reductions
5. Conditions for access to service infrastructures operated by SC TFIN SRL
5.1 Legal requirements Legal requirements
5.2 Technical conditions Maximum train length = 450 m
The maximum tonnage of the wagon convoy that can be maneuvered on the station lines is 500 tons.
The conditions of movement and handling of exceptional transports are ensured on the receiving-dispatch lines.
5.3 Self-provision of services In order to carry out railway transport operations, OTF has the following responsibilities: ownership operation (AVF of the
locomotive) and ensuring the attestation, authorization and professional examination of its own staff with responsibilities in SC.
5.4 IT systems It's not necessary
6. Allocation of service capacities provided by SC TFIN SRL
6.1 Commercial stops of passenger trains at the station - not the case
Request for access
Maneuvering of railway vehicles - in order to carry out the maneuver, the OTF requests this, in writing, in the register of provisions
for the movement of trains from the needle inspector. The execution of the maneuver is done only on the basis of the written
order of the RC operator which is sent by the needle inspector to the driver of the maneuver by traffic order.
Operational parking of rolling stock - in order to perform the maneuver, the OTF requests this, in writing, in the register of train
traffic arrangements from the needle inspector. The execution of the maneuver is done only on the basis of the written order of
the RC operator which is sent by the needle inspector to the driver of the maneuver by traffic order.
Parking / unloading of wagons - in order to perform the maneuver, the OTF requests this in writing in the train traffic register from
the needle inspector. The execution of the maneuver is done only on the basis of the written order of the RC operator which is
sent by the needle inspector to the driver of the maneuver by traffic order.
Verification of railway vehicles with exceptional transport - request of the economic operator to set up the commission for the
measurement and verification of transport
6.2 If there are at the same time several requests for access to the service infrastructures and / or to the services provided within the
Response to request infrastructures, they will be solved as far as possible from the respective moment in the station, in accordance with art. 13 para. 4
of law 202/2016
6.3 Available capacities and No changes are planned.
temporary restrictions
Compania Naţională de Căi Ferate “CFR” S.A. România
Regional: BUCHAREST
HM: OLTENITA
Service operator - SC Transferoviar Infrastructura Neinteroperabila SRL
Service station infrastructure
Nr. Title General information
crt
1. General information
1.1 Nr.
Denumire Adresa Date contact
Service infrastructure crt
operators
1 SC TFIN SRL Str1 DECEMBRIE 1918, nr.121, Tel. VODAFONE 0725 679564
loc. OLTENITA, CALARASI county
[email protected]
1.2 Validity period and 12.12.2021 - 10.12.2022 - permanent update
update process
2. Services of SC TFIN SRL
2.1 Commercial stops of Service description They involve access to the station, in its building where the travel information is displayed and travel cards
passenger trains at the are issued, lines for parking trains in order to perform various technical and commercial operations, those
station lines being lines for receiving-sending trains.
Type of service Basic
2.2 Maneuvering of railway Service description Performing maneuvers in order to decompose and compose trains, groups of wagons
vehicles
Type of service Basic
2.3 Operational parking of Service description Provision of railway station infrastructure for the operational parking of wagons
Compania Naţională de Căi Ferate “CFR” S.A. România
rolling stock Type of service Basic
2.4 Parking when loading / Service description Provision of public lines in the station for loading and unloading wagons
unloading wagons
Type of service Basic
2.5 Checking railway vehicles Service description Carrying out transport verification and measurement operations in order to identify exceptional shipments
with exceptional as well as their storage
transport
Type of service Basic
3. Description of the service infrastructures operated by SC TFIN SRL
List of service Nr.
