to Păuliş Lunca Technical Group.
3 open traffic lines (Corridor IV
works, simple line Simeria - Aurel
Vlaicu) used for crossing/advancing
passenger and freight trains on the
17 Mintia Temporary decomposition freight train Simeria-Glogovăţ section
(saturated). In the Mintia station,
the coal shuttles for the Mintia
Thermal Power Plant are composed
/decomposed.
4 open traffic lines (works Corridor
IV, simple line Simeria - Aurel
Vlaicu). At the reopening of line 227,
Temporary decomposition freight train, in Deva station, the composition
18 Deva operations / Freight train
Attachments, Detachments,
breakdown will be performed with
the destination Păuliş Lunca Grupa
Tehnică (which is currently being
performed in HM Brănişca).
3 open traffic lines (works Corridor
Temporary decomposition freight train, IV, simple line Simeria - Aurel
19 Simeria Vlaicu), passenger train training
Attachments, Detachments, Towing Exchange
station
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 28 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
3 open traffic lines (works Corridor
IV, simple line Simeria - Aurel Vlaicu)
20 Orăştie Temporary decomposition freight train used for crossing / advancing
passenger and freight trains on the
section Șibot - Glogovăţ (saturated).
Temporary decomposition freight train, 2 open traffic lines (Corridor IV
21 H. m. Aurel Vlaicu works).
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
22 H. m. Băcia 2 open (direct) traffic lines.
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train, 2 open (direct) traffic lines and
24 H. m. Călan without switches.
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
25 H. m. Bretea Strei 2 open (direct) traffic lines.
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
27 H. m. Băieşti 2 open (direct) traffic lines
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
29 Baru Mare 2 open (direct) traffic lines
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
30 H. m. Crivadia 2 open (direct) traffic lines
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train,
31 H. m. Merişor 2 open (direct) traffic lines
Attachments, Detachments, Towing Exchange
Temporary decomposition freight train, The derailed line is used for pushing
32 Băniţa locomotive attachments/
Attachments, Detachments detachments (slope top station).
Temporary decomposition freight train, 2 lines in the station, passenger
33 Cliciova trains are used for crossings /
Attachments, Detachments advances
Temporary decomposition freight train, 2 lines in the station, used for
34 Mănăștur crossings / advancements of
Attachments, Detachments passenger trains
Temporary decomposition freight train, 2 lines in the station, used for
35 Făget crossings / advancements of
Attachments, Detachments passenger trains
Temporary decomposition freight train, 2 lines in the station, used for
36 Margina crossings / advancements of
Attachments, Detachments passenger trains
Temporary decomposition freight train, 2 lines in the station, used for
37 Holdea crossings / advancements of
Attachments, Detachments passenger trains
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 29 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
Temporary decomposition freight train, 2 lines in the station, used for
38 Dobra crossings / advancements of
Attachments, Detachments passenger trains
2 lines in the station, used for trains
39 Pestiş Temporary decomposition freight train
with access on LFI Arcelor Mittal
Only 2 open traffic lines, train
40 Valea Cernei Decomposition freight train
crossings
Only 2 open traffic lines, train
41 Topleţ Decomposition freight train
crossings
Only 2 open traffic lines, train
42 Băile Herculane Decomposition freight train
crossings
43 H. m. Mehadia Noua Decomposition freight train Only 1 open traffic line
44 H. m. Mehadia Veche Decomposition freight train Only 1 open traffic line
Only 2 open traffic lines, train
46 H. m. Poarta Decomposition freight train
crossings
Only 2 open traffic lines, train
47 H. m. Teregova Decomposition freight train
crossings
Only 2 open traffic lines, train
48 Armeniş Decomposition freight train
crossings
Only 3 open traffic lines, train
49 H. m. Vălişoara Decomposition freight train crossings, push locomotive
detachment attachment
Only 2 open traffic lines, train
50 H. m. Valea Timişului Decomposition freight train
crossings
Only 2 open traffic lines, train
51 H. m. Zăgujeni Decomposition freight train
crossings
Only 2 open traffic lines, train
52 H. m. Jena Decomposition freight train
crossings
Only 2 open traffic lines, train
53 H. m. Tapia Decomposition freight train
crossings
Only 2 open traffic lines, train
54 H. m. Cornuţel Banat Decomposition freight train
crossings
Only 2 open traffic lines, train
55 H. m. Deta Decomposition freight train
crossings
Only 2 open traffic lines, train
56 H. m. Semenic Decomposition freight train
crossings
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 30 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
Only 2 open traffic lines, a line used
57 Timişoara Vest Decomposition freight train
for crude LFI Butane Gas
înapoi la CUPRINS
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 31 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
4. REGIONAL BRANCH CFR CLUJ
Crt.
Station / Motion stop Restricțion Observațion
no.
1 Câmpia Turzii No restriction Max 645 meters
Temporary decomposition freight train,
2 Boju couples, SMR Slope peak station
Temporary decomposition freight train, Station located between 2 tunnels,
3 Tunel couples, SMR Tunnel station configuration does not
allow
4 Apahida No restriction Max 650 meters
Line 6 maneuvering passenger liners
Temporary decomposition freight train, and locomotives and passing freight
5 Cluj Napoca couples, SMR trains, Line 7 motor vehicle parking and
passenger linings, Lines 8 and 9 closed,
Line 10 crane train
Temporary decomposition freight train, Mera station configuration does not
6 Mera couples, SMR allow
Temporary decomposition freight train Affects attachment and detachment of
7 Aghireş
couples
Temporary decomposition freight train,
8 Stana couples, SMR Only 2 open traffic lines
Temporary decomposition freight train,
9 Brăişoru couples, SMR Only 2 open traffic lines
Temporary decomposition freight train, Affects the composition and
10 Poieni couples, SMR decomposition in / of loco of trains,
max 578 meters
Temporary decomposition freight train, The configuration of the Ciucea station
11 Ciucea couples, SMR does not allow, max 635 meters
Temporary decomposition freight train,
12 Bulz couples, SMR Only 2 traffic lines
Temporary decomposition freight train,
13 Bratca couples, SMR Only 2 traffic lines
Temporary decomposition freight train,
14 Şuncuiuş couples, SMR Only 2 traffic lines
Network Statement 2026 ANNEX 19 Version: 15.1.0 Update: 09.09.2026 Pag: 32 / 42
Compania Naţională de Căi Ferate “CFR” S.A. România
Temporary decomposition freight train,
15 Vadu Crişului couples, SMR Only 2 traffic lines
Temporary decomposition freight train, Three direct
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
4f238e0e84f61f204528e4de16053251e7c7de6325e57d1564978e6d2abeb3ad