CFR NETWORK STATEMENT - 2026
ANNEX 4.a CFR CAPACITY STRATEGY FOR TIMETABLE 2025/2026
Validity: 14.12.2025 – 12.12.2026
Version: 15.0.0
Update: 06.02.2025
Compania Naţională de Căi Ferate “CFR” S.A. România
Cuprins
0. Introducere ................................................................................................................................. 4
0.1 Contacte .................................................................................................................................................................. 4
0.2 Geographical Scope ............................................................................................................................................. 5
0.3 List of involved IMs ............................................................................................................................................... 5
0.4 List of service facilities ......................................................................................................................................... 6
1. Expected Capacity of Infrastructure in TT 2028 .......................................................................... 7
1.1 Additional Available Capacity ............................................................................................................ 7
1.2 Reduced Available Capacity .............................................................................................................. 8
2. Temporary Capacity Restriction ............................................................................................... 8
2.1 Principles for TCR Planning ........................................................................................................................................ 8
2.1.1 Clustering of TCRs to minimize the gravity of impact and work duration .................................................. 8
2.1.2 Connected areas where TCRs shall not be planned simultaneously ............................................................... 8
The Episcopia Bihor – Biharkeresztes Border shall not be closed simultaneously with the
Curtici – Lokoshaza Border. .............................................................................................................. 8
The Valea lui Mihai – Niyrabrany Border shall not be closed simultaneously with the
Episcopia Bihor – Biharkeresztes Border. ....................................................................................... 8
2.1.3 Planned work performance periods........................................................................................................................ 8
2.1.4 Usual capacity restriction performance periods .................................................................................................. 9
2.1.5 TCR allocation process – how the consultation and coordination processes will be ensured ................... 9
The coordination of the Temporary Capacity Restrictions with the neighbouring
infrastructure managers:.................................................................................................................... 9
- at least 18 months before the implementation of the timetable - for major capacity
restrictions; ......................................................................................................................................... 9
- at least 13.5 months before the implementation of the timetable - for important capacity
restrictions. .......................................................................................................................................... 9
The consultation of the Railway Undertakings shall be performed as follows:..................................... 9
- at least 13.5 months before the implementation of the timetable - for major capacity
restrictions; ......................................................................................................................................... 9
2.1.6 Process of settling the disagreements between the involved stakeholders ................................................... 9
2.2 Pre-Announcement of Major Impact TCRs ............................................................................................................ 10
3. Traffic Planning Principles and Traffic Flows .........................................................................11
3.1 Traffic Planning Principles ............................................................................................................... 11
- international trains ............................................................................................................................ 11
- interregio trains ................................................................................................................................. 11
- regio trains ......................................................................................................................................... 11
Basic categories for freight trains: ........................................................................................................... 11
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 2 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
- international trains ............................................................................................................................ 11
- direct trains ........................................................................................................................................ 11
- local trains ......................................................................................................................................... 11
3.2 Traffic Flows ...................................................................................................................................... 14
4. Validation ..................................................................................................................................21
Annex 2 - Outlook ....................................................................................................................................... 21
NOTĂ: ........................................................................................................................................................... 22
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 3 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
0. INTRODUCERE
TTR (Timetable Redesign) is the project to simplify, unify and solidify the improvements to the European rail
timetabling system to significantly increase the competitiveness of railways.
One of the components of TTR is the Capacity Strategy of each infrastructure manager, which it must publish 3
years before the change of the relevant timetable (X-36). The overall purpose of the Capacity Strategy is to
provide guidance on the key values of capacity planning, namely on the changes in infrastructure availability,
Temporary Capacity Restrictions (TCRs or “negative capacity”), as well as on the commercial capacity (“positive
capacity”) for a certain (reference) timetable.
The Capacity Strategy is the primary TTR planning tool, on the basis of which the Capacity Model and the Capacity
Supply will be developed.
Figure 1: Stages of the TTR Process (Source: RNE)
0.1 Contacte
Person in charge of TTR: Horațiu Ionescu – Deputy Traffic Director, Email: [email protected] , Phone:
+40213142577
Person in charge of Capacity Strategy: Monica Pavel, Email: [email protected], Phone: +40213142577
Relevant border points
Romania Ungaria
CFR MAV
1 Curtici Lõkösháza
2 Episcopia Bihor Biharkeresztes
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 4 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
Romania Bulgaria
CFR NRIC
1 Giurgiu Nord Russe
2 Golenți (Calafat) Vidin
0.2 Geographical Scope
CFR included in the Capacity Strategy TT 2026/2027 only the traffic sections related to the Freight Corridors as
established in European Regulation (EU) 913/2010 of the European Parliament and of the Council concerning a
European rail network for competitive freight, respectively:
- Rhine-Danube Rail Freight Corridor (RFC 9), main route and alternative routes.
