Document colectat · Documentul de referință al rețelei feroviare 2026
Service infrastructures of other operators
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:56
- Dimensiunea materialului
- 3.245,5 KB
Conținutul disponibil în colecție
Textul documentului
Compania Naţională de Căi Ferate “CFR” S.A. România
Regional: BUCHAREST
HM BUDESTI
Nr. Title General information
crt
1. General information
1.1 Service infrastructure Nr. Name Address Contact data
operators crt
1 SC TFIN SRL Str. Station no. 24, loc.Budesti, jud. Tel. VODAFONE 0725 679564
Calarasi [email protected]
1.2 Validity period and update 12.12.2021 - 10.12.2022 - permanent update
process
2. Services of SC TFIN SRL
2.1 Commercial stops of Service description They involve access to the station, in its building where the travel information is displayed and travel cards are issued,
passenger trains at the lines for parking trains in order to perform various technical and commercial operations, those lines being lines for
station receiving-sending trains.
Type of service Basic
2.2 Maneuvering of railway Service description Performing maneuvers in order to decompose and compose trains, groups of wagons
vehicles
Type of service Basic
2.3 Operational parking of rolling Service description Provision of railway station infrastructure for the operational parking of wagons
stock
Type of service Basic
2.4 Parking when loading / Service description Provision of public lines in the station for loading and unloading wagons
unloading wagons
Type of service Basic
2.5 Checking railway vehicles Service description Carrying out transport verification and measurement operations in order to identify exceptional shipments as well as their
with exceptional transport storage
Type of service Basic
3. Description of the service infrastructures operated by SC TFIN SRL
3.1 List of service infrastructures Nr.
Name Services provided
crt
Compania Naţională de Căi Ferate “CFR” S.A. România
1 First line of receipt-shipment Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
2 Receipt-shipping line 2 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
3 Receipt-shipping line 3 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
4 Line 4 of maneuver Maneuvering of railway vehicles
Stationary railway vehicles
5 Maneuver line 5 Maneuvering of railway vehicles
Stationary railway vehicles
6 Line 6 loading - unloading Maneuvering of railway vehicles
Parking when loading / unloading wagons
7 Shoot avoidance line 7 Maneuvering of railway vehicles
3.2 Infrastructure no. 1 Name First line of receipt-shipment
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 802 m
Planned changes in It's not necessary
technical characteristics
3.3 Infrastructure no. 2 Name Line II of reception-dispatch
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 688 m
Compania Naţională de Căi Ferate “CFR” S.A. România
Planned changes in It's not necessary
technical characteristics
3.4 Infrastructure no. 3 Name Receipt-shipping line 3
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 640 m
Planned changes in It's not necessary
technical characteristics
3.5 Infrastructure no. 4 Name Line 4 of maneuver
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 640 m
Planned changes in It's not necessary
technical characteristics
3.6 Infrastructure no. 5 Name Maneuver line 5
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 444 m
Planned changes in It's not necessary
technical characteristics
3.7 Infrastructure no. 6 Name Line 6 loading-unloading
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 444 m
Planned changes in It's not necessary
technical characteristics
3.8 Infrastructure no. 7 Name Avoidance shooting line 7
Location Str. Station no. 24, loc.Budesti, jud. Calarasi.
Operating period Permanent
Technical specifications Length = 235 m
Compania Naţională de Căi Ferate “CFR” S.A. România
Planned changes in It's not necessary
technical characteristics
4. Tariffs for services provided by SC TFIN SRL
4.1 Tariff information Commercial stops of passenger trains at the station - 0 lei
Maneuvering of railway vehicles - 12.96 lei / maneuvering operation (Annex 8b - DRR 2022)
Operational parking of rolling stock - 0.58 lei / vag / hour; 0.97 lei / MR / hour (Annex 8b - DRR2022)
Parking when loading / unloading wagons - 0.39 lei / vague / hour (Annex 8b - DRR 2022)
Checking the railway vehicles with exceptional transports –19 lei / vehicle (Annex 8b - DRR 2022)
4.2 Information on rate It's not necessary
reductions
5. Conditions for access to the service infrastructures operated by SC TFIN SRL
5.1 Legal requirements According to the access contract on the railway infrastructure; https://transferoviarinfrastructura.ro/documente/Model_contract_2021.pdf
5.2 Technical conditions Maximum train length = 650 m
The maximum tonnage of the wagon convoy that can be maneuvered on the station lines is 500 tons.
