Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul documentului colectat

Secțiuni și tabele

                                       Compania Naţională de Căi Ferate “CFR” S.A.                                                  România
2.5   Checking railway vehicles Service description      Carrying out transport verification and measurement operations in order to identify exceptional shipments
      with          exceptional                          as well as their storage
      transport
                                Type of service          Basic
                                 3. Description of the service infrastructures operated by SC TFIN SRL
3.1   List       of      service Nr.
                                        Name                                 Services provided
      infrastructures            crt
                                 1      First line of receipt-shipment       Commercial stops of passenger trains at the station
                                                                             Maneuvering of railway vehicles
                                                                             Checking railway vehicles with exceptional transport
                                 2      Receipt-shipping line 2              Commercial stops of passenger trains at the station
                                                                             Maneuvering of railway vehicles
                                                                             Checking railway vehicles with exceptional transport
                                 3      Receipt-shipping line 3              Commercial stops of passenger trains at the station
                                                                             Maneuvering of railway vehicles
                                                                             Checking railway vehicles with exceptional transport
                                 4      Line 4 loading-unloading with Maneuvering of railway vehicles
                                        ramp
                                                                      Parking when loading / unloading wagons
                                 5      Line 6 loading-unloading             Maneuvering of railway vehicles
                                                                             Parking when loading / unloading wagons
3.2   Infrastructure no. 1       Name                      First line of receipt-shipment
                                 Location                  Str. Feroviarilor, no. 5, loc. Tulucești, Galați County
                                 Operating period          Permanent
                                 Technical                 Length = 498 m
                                 specifications

Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963