Name Services provided
3.1 infrastructures crt
Repair line 0 Maneuvering of railway vehicles
1
Gasket storage Gasket storage
First line of receipt-shipment Commercial stops of passenger trains at the station
2 Rolling stock handling Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
3 Line 1a, for receiving-sending Commercial stops of passenger trains at the station
rolling stock handling
Maneuvering of railway vehicles
4 Line 1b, for receiving and Commercial stops of passenger trains at the station
sending rolling stock handling
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
5 Receipt-shipping line 2 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
6 Receipt-shipping line 3 Commercial stops of passenger trains at the station
Compania Naţională de Căi Ferate “CFR” S.A. România
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
7 Line 4 of receipt-shipment Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
8 Line 5 Gross storage for Maneuvering of railway vehicles
unloading wagons
Stationary railway vehicles
9 Line 6 Gross storage for Maneuvering of railway vehicles
unloading wagons
Stationary railway vehicles
10 Line 7 Gross storage for Maneuvering of railway vehicles
unloading wagons
Stationary railway vehicles
11 Line 8 Gross storage for Maneuvering of railway vehicles
unloading wagons
Stationary railway vehicles
12 Line 9 Gross storage for Maneuvering of railway vehicles
unloading wagons
Parking when loading / unloading wagons
13 Line 9a Gross storage for Maneuvering of railway vehicles
unloading wagons
Parking when loading / unloading wagons
14 Line 9b Gross storage for Maneuvering of railway vehicles
unloading wagons
Parking when loading / unloading wagons
15 Line 10 Gross storage for Maneuvering of railway vehicles
unloading wagons
Parking when loading / unloading wagons
Compania Naţională de Căi Ferate “CFR” S.A. România
16 Line 11 Sing Maneuvering of railway vehicles
Weighing the wagons
17 Line 11b Gross storage for Maneuvering of railway vehicles
unloading wagons
Parking when loading / unloading wagons
18 Line 12 loading and unloading Maneuvering of railway vehicle
wagons
Parking when loading / unloading wagons
3.2 Infrastructure no. 1 Name Line 0 material handling. Rolling stock storage
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 328m
specifications
Planned changes in It's not necessary
technical
characteristics
3.3 Infrastructure no. 2 Name First line of receipt-shipment
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 772m
specifications
Planned changes in It's not necessary
technical
characteristics
3.4 Infrastructure no. 3 Name 1st line of receipt-shipment
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Compania Naţională de Căi Ferate “CFR” S.A. România
Technical Length = 370m
specifications
Planned changes in It's not necessary
technical
characteristics
3.5 Infrastructure no. 4 Name Receipt-dispatch line 1b
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 402m
specifications
Planned changes in It's not necessary
technical
characteristics
3.6 Infrastructure no. 5 Name Receipt-shipping line 2
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 773m
specifications
Planned changes in It's not necessary
technical
characteristics
3.7 Infrastructure no. 6 Name Receipt-shipping line 3
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 790m
specifications
Planned changes in It's not necessary
technical
Compania Naţională de Căi Ferate “CFR” S.A. România
characteristics
3.8 Infrastructure no. 7 Name Line 4 of receipt-shipment
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 596m
specifications
Planned changes in It's not necessary
technical
characteristics
3.9 Infrastructure no. 8 Name Line 5 gross accumulation and maneuver
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 651m
specifications
Planned changes in It's not necessary
technical
characteristics
3.10 Infrastructure no. 9 Name Line 6 gross accumulation and maneuver
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 627m
specifications
Planned changes in It's not necessary
technical
characteristics
3.11 Name Line 7 gross accumulation and maneuver
Infrastructure no. 10 Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Compania Naţională de Căi Ferate “CFR” S.A. România
Operating period Permanent
Technical Length = 627m
specifications
Planned changes in It's not necessary
technical
characteristics
3.12 Infrastructure no. 11 Name Gross accumulation and maneuvering line 8
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 607m
specifications
Planned changes in It's not necessary
technical
characteristics
3.13 Infrastructure no. 12 Name Line 9 loading-unloading maneuver
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operating period Permanent
Technical Length = 504m
specifications
Planned changes in It's not necessary
technical
characteristics
3.14 Infrastructure no. 13 Name Line 9a loading-unloading maneuver
Location Str1 DECEMBRIE 1918, nr.121, loc. OLTENITA, CALARASI county
Operati
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963