The conditions of movement and handling of exceptional transports are ensured on the receiving-dispatch lines.
5.3 Self-provision of services In order to carry out railway transport operations, OTF has the following responsibilities: ownership operation (AVF of the locomotive) and ensuring
the attestation, authorization and professional examination of its own staff with responsibilities in SC.
5.4 IT systems It's not necessary
6. Allocation of service capacities provided by SC TFIN SRL
6.1 Request for access Commercial stops of passenger trains at the station - not the case
Maneuvering of railway vehicles - in order to carry out the maneuver, the OTF requests this, by written Notice drawn up in two copies to the same
supplier. The execution of the maneuver is done based on the written or verbal disposition of the disposing officer.
Operational parking of rolling stock - to perform the maneuver, OTF requests this, by written notice drawn up in two copies to the disposing officer.
The execution of the maneuver is done based on the written or verbal disposition of the disposing officer.
Parking / unloading of wagons - in order to perform the maneuver, the OTF requests this, by written notice drawn up in two copies to the same
supplier. The execution of the maneuver is done based on the written or verbal disposition of the disposing officer.
Verification of railway vehicles with exceptional transport - request of the economic operator to set up the commission for the measurement and
verification of transport
6.2 Response to request If there are at the same time several requests for access to the service infrastructures and / or to the services provided within the infrastructures,
Compania Naţională de Căi Ferate “CFR” S.A. România
they will be solved as far as possible from the respective moment in the station, in accordance with art. 13 para. 4 of law 202/2016.
6.3 Available capacities and No changes are planned.
temporary restrictions
Service station infrastructure
Regional: GALAȚI
HM: Foltesti
Nr. Title General Information
crt
1. General information
1.1 General Information Nr. Name Address Contact data
crt
1 SC TFIN SRL Str. Station, no. 1, loc. Foltești, Galați Tel. VODAFONE 0736 902431
County [email protected]
1.2 Validity period and update 12.12.2021 - 10.12.2022 – permanent update
process
2. Services of SC TFIN SRL
2.1 Commercial stops of Service description They presuppose access to the station, in its building where the information about the trip is displayed, lines for parking
passenger trains at the trains in order to perform various technical and commercial operations, those lines being lines for receiving-sending
station trains.
Type of service Basic
2.2 Maneuvering of railway Service description Performing maneuvers in order to decompose and compose trains, groups of wagons.
vehicles
Type of service Basic
2.3 Operational parking of rolling Service description Provision of railway station infrastructure for the operational parking of wagons
stock
Type of service Basic
2.4 Parking when loading / Service description Provision of public lines in the station for loading and unloading wagons
Compania Naţională de Căi Ferate “CFR” S.A. România
unloading wagons Type of service Basic
2.5 Checking railway vehicles Service description Carrying out transport verification and measurement operations in order to identify exceptional shipments as well as their
with exceptional transport storage
Type of service Basic
3. Description of the service infrastructures operated by SC TFIN SRL
3.1 List of service infrastructures Nr.
Name Services provided
crt
1 First line of receipt-shipment Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
2 Receipt-shipping line 2 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
3 Receipt-shipping line 3 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
4 Wagon storage line 4 Commercial stops of passenger trains at the station
Maneuvering of railway vehicles
5 Wagon storage line 5 Maneuvering of railway vehicles
Checking railway vehicles with exceptional transport
Operational parking of rolling stock
6 Line 6 loading ramp unloading Maneuvering of railway vehicles
Parking when loading / unloading wagons
7 Line 7 loading unloading Maneuvering of railway vehicles
Parking when loading / unloading wagons
3.2 Infrastructure no. 1 Name First line of receipt-shipment
Location Str. Station, no. 1, loc. Foltești, Galați County
Operating period Permanent
Technical specifications Length = 1003 m
Planned changes in It's not necessary
technical characteristics
3.3 Infrastructure no. 2 Name Receipt-shipping line 2
Comp
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
13291ad19fcb65b555c62feac198b5de58984ed7562c85f86d1be72b44ffd963