CFR for presentation in Annex 7.b of the DRR.
Connecting Railway Networks
The CFR Network has connections to all 5 neighbouring countries, as set out in the chart in Annex 2.a, and
in the table with the technical characteristics of the border stations and the relevant terminals in Annex 6.
2.3 Network Description
The characteristics of the network are summarised in Annex 5.
The detailed description of the technical characteristics of the CFR network is set out in the Railway
Infrastructure Register, RINF, prepared in accordance with the provisions of Article 47 of Decision No.
108/2020 on railway system interoperability. Pursuant to it, “The Romanian Railway Notified Body which
functions within the Romanian Railway Authority shall publish an infrastructure register indicating the
values of the network parameters of each subsystem or of each part of the subsystem concerned, as
provided in the relevant TSIs. The parameter values recorded in the infrastructure register shall be used in
combination with the parameter values recorded in the vehicle marketing authorization to verify the
technical compatibility between the vehicle and the network. The infrastructure register may set down
conditions for using the fixed installations, as well as other restrictions. The Romanian Railway Notified Body
which functions within the Romanian Railway Authority shall update the infrastructure register in
accordance with the provisions of Article 49(5) of Directive 2016/797”.
2026 CFR Network Statement Version: 15.1.6 Section: Infrastructure A Page
Date: 29.05.2026 28 of 98
Compania Nationala de Cai Ferate “CFR” S.A. Romania
RINF can be found on the website: https://rinf.era.europa.eu/rinf
Track Typologies
Out of the 10 628 km of the CFR railway network, there are:
2 917 km of double-track line;
7 711 km of single-track line.
These lines are highlighted on the map set out in Annex 2.a.
Track Gauges
The CFR railway network has the European (normal) gauge of 1 435 mm.
Nevertheless, there are some short sections at the railway borders with the Ukraine (UZ) and the Republic
of Moldavia (CFM), where the line with normal gauge is doubled by a line with the wide gauge of 1 520 mm
along the distance from the CFR border station to the neighbouring railway administration. These lines are
set out in Annex 6.
Moreover, a 44 km long peage line with wide gauge (1 520 mm) is situated on the Romanian territory
between the stations Teresva (UZ) – Campulung la Tisa (CFR) and Valea Viseului (CFR) – Berlibas (UZ).
In order to ensure the uninterrupted international railway traffic from the normal gauge to the wide gauge,
there are provided at the Romanian borders with Ukraine and the Republic of Moldavia the transhipment
stations and transposition stations that are set out in the table included in Annex 6.
The transhipment stations ensure the transhipment (move) of the goods from the normal gauge wagons to
the broad gauge wagons and vice versa.
The transposition stations ensure the transposition of the normal gauge wagons (the change of the
axles/bogies) to the broad gauge wagons and vice versa.
The gauge of the lines is shown on the map in Annex 2.a.
Stations and Nodes
The stations are sectioning points with lines for train traffic, shunting operations and other railway transport
operations. In the meaning of this NS, stations also refer to movement halts.
There are 904 stations on the railway network managed by CFR.
The CFR Stations are shown on the railway map in Annex 2.a.
The railway nodes are the stations with more than two travelling ways or the connections (railway branches)
of the running line.
The distances between the stations (nodes) are set out in the rail service books which are drawn up and
published annually by CFR, and regularly in the „Kilometre indicator”.
Loading Gauge
The loading gauge on the CFR network is “the CFR wagon loading gauge” the sizes of which are set out in
the UIC Loading Guidelines (former Annex II RIV).
The loading gauge applicable on the CFR network is indicated in the Instructions No. 328/2008 on
exceptional transports on the railway infrastructure set out in Article 2.3.5. of the NS.
2026 CFR Network Statement Version: 15.1.6 Section: Infrastructure A Page
Date: 29.05.2026 29 of 98
Compania Nationala de Cai Ferate “CFR” S.A. Romania
The transports exceeding the sizes of “the CFR wagon loading gauge” are considered exceptional transports
(out-of-loading gauge), and are dealt with in accordance with the the instructions for the admission and
dispatch of exceptional transports on the public infrastructure no. 328, approved by Order of the Minister
of Transport no. 103/29.01.2008, for each and every case and route.
Weight Limits
The maximum axle load for the lines of CFR is 20 tones/axle.
