Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Documentul de referință al rețelei feroviare 2026

Regulation on the allocation of railway infrastructure capacity

Instituția sau publicația sursă
Documentul de referință al rețelei feroviare 2026
Data preluării
26.09.2026 17:55
Dimensiunea materialului
422,5 KB

Conținutul disponibil în colecție

Textul documentului

All comments regarding the trains’ paths that do not Effective path establishment of regional passenger trains and provision to the RU of the Până la 1.4 S.R.C.F. fully comply with the RU request shall be study of paths according to the requests 29.08. 2025 communicated with the necessary arguments All the observations necessary to complete the operation 1.5 Firm order of regional passenger trains submitted by each RU 12.09. 2025 RU of the paths establishment shall be submitted. Deadline for making changes to regional passenger trains in establishing the paths or 1.6 12.09. 2025 O.T.F. changing technical conditions that would influence the establishment of the path Completion of regional passenger train path establishment works with graphical 1.7 12.09. 2025 S.R.C.F. harmonization of connections with regional trains in each railway 2 Elaboration and printing of materials necessary for the implementation of the train timetable Preparation and technical editing of the central rail service book of the regional passenger Până la 2.1 S.R.C.F. trains of rank IV 30.09. 2025 Deadline for the publication of the central rail service book for regional passenger trains of 2.2 14.10. 2025 S.R.C.F. rank IV The mode of transmission shall be made according to 2.3 Submission to the RU of all data on regional passenger trains paths established 30.09. 2025 S.R.C.F. the contract CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 6 / 9 Compania Naţională de Căi Ferate “CFR” S.A. România Term Crt. Name of the work or period of Responsibility Observation No. executing 3 Preparation of technical data necessary for establishing trains paths Receiving the technical data of the rolling stock owned from the railway transport Până la 3.1 O.T.F. undertakings 14.05. 2025 Până la 3.2 Calculation of travel times and data exchange with RU which have means of traction O.T.F. + A.I.F.P. 13.06. 2025 The communication from the RU of the technological processes specific to each branch: Până la 3.3 O.T.F. commercial, traction, wagons 13.06. 2025 RU= Railway Undertaking ; A.I.F.P. = the administrator of the public railway infrastructure; S.R.C.F. = Regional Railway Branch (subunits of A.I.F.P.) (1) Regional trains are trains that run on several R.C.F. CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 7 / 9 Compania Naţională de Căi Ferate “CFR” S.A. România 4. PROGRAM OF THE RAILWAY INFRASTRUCTURE CAPACITY ALLOCATION PROCESS IN INTERNAL FREIGHT TRAFFIC OF REGIONAL SERVICES FOR THE TIMETABLE (according to ANNEX 3.2 to the Regulation) Crt. Term or period of Name of the work Responsibility Observation No. the work 1 Planning and execution Applications may also be submitted by regional Submission to AIFP of requests for allocation of infrastructure capacity by each RU for 1.1 14.07.2025 RU branches of RU if any. The form of Annex 6.2 shall be regional freight trains (1) used The following shall be analyzed: - the number of trains Analysis of applications submitted in accordance with available infrastructure capacities Până la on each traffic section and the traffic statistics in the 1.2 S.R.C.F. (traffic, parking, manoeuvring) 14.08.2025 previous timetable - interregional freight trains with path established - ensuring the periods for track works. Trains that have had a monthly degree of use of at 1.3 Joint analysis with RU on the establishment of regional freight trains 25 - 29.08.2025 RU + S.R.C.F. least 30% shall be established Până la The path establishment shall be carried out by each 1.4 Effective path establishment of regional freight trains S.R.C.F. 30.09.2025 CREIR on the related network All comments regarding the trains’ paths that do not 1.5 Provision to the RU of the study of paths according to the requests 30.09.2025 S.R.C.F. fully comply with the RU request shall be communicated with the necessary arguments All the observations necessary to complete the 1.6 Firm order of interregional freight trains submitted by each RU 14.10.2025 RU operation of the paths establishment shall be submitted Deadline for making changes to regional freight trains in path establishment or changing 1.7 14.10.2025 RU technical conditions that would influence the establishment of the path Completion of regional freight train path establishment works in accordance and with other 1.8 31.10.2025 S.R.C.F. freight trains The mode of transmission will be made according to 1.9 Submission to the RU of all data on regional freight trains paths established 31.10.2025 S.R.C.F. the contract CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 8 / 9 Compania Naţională de Căi Ferate “CFR” S.A. România Crt. Term or period of Name of the work Responsibility Observation No. the work 2 Elaboration and printing of materials necessary for the implementation of the train timetable Preparation and technical editing of the central rail service book of the regional freight Până la 2.1 S.R.C.F. trains 31.10. 2025 2.2 Deadline for the publication of the central rail service book for regional freight trains 14.11. 2025 S.R.C.F. 3 Preparation of technical data necessary for establishing trains paths Receiving the technical data of the rolling stock owned from the railway transport Până la 3.1 RU undertakings 14.05.2025 Până la 3.2 Calculation of travel times and data exchange with RU which have means of traction RU – S.R.C.F. 13.06. 2025 The communication from the RU of the technological processes specific to each branch: Până la 3.3 RU commercial, traction, wagons 13.06. 2025 RU= Railway Undertaking ; A.I.F.P. = the administrator of the public railway infrastructure; S.R.C.F. = Regional Railway Branch (subunits of A.I.F.P.) (1) Regional trains are trains that run on several R.C.F. CFR Network Statement - 2026 ANNEX 18 Version: 15.1.0 Update: 14.01.2026 Pag: 9 / 9
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

a6c107591723b3c05b04e578f3c0a7010a52c53466bf5b49eaf252e44e50e2fb