Service infrastructures of other operators

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:56
Dimensiunea materialului
3.245,5 KB

Conținutul disponibil în colecție

Textul documentului

România reductions 5. Conditions for access to service infrastructures operated by SC TFIN SRL 5.1 Legal requirements Legal requirements 5.2 Technical conditions Maximum train length = 450 m The maximum tonnage of the wagon convoy that can be maneuvered on the station lines is 500 tons. The conditions of movement and handling of exceptional transports are ensured on the receiving-dispatch lines. 5.3 Self-provision of services In order to carry out railway transport operations, OTF has the following responsibilities: ownership operation (AVF of the locomotive) and ensuring the attestation, authorization and professional examination of its own staff with responsibilities in SC. 5.4 IT systems It's not necessary 6. Allocation of service capacities provided by SC TFIN SRL 6.1 Commercial stops of passenger trains at the station - not the case Request for access Maneuvering of railway vehicles - in order to carry out the maneuver, the OTF requests this, in writing, in the register of provisions for the movement of trains from the needle inspector. The execution of the maneuver is done only on the basis of the written order of the RC operator which is sent by the needle inspector to the driver of the maneuver by traffic order. Operational parking of rolling stock - in order to perform the maneuver, the OTF requests this, in writing, in the register of train traffic arrangements from the needle inspector. The execution of the maneuver is done only on the basis of the written order of the RC operator which is sent by the needle inspector to the driver of the maneuver by traffic order. Parking / unloading of wagons - in order to perform the maneuver, the OTF requests this in writing in the train traffic register from the needle inspector. The execution of the maneuver is done only on the basis of the written order of the RC operator which is sent by the needle inspector to the driver of the maneuver by traffic order. Verification of railway vehicles with exceptional transport - request of the economic operator to set up the commission for the measurement and verification of transport 6.2 If there are at the same time several requests for access to the service infrastructures and / or to the services provided within the Response to request infrastructures, they will be solved as far as possible from the respective moment in the station, in accordance with art. 13 para. 4 of law 202/2016 6.3 Available capacities and No changes are planned. temporary restrictions Compania Naţională de Căi Ferate “CFR” S.A. România Regional: BUCHAREST HM: OLTENITA Service operator - SC Transferoviar Infrastructura Neinteroperabila SRL Service station infrastructure Nr. Title General information crt 1. General information 1.1 Nr. Denumire Adresa Date contact Service infrastructure crt operators 1 SC TFIN SRL Str1 DECEMBRIE 1918, nr.121, Tel. VODAFONE 0725 679564 loc. OLTENITA, CALARASI county [email protected] 1.2 Validity period and 12.12.2021 - 10.12.2022 - permanent update update process 2. Services of SC TFIN SRL 2.1 Commercial stops of Service description They involve access to the station, in its building where the travel information is displayed and travel cards passenger trains at the are issued, lines for parking trains in order to perform various technical and commercial operations, those station lines being lines for receiving-sending trains. Type of service Basic 2.2 Maneuvering of railway Service description Performing maneuvers in order to decompose and compose trains, groups of wagons vehicles Type of service Basic 2.3 Operational parking of Service description Provision of railway station infrastructure for the operational parking of wagons Compania Naţională de Căi Ferate “CFR” S.A. România rolling stock Type of service Basic 2.4 Parking when loading / Service description Provision of public lines in the station for loading and unloading wagons unloading wagons Type of service Basic 2.5 Checking railway vehicles Service description Carrying out transport verification and measurement operations in order to identify exceptional shipments with exceptional as well as their storage transport Type of service Basic 3. Description of the service infrastructures operated by SC TFIN SRL List of service Nr. Name Services provided 3.1 infrastructures crt Repair line 0 Maneuvering of railway vehicles 1 Gasket storage Gasket storage First line of receipt-shipment Commercial stops of passenger trains at the station 2 Rolling stock handling Maneuvering of railway vehicles Checking railway vehicles with exceptional transport 3 Line 1a, for receiving-sending Commercial stops of passenger trains at the station rolling stock handling