Document colectat · Documentul de referință al rețelei feroviare 2026
Service infrastructures of other operators
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:56
- Dimensiunea materialului
- 3.245,5 KB
Conținutul documentului colectat
Secțiuni și tabele
Compania Naţională de Căi Ferate “CFR” S.A. România
3.7 Infrastructure no. 6 Name 15 N -Industrial railway line connected to the public railway infrastructure from
Dornesti Station
Location Dornesti Station
Operating period 24/24
Technical features Length=434 m; PTE; Access convoys shunting, Parking, Shunting
Planned changes None
3.8 Infrastructure no. 7 Name 16 N -Industrial railway line connected to the public railway infrastructure from
Dornesti Station
Location Dornesti Station
Operating period 24/24
Technical features Length=402 m; PTE; Access convoys shunting, Parking, Shunting
Planned changes None
4. Tariffs
4.1 Information on tariffs Single tariff for services offered: Convoy access, parking, shunting of railway vehicles on industrial railway lines-38
lei/rolling stock/day (physical wagon, locomotive).
4.2 Information on discounts on tariffs. GRUP FEROVIAR ROMAN do not grant discounts on tariffs.
5. Access conditions
5.1 Legal requirements Line usage contracts concluded between GFR and OTF. OTF are holders of the Transport Licence, the Unique Safety
Certificate and the LFI introduced in the List annexed to the CUS.
5.2 Technical conditions The technical conditions to be respected for the use of the service infrastructures - type and maximum length of
rolling stock, gauge, maximum tonnage allowed - LFI GFR Dornesti are included in the LFI Operating Permit and
Regulations on the way of carrying out the shunting/transport activity on the LFI GFR Dornesti.
5.3 Self-provision of services Not applicable
5.4 IT systems Not applicable
6 . Allocation of service capacities
6.1 Requesting access Requesting On the basis of the Line User Agreements signed with OTF, access is requested by OTF through written notification
access to the representatives of LFI GFR Dornesti.
6.2 Response to request Response It is done in compliance with the provisions of Law 202/2016, art. 13, para. 4 and Regulation 2177/2017, art.10.
to request
6.3 Available capacities and temporary Available According to the Technical Operating Regulation of LFI GFR Dornesti, the Regulations on how to carry out the
restrictions capacities handling/transport activity on LFI, respectively the Annexes to the AE. There are no temporary restrictions.
and
temporary
restrictions
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963