Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul documentului colectat

Secțiuni și tabele

Compania Naţională de Căi Ferate “CFR” S.A.                                                 România

Working point Dornesti, wide gauge – attached to the Operating License series AE nr. 336-

R5/25.10.2021.

Access to industrial lines and/or freight terminal property of Unicom Holding and operated in whole / in part by other econominal agents RTO and which are connected to the CFR Dornesti infrastructure, by industrial transit line 13 CL property of SNTFM CFR Marfa SA and by diagonal 8-26 operated by Grup Feroviar Roman SA and diagonal 26-36 operated by CFR Marfa; Industrial railway LFI 4 CL (wide gauge) wide gauge rail: 245,33 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines Unicom Holding S.A. Working point Dornesti, wide gauge – attached to the Operating License series AE no. 336-

R5/25.10.2021.

Access to industrial lines and/or freight terminal property of Unicom Holding and operated in whole / in part by other econominal agents RTO and which are connected to the CFR Dornesti infrastructure, by industrial transit line 13 CL property of SNTFM CFR Marfa SA and by diagonal 8-26 operated by Grup Feroviar Roman SA and diagonal 26-36 operated by CFR Marfa; Industrial railway LFI 2 CN (normal gauge) Normal gauge rail: 118,47 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines of Unicom Holding S.A. Dornesti working point, wide gauge – attached to the Operating License series AE nr. 336-

R5/25.10.2021.

Industrial railway LFI 3 CN (normal gauge) Normal gauge rail: 251,03 LM; non-electrified – as per Technical Conditions Annex A and Regulations on the way to perform the rail transport/shunting activities on the industrial rail lines Unicom Holding S.A. Working point Dornesti, wide gauge – attached to the Operating License series AE nr. 336-

R5/25.10.2021.

Access to Dornesti Terminal/ working point is indirect, by means of transit rails, namely:

  • - on wide gauge rail – access by wide gauge rail no. 13 CL, property of SNTFM CFR Marfa SA,

respectively turnover no. 36, property Unicom Holding SA, on the diagonal 36-8, on the transit line between the turnover 26 and the turnover 8 managed by Grup Feroviar Roman SA, over the turnover 26 – property of SNTFM CFR Marfa, turnover 20 – TVM owned, turnover 14 – TVM owned and turnover 8 – property SNTFM CFR Infrastructura, by the turnovers station no. 2, the Y end of the CFR Dornesti station, with access to the wide gauge rails in the Dornesti station.

  • - on normal gauge rail – access by transit normal rail no.30, property of CFR, respectively by the

junction point turnover no. 24 (property SNTFM CFR Marfa SA). Access in Dornesti station ensured by normal gauge transit lines no. 14, CN (property SNTFM CFR Marfa SA) or 15CN and 16CN (property

Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963