Maneuvering of railway vehicles 4 Line 1b, for receiving and Commercial stops of passenger trains at the station sending rolling stock handling Maneuvering of railway vehicles Checking railway vehicles with exceptional transport 5 Receipt-shipping line 2 Commercial stops of passenger trains at the station Maneuvering of railway vehicles Checking railway vehicles with exceptional transport 6 Receipt-shipping line 3 Commercial stops of passenger trains at the station Compania Naţională de Căi Ferate “CFR” S.A. România Maneuvering of railway vehicles Checking railway vehicles with exceptional transport 7 Line 4 of receipt-shipment Commercial stops of passenger trains at the station Maneuvering of railway vehicles Checking railway vehicles with exceptional transport 8 Line 5 Gross storage for Maneuvering of railway vehicles unloading wagons Stationary railway vehicles 9 Line 6 Gross storage for Maneuvering of railway vehicles unloading wagons Stationary railway vehicles 10 Line 7 Gross storage for Maneuvering of railway vehicles unloading wagons Stationary railway vehicles 11 Line 8 Gross storage for Maneuvering of railway vehicles unloading wagons Stationary railway vehicles 12 Line 9 Gross storage for Maneuvering of railway vehicles unloading wagons Parking when loading / unloading wagons 13 Line 9a Gross storage for Maneuvering of railway vehicles unloading wagons Parking when loading / unloading wagons 14 Line 9b Gross storage for Maneuvering of railway vehicles unloading wagons Parking when loading / unloading wagons 15 Line 10 Gross storage for Maneuvering of railway vehicles unloading wagons Parking when loading / unloading wagons Compania Naţională de Căi Ferate “CFR” S.A. România 16 Line 11 Sing Maneuvering of railway vehicles Weighing the wagons 17 Line 11b Gross storage for Maneuvering of railway vehicles unloading wagons Parking when loading / unloading wagons 18 Line 12 loading and unloading Maneuvering of railway vehicle wagons Parking when loading / unloading wagons 3.2 Infrastructure no. 1 Name Line 0 material handling. Rolling stock storage Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 328m specifications Planned changes in It's not necessary technical characteristics 3.3 Infrastructure no. 2 Name First line of receipt-shipment Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 772m specifications Planned changes in It's not necessary technical characteristics 3.4 Infrastructure no. 3 Name 1st line of receipt-shipment Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Compania Naţională de Căi Ferate “CFR” S.A. România Technical Length = 370m specifications Planned changes in It's not necessary technical characteristics 3.5 Infrastructure no. 4 Name Receipt-dispatch line 1b Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 402m specifications Planned changes in It's not necessary technical characteristics 3.6 Infrastructure no. 5 Name Receipt-shipping line 2 Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 773m specifications Planned changes in It's not necessary technical characteristics 3.7 Infrastructure no. 6 Name Receipt-shipping line 3 Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 790m specifications Planned changes in It's not necessary technical Compania Naţională de Căi Ferate “CFR” S.A. România characteristics 3.8 Infrastructure no. 7 Name Line 4 of receipt-shipment Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 596m specifications Planned changes in It's not necessary technical characteristics 3.9 Infrastructure no. 8 Name Line 5 gross accumulation and maneuver Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 651m specifications Planned changes in It's not necessary technical characteristics 3.10 Infrastructure no. 9 Name Line 6 gross accumulation and maneuver Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 627m specifications Planned changes in It's not necessary technical characteristics 3.11 Name Line 7 gross accumulation and maneuver Infrastructure no. 10 Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Compania Naţională de Căi Ferate “CFR” S.A. România Operating period Permanent Technical Length = 627m specifications Planned changes in It's not necessary technical characteristics 3.12 Infrastructure no. 11 Name Gross accumulation and maneuvering line 8 Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 607m specifications Planned changes in It's not necessary technical characteristics 3.13 Infrastructure no. 12 Name Line 9 loading-unloading maneuver Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operating period Permanent Technical Length = 504m specifications Planned changes in It's not necessary technical characteristics 3.14 Infrastructure no. 13 Name Line 9a loading-unloading maneuver Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county Operati
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963