Speed restriction of 30 km/h over a 106-meter stretch (from km 162+216 to km 162+322) for 11 months. Total 119 100 Caracal Grozavești 488 01.04.2027 31.07.2028 B closure of one track for 6 months, followed by the other track for 5 months. Total closure of both tracks for 2 days (6-hour windows) for the temporary bridge. Speed restriction of 30 km/h over a 106-meter stretch (from km 63+055 to km 63+161). Total closure for 6 120 100 Ciolpani Gălăteni 488 01.04.2027 31.07.2028 B months on one traffic lane and 5 months on the other (11 months total). Total closure for 2 days (6 hours) for the temporary bridge. Speed restriction of 30 km/h over a 104-meter stretch (from km 64+048 to km 64+152) for 6 months. Full closure 121 100 Ciolpani Gălăteni 183 01.04.2027 30.09.2027 B of one traffic lane for 3 months, followed by the other lane for 3 months. Full closure of both lanes for 6 hours over 2 days for the temporary bridge. Draganesti 122 100 Farcasele 1301 08.12.2022 30.06.2026 B RV of 50 Km/h Line II km 137+760 - 140+760, L100 Olt Speed restriction of 30 km/h over a 122-meter stretch from km 67+421 to km 67+543 (11 months). Full closure 123 100 Gălăteni Olteni 488 01.04.2027 31.07.2028 B of one track for 6 months, followed by the other track for 5 months. Full closure of both tracks for 5 days (6 hours) for a temporary bridge. 124 100 Mihaiesti Radomiresti 1301 08.12.2022 30.06.2026 B RV of 50 Km/h Line I km 124+650 - 126+528 125 100 Radoiesti Atarnati 1301 08.12.2022 30.06.2026 B RV of 50 km/h wire II between km 90+500 - km 94+000 126 100 Radomiresti Farcasele 1301 08.12.2022 30.06.2026 B RV of 50 Km/h Wire I km 146+830 - 148+792 Speed restriction of 30 km/h over a 102-meter stretch from km 131+654 to km 131+756 (8 months). Full closure 127 100 Radomirești Draganești Olt 244 01.04.2027 30.11.2027 B of one traffic lane for 6 months, followed by the other lane for 5 months. Full closure of both lanes for 2 days (6 hours) for a temporary bridge. Rosiori 128 100 Maldaieni 1301 08.12.2022 30.06.2026 B RV of 50 Km/h Line II km 101+330 -106+000 Nord 129 100 Buc.Nord Buc.N.Post 5 44 16.04.2026 30.05.2026 B Track I closed; traffic on Track II at Vred = 50 km/h. 130 100 București N Roșiori N 1080 10.09.2031 25.08.2034 B 131 100 Chiajna Gradinari 163 01.11.2025 13.04.2026 B Track I closed; traffic on Track II at Vred = 50 km/h. 132 100 Grădinari Vadu Lat 165 17.09.2025 01.03.2026 B Track I closed; traffic on Track II at Vred = 50 km/h. Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 10 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România 133 100 Grădinari Vadu Lat 120 02.03.2026 30.06.2026 B Track II closed; traffic on Track I at Vred = 50 km/h. Banu Two weeks of full closure; traffic on the open track is 134 100 Malu Mare 106 15.01.2026 30.04.2026 B Mărăcine restricted to a speed of 10 km/h. Banu 20-day partial closure; traffic on the open track is subject 135 100 Malu Mare 137 15.01.2026 31.05.2026 B Mărăcine to a speed restriction of 10 km/h. Speed restriction of 30 km/h over a 50-meter section from km 130+390 to km 130+440 (105 days). 136 101 Costești Fâlfani 106 15.07.2028 28.10.2028 B Track works are being carried out during traffic breaks, involving daily line closures. Speed restriction of 30 km/h over a 50-meter section from km 240+745 to km 240+795 (105 days). Track works 137 101 Pielești PL. Vulcănești 106 17.03.2028 30.06.2028 B are being carried out during traffic breaks, involving daily line closures. 