary and in case of any amendments, currently under licencing new wide gauge lines 833 LM and updating normal lines 872 LM process 2. Services 2.1 Access of convoys Description of services Access to industrial lines and/or freight terminal property of Unicom Holding and operated in part / whole by other RTO economical agents and which are connected to the CFR Dornesti infrastructure Type Basic 2.2 Shunting of rail vehicles Description of services Shunting operations on the Unicom Holding Dornesti - CFR Dornesti railway infrastructure Type Basic 2.3 Stationing of rolling stock Description of services Stationing of rolling stock within terminals Type Basic 2.4 Transfusion Description of services Transfusion services provided within terminals Type Basic 2.5 Storage Description of services Storage in storage tanks, loading / unloading Type Basic 2.6 Fuel supply Description of Fuel supply within the services infrastructures / freight terminal services Type Basic Compania Naţională de Căi Ferate “CFR” S.A. România 3. Description of the service infrastructures 3.1 List of all installations in No Name Services provided Dornesti Terminal/ 1 Industrial railway LFI 1 CL (wide Access of convoys to /from the CFR S.A Dornesti railway infrastructure, shunting, working point gauge) operational stay; 2 Industrial railway LFI 2 CL (wide Access of convoys to /from the CFR S.A Dornesti railway infrastructure, shunting, gauge) operational stay; transfusion; fuel supply to locomotives with a mobile fuel distribution station 3 Industrial railway LFI 4 CL (wide Access of convoys to /from the CFR S.A Dornesti railway infrastructure, operational gauge) stay; transfusion; 4 Industrial railway LFI 2 CN Access of convoys to /from the CFR S.A Dornesti railway infrastructure, shunting, (normal gauge) operational stay; fuel distribution to locomotives with a mobile fuel distribution station 5 Industrial railway LFI 3 CN Access of convoys to /from the CFR S.A Dornesti railway infrastructure, operational (normal gauge) stay; transfusion; fuel supply to locomotives with a mobile fuel distribution station 3.2 Service Infrastructure Name Dornesti Terminal/working point Location Loc.Dornesti,str,Cucului nr.20 S,jud.Suceava Opening hours General : 8 – 17; special circumstances 24 hrs Technical Industrial railway LFI 1 CL (wide gauge) characteristics wide gauge rail: 402,86 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines of Unicom Holding S.A. Working point Dornesti, wide gauge – attached to the Operating License series AE nr. 336- R5/25.10.2021. Access to industrial lines and/or freight terminal property of Unicom Holding and operated in whole / in part by other econominal agents RTO and which are connected to the CFR Dornesti infrastructure, by industrial transit line 13 CL property of SNTFM CFR Marfa SA and by diagonal 8-26 operated by Grup Feroviar Roman SA and diagonal 26-36 operated by CFR Marfa; Industrial railway LFI 2 CL (wide gauge) wide gauge rail: 118,47 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines Unicom Holding S.A. Compania Naţională de Căi Ferate “CFR” S.A. România Working point Dornesti, wide gauge – attached to the Operating License series AE nr. 336- R5/25.10.2021. Access to industrial lines and/or freight terminal property of Unicom Holding and operated in whole / in part by other econominal agents RTO and which are connected to the CFR Dornesti infrastructure, by industrial transit line 13 CL property of SNTFM CFR Marfa SA and by diagonal 8-26 operated by Grup Feroviar Roman SA and diagonal 26-36 operated by CFR Marfa; Industrial railway LFI 4 CL (wide gauge) wide gauge rail: 245,33 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines Unicom Holding S.A. Working point Dornesti, wide gauge – attached to the Operating License series AE no. 336- R5/25.10.2021. Access to industrial lines and/or freight terminal property of Unicom Holding and operated in whole / in part by other econominal agents RTO and which are connected to the CFR Dornesti infrastructure, by industrial transit line 13 CL property of SNTFM CFR Marfa SA and by diagonal 8-26 operated by Grup Feroviar Roman SA and diagonal 26-36 operated by CFR Marfa; Industrial railway LFI 2 CN (normal gauge) Normal gauge rail: 118,47 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines of Unicom Holding S.A. Dornesti working point, wide gauge – attached to the Operating License series AE nr. 336- R5/25.10.2021. Industrial railway LFI 3 CN (normal gauge) Normal gauge rail: 251,03 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines Unicom Holding S.A. Working point Dornesti, wide gauge – attached to the Operating License series AE nr. 336- R5/25.10.2021. Access to Dornesti Terminal/ working