Charges for services provided by CFR

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:55
Dimensiunea materialului
515,4 KB

Conținutul disponibil în colecție

Textul documentului

CFR NETWORK STATEMENT - 2026 ANNEX 26.a CHARGES FOR SERVICES PROVIDED BY CFR Validity: 14.12.2025 – 12.12.2026 Version: 15.1.1 Update: 29.05.2026 Compania Naţională de Căi Ferate “CFR” S.A. România Content 1. Charge for the use of infrastructure (IAC) ............................................................................... 3 1.1 Value of basic tariff elements for IAC calculation ........................................................................... 3 1.2 Exemplification .................................................................................................................................... 4 1.3 Facilities granted by CFR ................................................................................................................... 4 2. Charges for services provided under service infrastructures ................................................ 5 2.1 Charge for the commercial stops of the passenger trains in the stations and movement halts ...................................................................................................................................................... 5 2.2 Charge for leasing spaces for ticketing offices ............................................................................... 5 2.3 Charge for the access of the shunting convoys to/from the CFR railway infrastructure ........... 5 2.4 Charge for shunting railway vehicles ............................................................................................... 5 2.5 Charge for the operative parking of the rolling stock ..................................................................... 6 2.6 Charge for the long-term parking of the rolling stock..................................................................... 6 2.7 Parking charge for wagon loading/unloading .................................................................................. 6 2.8 Charges for the transport of the CFR cranes and intervention trains for resuming traffic ........ 7 2.9 Charge for using intervention trains for resuming traffic ............................................................... 7 3. Charges for additional services supplied by CFR upon the request of the RU ..................... 9 3.1 Charge for the supply of traction current ......................................................................................... 9 3.2 Charge for exceptional transports .................................................................................................... 9 3.3 Charge for verifying the railway vehicles with exceptional transports ......................................... 9 4. Charges for ancillary services supplied by CFR ....................................................................10 4.1 Charges for additional information regarding the train scheduling and traffic ......................... 10 4.2 Charge (commission) for the ticketing service .............................................................................. 10 5. Other charges ...........................................................................................................................11 5.1 Basic charges for train path preparation ........................................................................................ 11 5.2 Charge for performing experiments with a view to increasing the tonnages to be hauled or modifying the hauling modality .................................................................................................. 11 5.3 Charge for interrupting the suspension of the movement activity .............................................. 11 CFR Network Statement - 2026 ANNEX 26.a Version: 15.1.1 Update: 29.05.2026 Pag: 2 / 11 Compania Naţională de Căi Ferate “CFR” S.A. România 1. CHARGE FOR THE USE OF INFRASTRUCTURE (IAC) (services in accordance with pct.1 of Annex II - Law no. 202/2016) 1.1 Value of basic tariff elements for IAC calculation The basic tariff elements for IAC calculation are determined at the value of the direct cost for the provision of the services from the minimum access package defined in point 2 of Annex II of Law 202/2016. Valid from 01.03.2024 Freight traffic IAC basic charging elements Basic charge Charging elements depending on Charge per train-km depending on tonnage train tonnage (lei/train-km) Category of traffic section A B C D Electrified sections (Ttse) 0,676 0,676 0,676 0,676 Non-electrified sections (Ttsn) 3,45 2,80 2,14 1,48 Minimum tonnage (Tmin) 60 60 60 60 Tonnage factor (Ft) 0.00020 0.00020 0.00020 0.00020 