CFR NETWORK STATEMENT - 2026
ANNEX 29 CONVENTION ON LEVYING THE REDUCED INFRASTRUCTURE ACCESS
CHARGE FOR THE INTERMODAL TRANSPORT TRAINS ON THE CFR
NETWORK TO BE ATTACHED TO THE RAILWAY INFRASTRUCTURE
ACCESS CONTRACT
Validity: 14.12.2025 – 12.12.2026
Version: 15.1.0
Update: 09.02.2026
Compania Nationala de Cai Ferate “CFR” S.A. Romania
CONVENTION
on levying the reduced infrastructure access charge for the intermodal transport trains
on the CFR network to be attached to the Railway Infrastructure Access Contract
No. ............./2025
1. PARTIES TO THE CONVENTION
Compania Naţională de Căi Ferate „C.F.R.”-S.A. headquartered in Bucharest, 38 Dinicu Golescu Blvd., 1st district,
mail code 010873, registered under No. J40/9774/1998, single registration code RO 11054529, duly represented
by Mr. Mr. Ion SIMU - ALEXANDRU, Director General, in its capacity as the railway infrastructure manager in
accordance with GD No. 581/1998, hereinafter called CFR,
and
.............................................................. , headquartered in ................................................................., registered
under No. ...................................., single registration code ................................, duly represented by Mr.
..................................., Director General, in its capacity as rail transport operator, hereinafter called the RTO,
- pursuant to the Law No. 202/2016 on the integration of the Romanian railway system into the single European
railway area;
- based on the Decision no. 4/2024 issued by the CFR SA General Meeting of Shareholders, have agreed to
conclude this Convention with the following clauses:
2. PURPOSE OF THE CONVENTION
2.1. The levying by CFR of the Infrastructure Access Charge (IAC) reduced by 33% as to the IAC level established
in the Access Contract, for the intermodal transport trains on the CFR network with Intermodal Transport Units
(ITUs) running on the traffic routes agreed by CFR and the RTO within the working timetable.
2.2. The intermodal transport trains on the CFR network shall be considered the complete trains composed only
of wagons loaded with ITUs (transcontainers, mobile boxes, semi-trailers and trucks (RO-LA)) or of empty wagons
for ITUs.
CFR Network Statement - 2026 ANNEX 29 Version: 15.1.0 Update: 09.02.2026 Page: 2 / 5
Compania Nationala de Cai Ferate “CFR” S.A. Romania
3. RIGHTS AND OBLIGATIONS OF THE PARTIES
3.1. Rights and Obligations of CFR
3.1.1. The trains which fall within the scope of this Convention shall be notified for the working timetable with
the ITU (Intermodal Transport Units) sign.
3.1.2. When, due to force majeure or works on the railway infrastructure, the intermodal trains are forced to
run on a route other than those established, they shall also be charged with a reduced IAC regardless of whether
they are to run on the new route with numbers other than those established in the rail service book.
3.1.3. If the intermodal trains which are scheduled to run on the routes established at point 2.1 enter the CFR
network with delay or too early, and CFR changes the traffic numbers with which they entered (so as two trains
may not run with the same number in the same timetable), they shall still be considered intermodal trains.
3.2. Rights and Obligations of the RTO
3.2.1. The trains for which a 33% reduction in the IAC is requested shall be confirmed by the management of the
RTO by a statement on its own responsibility stating that those trains fall within the scope of this Convention. In
the absence of this statement, there shall be levied the normal value of the IAC (without the 33% reduction).
3.2.2. In any of the stations on the agreed traffic routes, the RTO may attach/detach to/from the complete
intermodal trains only wagons loaded with ITUs or empty wagons for ITUs.
4. DURATION OF THE CONVENTION
4.1 This Convention shall be valid from December 15, 2024 to December 13, 2025, and may be extended
depending on the economic results.
4.2 The parties will analyze the economic results of the application of this agreement, one month before the
expiration of its validity period. If the economic results are positive, the parties may agree to extend the validity
of the agreement or conclude a new agreement valid for the period of validity of the next access contract only
if an access contract on the railway infrastructure has been concluded between the parties.
