Conținutul disponibil în colecție
Textul documentului
Yes No
operation alternative routes
Craiova
Craiova
Replacement by buses
Total
– modernization 2024-2028 + traffic re-routed to Yes Yes
closure
alternative routes
Caransebeș
Electrification Replacement by buses
Total
Craiova -Calafat and 2026-2029 + traffic re-routed to Yes No
closure
modernization alternative routes
Apahida - Single track Traffic re-routed to
modernization 2026-2030 Yes No
Coșlariu operation alternative routes
7 days Traffic re-routed to
Videle Giurgiu electrification 2027-2030 alternative routes+ Yes No
alternative replacement by buses
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 10 /
22
Compania Naţională de Căi Ferate “CFR” S.A. România
Electrification
Total
Jilava-Giurgiu and 2025-2028 Replacement by buses Yes Yes
closure
modernization
CFR and MAV agreed that the railway infrastructure maintenance works to be performed on the MAV
network, and on the Arad - Curtici Section (involving the Curtici - Lokoshaza Border) should be carried out
at night.
3. TRAFFIC PLANNING PRINCIPLES AND TRAFFIC FLOWS
3.1 Traffic Planning Principles
Within the allocation process, CFR prepares the train paths in compliance with the following priority criteria:
a) international passenger public transport services;
b) passenger public transport services dedicated to the travel of the commuters, declared as such by
the applicants;
c) long-distance passenger public transport services;
d) short-distance passenger public transport services;
e) international freight railway transport services on the European corridors as defined in Regulation
(EU) No. 913/2010, as further amended and supplemented.
f) international freight railway transport services, others than those on the European corridors;
g) freight railway transport services for the multimodal transport;
h) any other types of railway transport services.
Basic categories for passenger trains:
- international trains
- interregio trains
- regio trains
Basic categories for freight trains:
- international trains
- direct trains
- local trains
Common technical parameters on routes:
MINIMUM
TRAIN
ROUTE WAGGON WEIGHT SPEED BRAKED MASS OTHER
LENGTH
PERCENTAGE
Curtici - Simeria; Simeria
750 3 000 80 50
- Curtici
Videle - Chitila; Chitila
700 3 000 80 50
- Videle
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 11 /
22
Compania Naţională de Căi Ferate “CFR” S.A. România
MINIMUM
TRAIN
ROUTE WAGGON WEIGHT SPEED BRAKED MASS OTHER
LENGTH
PERCENTAGE
Pushing
locomotive: Videle
Videle - Giurgiu Nord 680 3 000 50 50 - Stanesti in
single traction
2 000 tons
Pushing
locomotive:
Giurgiu Nord -
Giurgiu Nord - Videle 680 2000 50 50 Stănesti in single
traction
1 000 tons
Giurgiu Nord - Ruse; Ruse
600 2000 60 50
- Giurgiu Nord
Pushing
locomotive: Pui -
Simeria - Craiova - Videle 620 1500 60 50
Banita in single
traction 1 000 tons
Pushing
locomotive: Targu
Videle - Craiova - Simeria 620 2000 60 50 Jiu -Banita in single
traction
1 400 tons
Pushing
locomotive: Fetesti
Chitila - Constanta 700 3000 80 50 - Saligny in single
traction
2 200 tons
Pushing
locomotive: Saligny
Constanta - Chitila 700 2900 80 50 – Fetesti in single
traction
2 200 tons
Double traction:
Podari - Sălcuţa
Craiova - Golenti 600 1960 60 50 in single traction
1 200 tons
Pushing
locomotive in
Golenti - Craiova 600 1850 60 50 single traction
1 110 tons
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 12 /
22
Compania Naţională de Căi Ferate “CFR” S.A. România
MINIMUM
TRAIN
ROUTE WAGGON WEIGHT SPEED BRAKED MASS OTHER
LENGTH
PERCENTAGE
Golenti - Vidin; Vidin
570 1800 60 50 Double traction
- Golenti
Lőkösháza - Curtici,
750 2500 80 50
Curtici - Lőkösháza
Diesel: Barbosi -
Chitila - Malina 650 2200 80 50
Malina
Diesel: Barbosi -
Malina - Chitila 650 2900 80 50
Malina
Pushing
locomotive:
Mehadia N. -
Poarta in single
traction 1 000
Craiova - Timisoara - Curtici 717 2000 80 55 tons; Pushing
locomotive:
Prunișor - Balota,
in single traction
1 300 tons
Pushing
locomotive:
Curtici - Timisoara - Craiova 717 2000 80 50 Vălișoara - Poarta
in single traction
1 000 tons
Biharkeresztes - Episcopia;
700 2500 60 50
Episcopia - Biharkeresztes
Episcopia Bihor - Oradea Vest
650 2200 70 50
- Simeria
Episcopia - Cluj
Napoca: Pushing
locomotive:
Aghireș - Huedin in
single traction 1
060 tons;
Episcopia Bihor - Cluj Napoca
670 2000 70 50
Est For Episcopia-Cluj
Napoca: double
traction: Aleșd -
Aghireș in single
traction
1 500 tons
Cojocna – Campia
Cluj Napoca Est - Simeria Triaj 650 3000 70 50 Turzii: 1 600 tons;
Pushing
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 13 /
22
Compania Naţională de Căi Ferate “CFR” S.A. România
MINIMUM
TRAIN
ROUTE WAGGON WEIGHT SPEED BRAKED MASS OTHER
LENGTH
PERCENTAGE
locomotive:
Câmpia Turzii -
Călărași Turda,
single traction
1 600 tons;
return: Câmpia
Turzii - Cojocna:
1 600 tons; Pushing
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
1719f714196d39af4cd1c2d51e50a40cbc9ac481f3f893bc5e072d7f34db09c5