Charging elements depemding on Charge per train depending on distance distance covered (lei/train-km) Category of traffic section A B C D Traffic (Tc) 16,457 16,457 15,026 7,085 Passenger traffic IAC basic charging elements Basic charge Charging elements depending Charge per train-km depending on tonnage on train tonnage (LEI/train-km) Category of traffic section A B C D Electrified sections (Ttse) 0,676 0,676 0,676 0,676 Non-electrified sections (Ttsn) 3,45 2,80 2,14 1,48 Minimum tonnage (Tmin) 60 60 60 60 Tonnage factor (Ft) 0.00014 0.00014 0.00014 0.00014 Charging elements depending Charge per train-km depending on distance on distance covered (LEI/train-km) Category of traffic section A B C D Traffic (Tc) 9,562 9,562 9,108 4,085 CFR Network Statement - 2026 ANNEX 26.a Version: 15.1.1 Update: 29.05.2026 Pag: 3 / 11 Compania Naţională de Căi Ferate “CFR” S.A. România 1.2 Exemplification Examples of IAC values [lei/train-km] at the direct cost level for the services in the minimum package depending on the line category and the tonnage of the train, for one km: a) freight traffic LINE CATEGORY A B C D 60 500 1000 1500 2000 2500 3000 60 500 1000 1500 2000 2500 3000 60 500 1000 1500 2000 2500 3000 60 500 1000 1500 2000 2500 3000 Tonnage brute/tren IAC 19,91 20,21 20,56 20,90 21,25 21,59 21,94 19,26 19,50 19,78 20,06 20,34 20,62 20,90 18,60 18,79 19,00 19,21 19,43 19,64 19,86 8,57 8,70 8,84 8,99 9,14 9,29 9,44 Non-Electrified line IAC 20,58 20,89 21,23 21,58 21,92 22,27 22,61 19,93 20,18 20,46 20,74 21,02 21,30 21,58 19,27 19,46 19,658 19,89 20,10 20,32 20,53 9,24 9,37 9,52 9,67 9,82 9,96 10,11 Electrified line b) passenger traffic LINIE category A B C D 60 100 250 300 400 500 800 60 100 250 300 400 500 800 60 100 250 300 400 500 800 60 100 250 300 400 500 800 Tonnage brute/tren IAC Non-Electrified 13,01 13,03 13,10 13,13 13,18 13,22 13,37 12,36 12,38 12,44 12,46 12,50 12,53 12,65 11,25 11,26 11,30 11,32 11,35 11,38 11,47 5,57 5,57 5,60 5,61 5,64 5,66 5,72 line IAC 13,69 13,71 13,78 13,80 13,85 13,90 14,05 13,04 13,05 13,11 13,13 13,17 13,21 13,33 11,92 11,94 11,98 12,00 12,03 12,06 12,15 6,24 6,25 6,28 6,29 6,31 6,33 6,39 Electrified line 1.3 Facilities granted by CFR • CFR grants to the RUs the following IAC facilities: 0 Access Contract, as follows: - by 33% for the block trains in intermodal traffic; The agreement is concluded under the conditions mentioned in paragraph 5.6.5 of the DRR. • CFR has established a 50% reduction in TUI on sections where there was no passenger or freight traffic (in the first quarter of 2025). The reduction is applied within a pilot project starting from 01.07.2025 until 13 December 2025 (date of the change of train schedule 2025/2026). The conditions of application are presented in art.5.6.5, letter b) of the DRR text. If the economic results are positive, the parties can agree to extend the validity of the agreement or conclude a new agreement only if there is an access contract concluded between the parties on the railway infrastructure. The agreement regarding granting the facility to reduce TUI by 33% for complete trains in intermodal traffic is terminated if OTF registers debts (receivables) with CFR, older than 35 days resulting from the application of specific agreements and from the performance of the access contract in concluded between CFR and OTF. Also, the specific agreement is automatically terminated in the event that non-conformities are found regarding the OTF's self-responsible declaration regarding the inclusion of trains in the conditions of application of the agreement. CFR Network Statement - 2026 ANNEX 26.a Version: 15.1.1 Update: 29.05.2026 Pag: 4 / 11 Compania Naţională de Căi Ferate “CFR” S.A. România 2. CHARGES FOR SERVICES PROVIDED UNDER SERVICE INFRASTRUCTURES (services in accordace with item 2 of Annex II - Law no. 202/2016) 2.1 Charge for the commercial stops of the passenger trains in the stations and movement halts (services in accordance with item 2, let. (a) of Annex II - Law no. 202/2016) T = 2,45 LEI / stopping (valabil from 01.04.2025) The charges for the commercial stops of trains in stations and movement stops includes the costs regarding: a) electricity, b) display panels, c) the sound 2.2 Charge for leasing spaces for ticketing offices (services in accordance with item 2, let. (a) of Annex II - Law no. 202/2016) The charges for renting spaces for ticket offices/information offices/ticket machines are indexed with the inflation index for the period January - December, and their value are: a) ticketing offices, Ca = 28,91 LEI/sqm/month b) information services - information offices, Ca = 28,91 LEI/sqm/month c) automated ticketing services, Ca = 165,25 LEI/sqm/month NOTE: For railway transport operators (OTF), when renting the sites for ticketing services, information services (information offices) and ticketing services through automatic machines, the rates related to them will be indexed at the beginning of each year with the index of inflation related to the period January-December of the previous year, regardless of the date on which the rental contract was concluded, this becoming a clause in all contracts that will be concluded with the object of renting with the destinations mentioned above. 