Document colectat · PNRR România, plan și decizii
ANNEX to the COUNCIL IMPLEMENTING DECISION amending Implementing Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Romania
- Instituția sau publicația sursă
- PNRR România, plan și decizii
- Data preluării
- 26.09.2026 17:54
- Dimensiunea materialului
- 3.786,9 KB
Conținutul disponibil în colecție
Textul documentului
229/2009).
26 Investment 1. Target New areas of ha 0 18 000 Q2 2026 New areas of afforested or
Afforestation afforested or reforested land (total 18 000 ha).
and reforested land
reforestation
national
campaign,
including
urban forests
28 Investment 1. Target New areas of m2 0 200 000 Q2 2026 New areas of urban forests (total
14452/25 ADD 1 20
ECOFIN 1A EN
Quantitative
Indicative timeline
Related indicators
Qualitative for completion
Seq. Measure Milestone/ (for targets) Description of each milestone
Name indicators
Num. (Reform or Target Unit and target
(for milestones)
Investment) of Baseline Goal Quarter Year
measure
Afforestation urban forests 200 000 m2).
and created
reforestation
national
campaign,
including
urban forests
29 Investment 2. Target New or Number 0 90 Q2 2026 A total of 90 tree nurseries shall be
Modern rehabilitated tree either constructed or rehabilitated.
production nurseries The production of reproductive
capacities of material shall target tree species
forest and ecotypes that are suitable for
reproduction Romania’s future projected
material climatic conditions.
34 Investment 3 Milestone Entry into force Provision in the Q2 2026 Entry into force of legal act(s) for
Identification of legal act(s) for law indicating the designation of strictly
of potential the designation the entry into protected areas (in the sense of the
areas for strict of strictly force of EU Biodiversity Strategy 2030
protectionin protected areas legislative act(s) and which can be referred to under
natural a different name in the Romanian
terrestrial and legal acts) identified in
marine Natura 2000 protected areas and
habitats in additional areas.
line with the
EU
Biodiversity
Strategy for
2030
39 Investment 4 Milestone Network for Network Q2 2026 Delivery of pontoon,
Monitoring monitoring, equipment measurements boats, laboratory
14452/25 ADD 1 21
ECOFIN 1A EN
Quantitative
Indicative timeline
Related indicators
Qualitative for completion
Seq. Measure Milestone/ (for targets) Description of each milestone
Name indicators
Num. (Reform or Target Unit and target
(for milestones)
Investment) of Baseline Goal Quarter Year
measure
system for communication delivered equipment, IT equipment, SUV
wild and transmission cars, artificial intelligence
sturgeons of wild sturgeon processing system, technical
along the data support system for a network for
Lower monitoring, communication and
Danube transmission of wild sturgeon data
along the Lower Danube. Vehicles
to be purchased shall have specific
emissions of CO2, that are lower
than 50gCO2/km. The
measurement boats to be
purchased shall correspond to the
best-available technology from an
environmental point of view.
41 Investment 5. Milestone Approval of Approval of Q1 2023 The project design for the
Integrated project design project design modernisation works for flood
flood risk protection shall be approved. It
mitigation shall include actions for the:
systems in - Restoration of at least six
forest river damaged alluvium retention
basins structures to install longitudinal
measures, among others, fish
ladders;
- Construction of at least 30 new
alluvial structures, including fish
ladders and ecological flow,
with a maximum height of 5m;
- The restoration of at least 4ha of
land through reforestation,
weeding, or building of twig
14452/25 ADD 1 22
ECOFIN 1A EN
Quantitative
Indicative timeline
Related indicators
Qualitative for completion
Seq. Measure Milestone/ (for targets) Description of each milestone
Name indicators
Num. (Reform or Target Unit and target
(for milestones)
Investment) of Baseline Goal Quarter Year
measure
fences;
- The restoration of at least 30km
of torrent bed.
Any measures identified in the
framework of the assessment under
Directive 2000/60/EC (Water
Framework Directive) as necessary
to ensure compliance with the Do
No Significant Harm Technical
Guidance (2021/C58/01) shall be
integrated into the project design
and strictly complied with at the
stages of construction,
modernisation, operation and
decommissioning.
42 Investment 5. Milestone Modernisation Modernisation of Q2 2026 The project design for
Integrated works for flood works for flood modernisation of flood protection
flood risk protection protection set out in milestone 41 shall be
mitigation constructed.
systems in
forest river
basins
14452/25 ADD 1 23
ECOFIN 1A EN
B.3. Description of the reforms for the loan
Reform 2. Reform of the management system of protected natural areas for the European
Biodiversity Strategy
The objective of this reform is to amend the current framework for designating nature protected
areas. The reform consists of legal acts to ensure that the existing legal framework for various
sectors with an impact on biodiversity does not affect nor restrict the conservation measures in the
management plans of the nature protected areas.
14452/25 ADD 1 24
ECOFIN 1A EN
B.4. Milestones, targets, indicators, and timetable for monitoring and implementation for the loan
Ind
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
2d42cc042ec0b415a2656a4949f50e85266b99d38d037ae1e7b0516b19e5384b