Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul documentului colectat

Secțiuni și tabele

                             Compania Naţională de Căi Ferate “CFR” S.A.                                                       România
                               14                   Line 21B                  Shunting, parking, convoy access shunting
                               15                   Line 22B                  Shunting, parking, convoy access shunting
                               16                   Line 23B                  Shunting, parking, convoy access shunting
                               17                   Line 24B                 Shunting, parking, convoy access shunting
                               18                                            loading - unloading, unavailable line in the process
                                                    Line 25B                 of modification
3.2   Infrastructure no. 1     Name                            8B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        PALAS station
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=961m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.3   Infrastructure no. 2     Name                            9B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        PALAS station
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=909 m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.4   Infrastructure no. 3     Name                            10B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        StatiaPALAS
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=957 m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.5   Infrastructure no. 4     Name                            11B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        PALAS station
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=1039 m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.6   Infrastructure no. 5     Name                            12B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        PALAS station
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=1011 m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.7   Infrastructure no. 6     Name                            13B-Industrial railway line connected to the public railway infrastructure from PALAS station
                               Location                        PALAS station
                               Operating period                24/24
                               Technical features              Shunting/Shipping; Length=1058 m; PTE; Convoy access, parking, shunting
                               Planned changes                 None
3.8   Infrastructure no. 7     Name                            14B-Industrial railway line connected to the public railway infrastructure from PALAS station

Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963