Document colectat · Documentul de referință al rețelei feroviare 2026
Regulation on the allocation of railway infrastructure capacity
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 422,5 KB
Conținutul disponibil în colecție
Textul documentului
All comments regarding the trains’ paths that do not
Effective path establishment of regional passenger trains and provision to the RU of the Până la
1.4 S.R.C.F. fully comply with the RU request shall be
study of paths according to the requests 29.08. 2025
communicated with the necessary arguments
All the observations necessary to complete the operation
1.5 Firm order of regional passenger trains submitted by each RU 12.09. 2025 RU of the paths establishment shall be submitted.
Deadline for making changes to regional passenger trains in establishing the paths or
1.6 12.09. 2025 O.T.F.
changing technical conditions that would influence the establishment of the path
Completion of regional passenger train path establishment works with graphical
1.7 12.09. 2025 S.R.C.F.
harmonization of connections with regional trains in each railway
2 Elaboration and printing of materials necessary for the implementation of the train timetable
Preparation and technical editing of the central rail service book of the regional passenger Până la
2.1 S.R.C.F.
trains of rank IV 30.09. 2025
Deadline for the publication of the central rail service book for regional passenger trains of
2.2 14.10. 2025 S.R.C.F.
rank IV
The mode of transmission shall be made according to
2.3 Submission to the RU of all data on regional passenger trains paths established 30.09. 2025 S.R.C.F.
the contract
CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 6 / 9
Compania Naţională de Căi Ferate “CFR” S.A. România
Term
Crt.
Name of the work or period of Responsibility Observation
No.
executing
3 Preparation of technical data necessary for establishing trains paths
Receiving the technical data of the rolling stock owned from the railway transport Până la
3.1 O.T.F.
undertakings 14.05. 2025
Până la
3.2 Calculation of travel times and data exchange with RU which have means of traction O.T.F. + A.I.F.P.
13.06. 2025
The communication from the RU of the technological processes specific to each branch: Până la
3.3 O.T.F.
commercial, traction, wagons 13.06. 2025
RU= Railway Undertaking ;
A.I.F.P. = the administrator of the public railway infrastructure; S.R.C.F. = Regional Railway Branch (subunits of A.I.F.P.)
(1) Regional trains are trains that run on several R.C.F.
CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 7 / 9
Compania Naţională de Căi Ferate “CFR” S.A. România
4. PROGRAM OF THE RAILWAY INFRASTRUCTURE CAPACITY ALLOCATION PROCESS
IN INTERNAL FREIGHT TRAFFIC OF REGIONAL SERVICES FOR THE TIMETABLE
(according to ANNEX 3.2 to the Regulation)
Crt. Term or period of
Name of the work Responsibility Observation
No. the work
1 Planning and execution
Applications may also be submitted by regional
Submission to AIFP of requests for allocation of infrastructure capacity by each RU for
1.1 14.07.2025 RU branches of RU if any. The form of Annex 6.2 shall be
regional freight trains (1)
used
The following shall be analyzed: - the number of trains
Analysis of applications submitted in accordance with available infrastructure capacities Până la on each traffic section and the traffic statistics in the
1.2 S.R.C.F.
(traffic, parking, manoeuvring) 14.08.2025 previous timetable - interregional freight trains with
path established - ensuring the periods for track works.
Trains that have had a monthly degree of use of at
1.3 Joint analysis with RU on the establishment of regional freight trains 25 - 29.08.2025 RU + S.R.C.F.
least 30% shall be established
Până la The path establishment shall be carried out by each
1.4 Effective path establishment of regional freight trains S.R.C.F.
30.09.2025 CREIR on the related network
All comments regarding the trains’ paths that do not
1.5 Provision to the RU of the study of paths according to the requests 30.09.2025 S.R.C.F. fully comply with the RU request shall be
communicated with the necessary arguments
All the observations necessary to complete the
1.6 Firm order of interregional freight trains submitted by each RU 14.10.2025 RU operation of the paths establishment shall be
submitted
Deadline for making changes to regional freight trains in path establishment or changing
1.7 14.10.2025 RU
technical conditions that would influence the establishment of the path
Completion of regional freight train path establishment works in accordance and with other
1.8 31.10.2025 S.R.C.F.
freight trains
The mode of transmission will be made according to
1.9 Submission to the RU of all data on regional freight trains paths established 31.10.2025 S.R.C.F.
the contract
CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 8 / 9
Compania Naţională de Căi Ferate “CFR” S.A. România
Crt. Term or period of
Name of the work Responsibility Observation
No. the work
2 Elaboration and printing of materials necessary for the implementation of the train timetable
Preparation and technical editing of the central rail service book of the regional freight Până la
2.1 S.R.C.F.
trains 31.10. 2025
2.2 Deadline for the publication of the central rail service book for regional freight trains 14.11. 2025 S.R.C.F.
3 Preparation of technical data necessary for establishing trains paths
Receiving the technical data of the rolling stock owned from the railway transport Până la
3.1 RU
undertakings 14.05.2025
Până la
3.2 Calculation of travel times and data exchange with RU which have means of traction RU – S.R.C.F.
13.06. 2025
The communication from the RU of the technological processes specific to each branch: Până la
3.3 RU
commercial, traction, wagons 13.06. 2025
RU= Railway Undertaking ; A.I.F.P. = the administrator of the public railway infrastructure; S.R.C.F. = Regional Railway Branch (subunits of A.I.F.P.)
(1) Regional trains are trains that run on several R.C.F.
CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 9 / 9
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
a6c107591723b3c05b04e578f3c0a7010a52c53466bf5b49eaf252e44e50e2fb