Economic results are considered positive in the following situations:
a) for the increasing increase the total train traffic km of the RU’s:
- in the situation of achieving a supra-unit value of the ratio of train km volumes with ITU; the ratio is calculated
by dividing the volume of train km with ITU related to the current reference interval by the train-km volume
with UTI related to the previous reference interval.
b) for the reduction of the total train traffic km of the RU’s:
- in the situation where the value of the ratio of train km volumes with ITU is higher than the value of the ratio
of total train km volumes carried out by RU’s; ratios are calculated by dividing the train-km volume of the current
reference interval by the train-km volume of the previous reference interval
The current reference interval = the January - September period of the validity period of this convention
Previous reference interval = January - September period of the validity period of the previous convention.
CFR Network Statement - 2026 ANNEX 29 Version: 15.1.0 Update: 09.02.2026 Page: 3 / 5
Compania Nationala de Cai Ferate “CFR” S.A. Romania
In the event that the economic results are not positive, the agreement will not be extended or a new agreement
will not be concluded for the validity period of the next access contract.
(Application note for Point 4.2. :
- point 4.2 - is mentioned for OTFs that conclude a UTI agreement at the beginning of the validity period of the
new train schedule and have a previous UTI agreement until the end of the validity period of the train schedule;
- point 4.2 - is not mentioned for OTFs that conclude a UTI agreement for the first time (at the beginning of the
validity period of the new train schedule, or during its validity period;)
5. PAYMENT CONDITIONS AND DEADLINES
5.1 The payment conditions and deadlines shall be those set out in the Railway Infrastructure Access Contract
No. ......../2025 concluded between the parties to the Convention.
5.2. If the ITU intermodal transport trains also fall within the scope of another IAC reduction system (e.g., TZI
international transit), a single IAC reduction shall be applied.
6. DENUNCIATION, CESSATION AND TERMINATION OF THE CONVENTION
6.1 The Parties may denunciate this Convention. The party initiating the denunciation shall notify the other
party of this by means of a 30-day prior notice.
6.2 This Convention shall apply to no new transport contract or addendum to a contract concluded by the RTO
after the expiry of its validity period or its denunciation. In case of the expiry of the validity period or
denunciation of this Convention, the RTO shall prove to CFR within 10 days the existence of the contracts in
progress at the date of the denunciation of the Convention with a view to monitoring the performance.
6.3 This Convention shall be deemed terminated by operation of law, without the intervention of a court or
other judicial body, if:
- the RTO incurs debts (accounts payable) older than 35 days to CFR as a result of the implementation of
this Convention, as well as of the performance of the access contract in force concluded between CFR and the
RTO
- there are found out non-conformities related to the statement on its own responsibility set out in point
3.2.1 of this Convention.
7. APPLICABLE LAW
The law governing this Convention shall be the Romanian law. This Convention shall be supplemented by the
provisions of the Civil Code and other incidental regulations.
CFR Network Statement - 2026 ANNEX 29 Version: 15.1.0 Update: 09.02.2026 Page: 4 / 5
Compania Nationala de Cai Ferate “CFR” S.A. Romania
8. DISPUTES
8.1 Any possible disputes between the parties shall be amicably settled as far as possible.
8.2 If an amicable settlement is not possible, any dispute arising from or in connection with this
Convention, including regarding its conclusion, performance or termination, shall be settled by the
common law courts in the jurisdiction of which the registered office of CFR is located.
9. FINAL PROVISIONS
9.1 This Convention may be modified by means of addenda representing the will of the parties and being an
integral part of this Convention.
9.2 This Convention shall be attached to the main contract principal, namely to the Railway Infrastructure Access
Contract No. ........./2025, concluded with the RTO.
9.3 The parties shall be fully liable for the fulfilment of the clauses of the Convention, and shall bear the
consequences of the obvious impossibility to comply with the obligations set out in the Railway Infrastructure
Access Contract No. ........./2025 which give CFR the right to request the termination of this Convention.
This Convention was signed on ……………......, in two original copies, one copy for each party.
On behalf of On behalf of
Compania Națională de Căi Ferate „CFR” SA ...............................................................
Director General Director General
......................................................... ...........................................
CFR Network Statement - 2026 ANNEX 29 Version: 15.1.0 Update: 09.02.2026 Page: 5 / 5
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
eeb26583e0aa127e2045ddd6b366a48852a0c05cd0c707a9b18faae082029fbb