Figure 2: The sections included in the Capacity Strategy TT 2028 are shown in yellow
0.3 List of involved IMs
Involved Infrastructure Manager(s)
• MAV – Hungary
• VPE – Hungarian capacity allocation body
• NRIC - Bulgaria
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 5 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
0.4 List of service facilities
The information regarding the limiting parameters of the sections and train paths can be found at:
https://rne.eu/it/rne-applications/cip/
At the same time, the information regarding the multimodal terminals is also available there.
Similar information can be found in the Network Statement:
https://cfr.ro/files/ddr/EN%202024/Annex%2034.a%20.pdf
https://cfr.ro/files/ddr/EN%202024/Annex%2034.b.pdf
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 6 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
1. EXPECTED CAPACITY OF INFRASTRUCTURE IN TT 2028
Figure 3: The sections on which the rehabilitation works are to be completed up to Timetable 2028 are shown in red
1.1 Additional Available Capacity
List of completed projects:
Quantification
of the effects Approved Financed
Segment Description Effect
(additional project project
capacity)*
Lugoj – Line doubling,
Line
Timișoara - increase of 210 train paths Yes Yes
modernization
Arad speed
Simeria - Line Increase of
234 train paths Yes Yes
Curtici modernization speed
Sighișoara – Line Increase of
252 train paths Yes Yes
Brașov modernization speed
Cluj- Oradea- Line Increase of
20 train paths Yes Yes
Episcopia Bihor modernization speed
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 7 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
Chiajna-Videle- Line Increase of
206 train path
Craiova modernization speed
* the additional capacity is given as a number of train paths for freight trains, with standard parameters
1.2 Reduced Available Capacity
Not applicable.
2. TEMPORARY CAPACITY RESTRICTION
2.1 Principles for TCR Planning
CFR adapts its infrastructure work planning process in accordance with the provisions of Annex VII to Law No.
202/2016 on integrating the Romanian railway system into the single European railway area, as further amended
and supplemented (the law transposing Directive 2012/34 establishing a single European railway area - recast).
Figure 4: Categories of Temporary Capacity Restrictions in accordance with Annex VII to Directive 2012/34 - TCR (source: RNE):
2.1.1 Clustering of TCRs to minimize the gravity of impact and work duration
During the bilateral conferences (MAV/VPE – CFR and NRIC – CFR) it was mutually agreed that the common
borders would not be closed simultaneously.
2.1.2 Connected areas where TCRs shall not be planned simultaneously
The Episcopia Bihor – Biharkeresztes Border shall not be closed simultaneously with the Curtici – Lokoshaza
Border.
The Valea lui Mihai – Niyrabrany Border shall not be closed simultaneously with the Episcopia Bihor –
Biharkeresztes Border.
Giurgiu Nord - Russe shall not be closed simultaneously with the Negru Vodă - Kardam and Golenţi – Vidin
borders.
2.1.3 Planned work performance periods
On the Arad - Curtici Section, the maintenance works shall be performed in a 5-hour closure window, during
the time interval 11 p.m. – 5 a.m.
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 8 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
2.1.4 Usual capacity restriction performance periods
As regards the rest of the network, the works shall be performed in a 5-hour closure window on the double-
track line, during the time interval 8 a.m. – 4 p.m., and in a 3-hour closure window on the single-track line,
during the same time interval.
2.1.5 TCR allocation process – how the consultation and coordination processes will be ensured
The coordination of the Temporary Capacity Restrictions with the neighbouring infrastructure managers:
- at least 18 months before the implementation of the timetable - for major capacity restrictions;
- at least 13.5 months before the implementation of the timetable - for important capacity restrictions.
The consultation of the Railway Undertakings shall be performed as follows:
- at least 13.5 months before the implementation of the timetable - for major capacity restrictions;
at least 12 months before the implementation of the timetable - for important capacity restrictions.
2.1.6 Process of settling the disagreements between the involved stakeholders
The disagreement coordination and settlement procedure can be found at:
https://cfr.ro/files/ddr/EN%202024/Annex%2020.a.pdf
https://cfr.ro/files/ddr/EN%202024/Annex%2020.b.pdf
CFR Network Statement - 2026 ANNEX 4.a Version: 15.0.0 Update:06.02.2025 Pag: 9 / 22
Compania Naţională de Căi Ferate “CFR” S.A. România
2.2 Pre-Announcement of Major Impact TCRs
Figure 5: The sections on which there are to be performed in 2027 major impact rehabilitation works involving major impact capacity
restrictions are shown in blue
Project
Time of Impact to passenger & approved by Financing
Segment Purpose Line impact
execution freight trains the CFR secured
management
Bucharest
Single track Traffic re-routed to
– modernization 2026-2030
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
1719f714196d39af4cd1c2d51e50a40cbc9ac481f3f893bc5e072d7f34db09c5