Document colectat · Documentul de referință al rețelei feroviare 2026
Service Infrastructures Operators Charges (Railways infrastructure managers)
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 397,4 KB
Conținutul disponibil în colecție
Textul documentului
CFR NETWORK STATEMENT - 2026
ANNEX 7.b SERVICE INFRASTRUCTURES OPERATORS CHARGES
Validity: 14.12.2025 – 12.12.2026
Version: 15.1.1
Update: 06.02.2026
Compania Naţională de Căi Ferate “CFR” S.A. România
SERVICE INFRASTRUCTURE OPERATORS TARIFFS
Operators
VEST TRANS RAIL
RC-CF TRANS
of service
facilities
TFIN
Supply of
No.
charges/services
www.transferoviarinfrastructura.ro
www.vesttransrail.ro
Web
pages
www.rccf.ro
Infrastructure usage rate - IAC for the minimum access
package (lei/train*km)
Passenger
Charge elements depending on the tonnage of the train
Line class C D
Tonnage rate 6,07056 6.58667
Minimum tonnage 60 60
Tonnage factor 0.00014 0.00014
Charge elements depending on the distance travelled
Line class C D
1
Traffic tariff 8,14530 8,14530
Freight
Charge elements depending on the tonnage of the train
Line class C D
Tonnage rate 5,6203 7,99606
Minimum tonnage 60 60
Tonnage factor 0.00020 0.00020
Charge elements depending on the distance travelled
Line class C D
Traffic tariff 10,78309 10,78309
Charge for the access of the shunting convoys to the 29,67
2 11,13 11,13
railway infrastructure (lei/convoy/km) (*1)
-
Charge for shunting on the railway infrastructure
3 - 24,32
lines for railway vehicles (lei/RS)
CFR Network Statement - 2026 ANNEX 7.b Version: 15.1.1 Update: 06.02.2026 Pag: 2 / 5
Compania Naţională de Căi Ferate “CFR” S.A. România
0,83
2,43 0,83
wagons (Lei/ (Lei/
wagon/hour) wagon/hour)
4,06
(for wagons)
Charge for parking the rolling 6,49
4 1,38 (lei/other
stock (lei/RS) (for rolling
rolling stock
other rolling stock stock between
other than 1,38
(*2) 25-100 m)
wagon/hour
11,36
just started)
(for rolling
stock between
25-100 m)
3,21 with
Charge for long time storage the rolling stock prolonged stay;
(lei/wagon/hour) (*3)
5,35
(lei/locomotive
/day)
for
locomotives;
5 8,56 - 2,55
(lei/MR/day)
other rolling stock other than wagons: for MR with
length between
25-50 m;
14,98
(lei/MR/day)
For MR with a
length between
50-100 m.
20,73 lei/
Charge for maneuvering railway vehicles on non- maneuver
6 - -
interoperable railway infrastructure (on station lines) operation
(*4)
69,48
98,15 (lei/employee
7 Charge for exceeding work schedule (lei/hour/employee) -
(*5) /hour actually
started)
Tickets 1,51
Charge (commission) for ticketing service performed by
8 Subscriptions ID - -
CFR (lei/travel pass)
2,34
9 Charge for rolling stock supervision (lei/hour/employee) 28,42 - -
Charge for reopening during the service suspension
period 98,15 estimate of
10
(*6) expenses
Charge for cancelled Without
Charge for non- - -
trains (value/train km) charge
11 compliance/change of
drawn path Charge for additional -
-
trains (value/train km)
Charge for renting -
Charge for additional -
spaces property of
services supplied by
12 Minimum* charge for -
Operator of Service Facility -
renting land property of -
OSF (lei/mp/month)
OSF *(the auction
price)
13 Charge for personal check in stations (lei/check person) - -
CFR Network Statement - 2026 ANNEX 7.b Version: 15.1.1 Update: 06.02.2026 Pag: 3 / 5
Compania Naţională de Căi Ferate “CFR” S.A. România
Charge for parking for loading / unloading wagons
14 2,43 0,83
(lei/wagon per hour)
Charge for commercial stops of passenger trains in -
15 stations and movement stops (lei/stop with audio 2,45
approval)
16 Charge for treating exceptional transports (lei/transport) - 626