138 101 Fusea Mătăsaru 230 10.10.2026 28.05.2027 B Track I closed; traffic on Track II at Vred = 50 km/h. 139 101 Fusea Mătăsaru 241 01.06.2027 28.01.2028 B Track I closed; traffic on Track II at Vred = 50 km/h. 140 101 Leordeni Călinești 222 15.12.2026 25.07.2027 B Track I closed; traffic on Track II at Vred = 50 km/h. 141 101 Leordeni Călinești 239 30.07.2027 25.03.2028 B Track II closed; traffic on Track I at Vred = 50 km/h. 142 101 Pătroaia Leordeni 186 10.02.2027 15.08.2027 B Track I closed; traffic on Track II at Vred = 50 km/h. 143 101 Pătroaia Leordeni 193 16.08.2027 25.02.2028 B Track II closed; traffic on Track I at Vred = 50 km/h. 144 101 Pitești Bradu de Sus 441 15.01.2026 31.03.2027 B 9-month partial closure. Speed limit = 30 km/h. Two-week partial closure – traffic interruptions of at least 145 101 Slătioara Piatra Olt 396 01.12.2025 31.12.2026 B 6 hours. Speed restriction of 30 km/h over a 30-meter stretch (in the TN zone, km 203+200) for 4½ months. Ramificație 146 102 Bradu de Sus 441 15.01.2026 31.03.2027 B 9-month partial closure. Speed limit: 30 km/h. Golești Giurgiu Giurgiu N 147 902R 781 06.01.2028 24.02.2030 B Nord Frontieră Speed restriction of 30 km/h over a 50-meter section Automobile from km 0+825 to km 0+875 (14 days). 148 108 Ciumești 106 17.03.2028 30.06.2028 B Dacia Track works are being carried out during traffic breaks, involving daily line closures. Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 11 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România Estimated 4-month partial closure – traffic stoppages of at 149 108 Ciumești Stâlpeni 320 15.02.2026 31.12.2026 B least 6 hours. Speed restriction of 30 km/h between km 127+687 and km 127+737 for a period of 4 months. Estimated 4-month partial closure – traffic stoppages of at Schitu 150 108 Câmpulung 320 15.02.2026 31.12.2026 B least 6 hours. Speed restriction of 30 km/h between km Golești 135+108 and km 135+158 for a period of 4 months. Estimated 4-month partial closure – traffic stoppages of at 151 108 Stâlpeni Lăzărești 320 15.02.2026 31.12.2026 B least 6 hours. Speed restriction of 30 km/h between km 135+108 and km 135+158 for a period of 4 months. estimare-4 luni închidere parțială - pauze de circulație de 152 108 Stâlpeni Lăzărești 320 15.02.2026 31.12.2026 B minim 6 ore. RV 30km/h între km.135+108 și km.135+158, timp de 4 luni. Estimated 4-month partial closure – traffic interruptions of at least 6 hours. Speed restriction of 30 km/h between 153 109 Bascov Vâlcele 320 15.02.2026 31.12.2026 B km 127+959 and km 128+009 for a period of 4 months and 7 days. Speed restriction of 30 km/h over a 50-meter section from km 158+213 to km 158+263 (105 days). Track works 154 110 Miroși Balaci 106 17.03.2028 30.06.2028 B are being carried out during traffic intervals, involving daily track closures. . Speed restriction of 30 km/h over a 50-meter section from km 193+535 to km 193+585 (105 days). Track works Roșiori 155 110 A Roșiori Est 106 17.03.2027 30.06.2027 B are being carried out during traffic breaks involving daily Nord line closures. TOTAL CLOSURE for 1 day, with passenger transfer. 30 km/h speed restriction over a 50-meter section from km 231+903 to km 231+953 (105 days). Track works are 156 112 Romula Caracal 106 17.03.2027 30.06.2027 B being carried out during traffic breaks involving daily line closures. TOTAL CLOSURE for 1 day, with passenger transfer. 1 day of total closure. Speed restriction of 30 km/h over a 157 112 Romula Vlăduleni 258 01.01.2026 15.09.2026 B 100-meter stretch for 35 days. . Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 12 / 42 Compania Naţională de Căi Ferate “CFR” S.A. România 20-day partial closure. Speed restriction of 30 km/h over a 158 112 Romula Vlăduleni 365 01.01.2026 31.12.2026 B 100-meter stretch for 35 days. Estimated 4-month partial closure – traffic interruptions 159 112 A Frăsinet Corabia 320 15.02.2026 31.12.2026 B of at least 6 hours; speed restriction of 30 km/h between
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

4f238e0e84f61f204528e4de16053251e7c7de6325e57d1564978e6d2abeb3ad