The maximum weight a dmitted per linear meter of the lines of CFR is 7.2 tones/meter.
The transports exceeding the maximum admitted load and/or the maximum admitted weight are
considered exceptional transports (with exceeded tonnage), and are dealt with in accordance with the
Instructions No. 328/2008 for each and every case and route.
On CFR lines that have been rehabilitated, the maximum permissible axle load is 22.5 tons/axle.
On these lines, the maximum weight allowed per linear meter is 8.00 tons/meter.
The lines on which the maximum permissible axle load is 22.5 tons/axle and the maximum permissible
weight per linear meter is 8.00 tons/meter are shown in the following table.
Total km
Line Interval
undeveloped
Sighișoara - Pod Mureș -
300 98,00
Coșlariu
200 Coșlariu-Șibot 47,00
200 Șibot-Mintia 41,00
200 Mintia-Ilia 17,00
200 Ilia-Vărădia 49,00
200 Vărădia-Bârzava Nouă 17,00
200 Bârzava Nouă-Glogovăț 51,50
Glogovăț- Arad – Curtici -
200 32,00
Frontieră Ungaria
300 București-Predeal 142,00
800 București-Constanța 225,00
TOTAL 719,50
Total km undeveloped 1439,00
Line Gradients
The CFR line gradients are set out in Annex 9.
2026 CFR Network Statement Version: 15.1.6 Section: Infrastructure A Page
Date: 29.05.2026 30 of 98
Compania Nationala de Cai Ferate “CFR” S.A. Romania
Maximum Line Speed
The CFR railway network permits conventional running speeds of maximum 160 km/h. There is no high-
speed line in Romania.
The maximum speed admitted on each traffic section is indicated in the rail service books which are drawn
up by CFR annually, before changing the timetable, and which are made available to the RUs. The rail service
books may be ordered before the entry into force of a timetable or may be studied, upon request, at the
headquarters of the Traffic Directorate of CFR. The contact data are:
Traffic Directorate, Capacity Allocation Office
Address: 38 Dinicu Golescu Blvd., 1 Bucharest 010873, Romania
Phone: +40 21 319 25 10
Fax: +40 21 319 25 11
E-mail: [email protected]
Maximum Train Lengths
The maximum train lengths on a certain traffic section are limited by the maximum useful length of the lines
in the receiving/dispatching stations with the lowest useful lengths on the relevant section. In certain cases,
CFR may approve a longer train length if some certain specific operating conditions are complied with.
The useful lengths of the lines in the stations are included in the Technical Operation Plans of each station,
and may be made available by the Traffic Directorate. The contact data are those specified at point 1.6 of
the NS.
Power Supply
Commencing with 1 September 2014, the traction current is purchased on the electricity market OPCOM
by SC “Electrificare CFR” SA, a specialized subsidiary of CFR. The traction current (TC) is transformed from
110 KV to 25 KV in the CFR traction substations, and is distributed in the contact wire.
The elements of the traction current supply system are part of the public railway infrastructure managed
by CFR.
Power system characteristic:
- the current supply voltage: 25 KV nominal
- the frequency of the contact wire: 50 Hz nominal
- the height of the contact wire as to the head of the track: 5 750 mm/5500 mm
The map containing the electrified lines is set out in Annex 2.a.
The contact data for obtaining information on the traction current supply system:
S.C. „Electrificare CFR” S.A.
Address: 38 Dinicu Golescu Blvd., 1 Bucharest
Phone: 021-3192512
Fax: 021-3119838
Web: www.electrificarecfr.ro
E-mail: [email protected]
2026 CFR Network Statement Version: 15.1.6 Section: Infrastructure A Page
Date: 29.05.2026 31 of 98
Compania Nationala de Cai Ferate “CFR” S.A. Romania
Signalling Systems
The Romanian railway infrastructure is equipped with two-speed step signalling systems, and multiple-
speed step signalling systems, both types being equipped with additional signalling devices, as necessary.
The indications of set or reduced speed are sent by the traffic lights, light signals, and indicators that are
preceded by warning beacons, as necessary.
The signals mainly cover the sectioning points, the level crossings (barriers), and the running line branches,
and are usually placed on the right side of the line, in the running direction of the train or above the line
axis.
Depending on the signalling installations mounted in the stations and on the running lines, the following
systems are used for organising the train traffic:
a) the train traffic based on phone agreement – free way;
b) the train traffic based on the Automatic Block Line (ABL);
c) the train traffic based on the dispatching installation;
d) the interlocked management of the train traffic.