Charge for checking railway vehicles with Exceptional
17 - 42,89
transports (lei/railway vehicle)
Charge for carrying out experiments to increase the estimate of
18 -
tonnage to be towed or to change the towing method expenses
Charge for accompanying exceptional consignments estimate of
19 -
(oversized and / or outdated) expenses
Freight storage charge on TFIN infrastructure
20 management land (lei/freight on a loaded/unloaded - 500
train)
Price for using locations for advertising, artistic and
21 - 4997
documentary filming lei/day
Note:
(*1) the tariff applies to the access of shunting convoys to/from the non-interoperable railway infrastructure LFI (entry/exit on/from
industrial railway lines regardless of the length of the route;
(*2) - For the tariff for operational parking of rolling stock on lines:
- the tariff is charged per day even started;
- by wagon is understood a physical wagon;
- in the case of rolling stock, apart from wagons (locomotives, railcars, frames, equipment, etc.) an equivalence coefficient is applied as
follows:
a) for locomotives Tariff=K1x1.71 = 4.06 lei/locomotive/hour
(K1 = 25/15 = 1.67
25m – calculation length for locomotives
15m – calculation length for a physical wagon
b) – for rolling stock with a length between 25-50m Tariff=K2x1.71=6.49 lei/MR/hour
(K2=40/15=2.67
40m – calculation length for rolling stock between 25-50m (AMX VT2, 628 etc.)
15m – calculation length for a physical wagon.
c) – for rolling stock with a length between 50-100m Tariff=K3x1.71=11.36 lei/MR/hour
(K3=70/15=4.67
70m – calculation length for rolling stock between 50-100m (RIO, RIB, X series 72500 motor vehicle, etc.).
(*3) - Long-term parking is parking for more than 30 days, with prior request from OTF. The fee is charged per day, even if it has already
started.
- in the case of rolling stock, other than wagons (locomotives, railcars, frames, equipment, etc.), an equivalence coefficient is applied as
follows:
a) for locomotives Tariff=K 3.87= 5.35 lei/locomotive/day
(K1 = 25/15 = 1.67
25m – calculation length for locomotives
CFR Network Statement - 2026 ANNEX 7.b Version: 15.1.1 Update: 06.02.2026 Pag: 4 / 5
Compania Naţională de Căi Ferate “CFR” S.A. România
15m – calculation length for a physical wagon
b) – for rolling stock with a length between 25-50m Tariff=K2x3.87=8.56 lei/MR/day
(K2=40/15=2.67
40m – calculation length for rolling stock between 25-50m (AMX, etc.)
15m – calculation length for a physical wagon.
c) – for rolling stock with a length between 50-100m Tariff=K3x3.87=14.98 lei/MR/day
(K3=70/15=4.67
70m – calculation length for rolling stock between 50-100m (RIO, RIB, X series 72500 railcar, etc.).
(*4) The access fee is charged from the OTF that performs the maneuver on the station lines;
By maneuvering operation is understood the set of maneuvers performed by the OTF, for a specific purpose, such as but not limited to:
inserting/detachment of the locomotive from the train, inserting/removing double traction, pusher and/or interleaved locomotives,
attaching/detachment of a group of wagons, inserting wagons to public lines, loading/unloading lines, choosing wagons, etc.)
(*5) Determined according to the personnel costs involved: IDM, acar, needle inspector, barrier guard
(*6) Determined according to the personnel costs involved: IDM, acar, needle inspector, barrier guard
CFR Network Statement - 2026 ANNEX 7.b Version: 15.1.1 Update: 06.02.2026 Pag: 5 / 5
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
ae8adfc790d953ee0db89c8506b64eab84fa35734401c2e345c0296fe00d8e68