2.3 Charge for the access of the shunting convoys to/from the CFR railway infrastructure (services in accordance with item 2, let. (c) of Annex II - Law nr. 202/2016) C = RON 11,13/convoy/km. (valid from 01.04.2025); The charge shall be levied for the distance between the line from where the convoy is sent to the connecting switch (branch) on the CFR railway infrastructure, regardless of the number of vehicles in the convoy. Vehicles shall mean wagons and/or motor rolling stock. 2.4 Charge for shunting railway vehicles (services in accordance with item 2, let. (c) of Annex II - Law nr. 202/2016) CFR Network Statement - 2026 ANNEX 26.a Version: 15.1.1 Update: 29.05.2026 Pag: 5 / 11 Compania Naţională de Căi Ferate “CFR” S.A. România C = RON 24,32/shunting operation (valid from 01.04.2025); Shunting operation shall mean the totality of the manoeuvres performed by a RU for a specific purpose (e.g.: the manoeuvre of introducing/taking out a locomotive in/from the train, the manoeuvre of taking out a defect wagon from the train, the maneouvre of attaching a group of wagons, etc.), regardless of the number of the vehicles in the manoeuvre convoys within the shunting operation. Vehicle shall mean wagons and/or traction rolling stock. 2.5 Charge for the operative parking of the rolling stock (services in accordance with item 2, let. (d) of Annex II - Law nr. 202/2016) It shall comprise: - the wagon parking charge C = RON 0,83/wagon-hour (valid from 01.04.2025). – the motor rolling stock parking charge C = RON 1,38/motor rolling stock-hour (valid from 01.04.2025). The tariff shall apply after the expiry of a period of free parking of 6 hours. Wagon shall mean physical wagon, regardless of the number of axles. Rolling stock shall mean motor rolling stock (locomotives, railcars, multiple units, etc.) 2.6 Charge for the long-term parking of the rolling stock (services in accordance with item 2, let. (d) of Annex II - Law nr. 202/2016) C = RON 2,55/wagon-day (valid from 01.04.2025). The charge shall be levied for the wagons parked for more than 30 days based on the consent of CFR SA, after the analysis of the RU’s request. The long-term rolling stock parking service is not provided by CFR in port stations (maritime, river) and border stations. The tariff is applied for the number of days of parking, calculated from the start date of parking of the wagons registered in the approval, until the date of their dispatch from the station. Wagon shall mean physical wagon, regardless of the number of axles. 2.7 Parking charge for wagon loading/unloading (services in accordance with item 2, let. (d) of Annex II - Law nr. 202/2016) C = RON 0,83/wagon-hour (valid from 01.04.2025). The charge shall be levied for the parking on the loading/unloading lines or on the public loading/unloading lines, after the expiry of a period of free parking of 24 hours. The loading/unloading lines are lines intended for that purpose and are, in principle, equipped with ramps and/or sheds. CFR Network Statement - 2026 ANNEX 26.a Version: 15.1.1 Update: 29.05.2026 Pag: 6 / 11 Compania Naţională de Căi Ferate “CFR” S.A. România The public lines are made available to the beneficiaries for loading/unloading operations and are mandatory equipped with ramps. Wagon shall mean physical wagon, regardless of the number of axles. 2.8 Charges for the transport of the CFR cranes and intervention trains for resuming traffic (services in accordance with item 2, let. (h) of Annex II - Law nr. 202/2016) CHARGE VALUE (RON/km): Valabil pana la Valabil de la 31.07.2026 01.08.2026 For crane vehicles 5,60 5,90 For railway cranes Type EDK of 20 tf 6,70 7,06 For railway cranes Type EDK of 60 tf 17,85 18,80 For railway cranes Type EDK of 80 tf 22,31 23,49 For intervention trains with crane and for specialized intervention trains 39,04 41,10 Note: 1. This charge shall refer only to the transport of cranes and intervention trains and shall not include the charge for the hauling services to/from the intervention place and the shunting services at the intervention pl

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

70999948879a3aafe797bae84cd44c2403e4a9b547f3c8cf3f6b73514b165018