point is indirect, by means of transit rails, namely: - on wide gauge rail – access by wide gauge rail no. 13 CL, property of SNTFM CFR Marfa SA, respectively turnover no. 36, property Unicom Holding SA, on the diagonal 36-8, on the transit line between the turnover 26 and the turnover 8 managed by Grup Feroviar Roman SA, over the turnover 26 – property of SNTFM CFR Marfa, turnover 20 – TVM owned, turnover 14 – TVM owned and turnover 8 – property SNTFM CFR Infrastructura, by the turnovers station no. 2, the Y end of the CFR Dornesti station, with access to the wide gauge rails in the Dornesti station. - on normal gauge rail – access by transit normal rail no.30, property of CFR, respectively by the junction point turnover no. 24 (property SNTFM CFR Marfa SA). Access in Dornesti station ensured by normal gauge transit lines no. 14, CN (property SNTFM CFR Marfa SA) or 15CN and 16CN (property Compania Naţională de Căi Ferate “CFR” S.A. România TEF), by TDJ 46/48, over the diagonal 31-52 with access to the station lines by the turnovers post no.1, by the X end of the CFR Dornesti station. Planned changes No; Revisions planned as per legal provisions, accidental repairs when necessary 4. Charges 4.1 Information on charges Access charge on the industrial rails of Dornesti working point is maximum 6.09 lei/convoy/ passing. Tariff applies regardless of the number and type of rail vehicles composing the convoy or of and isolated locomotive. Prices for the freight handling and storage are defined equally for each client depending on the type of service, its duration and the necessary resources and are calculated in lei/ton or eur/ton Charges for the access and fuel supply are included in the contractual price between Unicom Holding and its clients / beneficiaries of the services in the freight terminal. We do not charge fees for services related to fuel supply. The fuel price is variable and is mutually agreed upon by the parties through buyer orders confirmed by the seller Unicom Holding SA; it is updated daily based on fuel price trends on the national and international markets, exchange rate fluctuations, or official changes made by domestic producers via official notices or websites. Furthermore, increases resulting from normative acts affecting sale price components (e.g., excise duty level, VAT, etc.) shall modify the sale price accordingly and be reflected in the fuel price level, becoming mandatory for the parties as of the effective date of said normative acts. For access to the industrial railway lines of the Dornesti work point, the LFI transit usage fee is also charged for upstream/OTF managers transiting the lines. The access fee for shunting convoys on the LFI on the Grup Feroviar Roman SA industrial line is 9.76 lei/convoy km, the shunting fee is 19.02 lei/shunting operation, the stationary tarif is 0.7 lei/wagon hour - the fees do not include VAT, fees that are re-invoiced to the railway transport operator. 4.2 Information on discounts there is no discount policy applied to tariffs for the access on industrial railways. 5. Access conditions 5.1 Legal conditions Based on a contract / access conventions negotiated with the clients, to specify the general terms and conditions to ensure access to the supply of service infrastructure with necessary conditions Compania Naţională de Căi Ferate “CFR” S.A. România 5.2 Technical conditions The technical requirements to be observed for the use of services infrastructures – type and maximum length of the rolling stock, gauge, maximum admitted tonnage –Dornesti railway : as per Operation License series AE no.336- R5/25.10.2021, Technical Requirements Annex A and Regulations on the performance of the railway shunting / transport activities on the industrial lines of Unicom Holding S.A., Dornesti Working Point, normal and wide gauge – attached; Normal gauge: maximum admitted tonnage per convoy 1200 tons, maximum admitted length per shunting convoy 225 m, maximum admitted speed 10 km/h, minimum breaked weight 7%, minimum breaked weight for keeping the train stationary 4%,maximum axle load 21.5 to; Wide gauge: maximum admitted tonnage per convoy 1000 tons, maximum admitted length of the shunting convoy 225 m, maximum admitted weight 10 km/h, minimum breaked weight 7%, minimum breaked weight for keeping the train stationary 4%, maximum axle load 24.5 to. 5.3 Self-supply of rail-related No services 5.4 IT systems No 6. SERVICE CAPACITY ALLOCATION 6.1 Request of access Contact data where the rail transport operators can send a request to access the service infrastructure: Dornesti working point: 20S Cucului St, Dornesti Suceava county an/or e-mail: ilie.chifan@un
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963