The ABL traffic system is implemented on the main lines and on the lines with significant traffic.
For the control of the correct perception, interpretation and application of the signal indications by the
driver, the signalling installations are equipped with automatic train speed control (INDUSI with/or ETCS),
in case of non-observance by the locomotive driver of the indications of the signals/authorization of
movement. The INDUSI and ETCS systems ensures at least:
a) the spot (INDUSI) or continuous (ETCS) control of the train speed depending on the train rank;
b) the automatic braking of the train, if the driver is not watchful/does not respect the maximum
imposed speed;
The level crossings are signalled with the help of 1.195 automatic signalling installations with and without
half-barriers (automatic half-barrier at level crossing, automatic signalling at level crossing).
The specific regulations regarding the signalling used on the Romanian railway infrastructure are set out in
the Signalling Regulation No. 004/2006 (see Article 2.4).
The arrangement of the traffic systems per traffic sections on the whole CFR network is set out on the map
in Annex 2.c.
Traffic Control Systems
The traffic control is performed with the help of the switch control installations that ensure the switch
operation according to the necessary train traffic route.
Most of the railway stations are equipped with interlocking systems, but there are also stations which are
situated on low-traffic sections, and are equipped with key-operated switch and signal control systems.
Their classification is the following:
77 electronic interlocking systems
15 electromechanical interlocking systems with computer-assisted control station
559 electrodynamic interlocking systems
39 electromechanical interlocking systems
145 interlocking installations
151 non-interlocking installations
The stations and the relevant type of interlocking systems are set out on the map in Annex 2.c.
2026 CFR Network Statement Version: 15.1.6 Section: Infrastructure A Page
Date: 29.05.2026 32 of 98
Compania Nationala de Cai Ferate “CFR” S.A. Romania
Communication Systems
The radio communication system is used for the ground-train communications (between the traffic
manager and the train driver) with regard to the traffic safety and the shunting activity.
The CFR radio communication system is dedicated to the Romanian railway infrastructure.
This radio communication system works on the basis of the Emergency Ordinance No. 79/2002 regarding
the general regulatory framework for communications approved with amendments and supplements by
means of Law No. 591/2002, as further amended and supplemented. Articles 22 to 31, Article 55(1)(g) and
(2) of the Emergency Ordinance No. 79/2002 were abrogated by means of Law No. 154/2012 on the regime
of the infrastructure of the electronic communications networks.
Based on the above-mentioned legislation, CNCF “CFR” SA received the licence MT-PMR 0145/2006 which
grants it the right to use radio frequencies for the provision of electronic communications networks for
private use in the terrestrial mobile service.
The licence was obtained for the use of frequencies in accordance with the following technical and
operational conditions:
Network coverage: national
Communications type: voice
Operation mode: simplex
Frequency channel: 12.5KHz/25KHz
Frequency band: 146 000 – 146 800 MHz
The common frequencies are the following:
146 200 MHz and 146 225 MHz - for traffic
146 125MHz; 146 150MHz; 146 175MHz; 146 250MHz; 146 375MHz as well as other frequencies from the
frequency band (146 000 – 146 800) MHz - for shunting;
In order to have access to the CFR railway infrastructure, any RU shall ask CFR to approve the use of some
frequencies specific to the railway radio communication system according to the activities to be carried out.
Every RU will also attach to the request for frequency the technical sheets of the radio transmission devices
to be used.
The technical characteristics of the radio transmission devices shall comply with the requirements of
ANCOM (The National Authority for Management and Regulation in Communications) included in Annex
10.
The RU may lease, against payment, radio transmission devices from SC “Telecomunicatii Feroviare“ SA,
CFR’s specialised subsidiary, within the limits of the available stock.
CFR grants to each railway undertaking, within the access package included in the IAC, the right to use the
traffic frequencies as well as some shunting frequencies – specific to each RU, according to the frequency
allocation authorizations, dedicated to each CFR radio communication network.
For the approval of the RU specific frequencies and more information on the radio communication system,
the RU may contact:
Compania Nationala de Cai Ferate - CFR SA, Installation Directorate
Phone: +40 21
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c263a03e282fd1a41999104a7c4f6b7621f27637ae19f710e9fb29da1eae84fd