ated as described in 3.7.1 (without
further involvement of the C-OSS).
Acceptance > leads to allocation
Ask for adaptations > ad-hoc offer can be returned to path elaboration with comments; IM/AB
will make an alternative proposal; however, if no alternatives are possible, the applicant will
have to prepare a new request
Rejection > leads to withdrawal of the offer and closing of the request
No answer > The C-OSS will actively try to get an answer. In case there is still no answer from
the applicants, the C-OSS will end the process (no allocation)
If not all applicants agree on the final offer, the request will be considered as unanswered.
3.7 Request for changes by the applicant
3.7.1 Modification
The Sector Handbook for the communication between Railway Undertakings and Infrastructure Managers (RU/IM
Telematics Sector Handbook) is the specification of the TAF-TSI (EC) No. 1305/2014 Regulation. According to its
Annex 12.2 UML Model of the yearly timetable path request, it is not possible to place change requests for paths
Network Statement - 2026 ANNEX 4.b Version: 15.0.0 Update: 15.12.2024 Pag: 18 / 21
Compania Naţională de Căi Ferate “CFR” S.A. România
(even including PaPs) by the applicant between X-8 and X-5. The only option in this period is the deletion, meaning
the withdrawal, of the path request.
3.7.2 Withdrawal
Withdrawing a request is only possible
After submitting the request (until X-8) until the final offer
before allocation during the late path request phase (where applicable) and ad-hoc path request
phase.
Resubmitting the withdrawn dossier will be considered as annual request only until X-8.
The national rules regarding withdrawal fees and deadlines will apply.
3.7.3 Transfer of capacity
Once capacity is pre-booked or allocated to an applicant, it shall not be transferred by the recipient to another
applicant. The use of capacity by an RU that carries out business on behalf of a nonRU applicant is not considered
a transfer.
3.7.4 Cancellation
Cancellation refers to the phase between final allocation and the train run. Cancellation can refer to one, several
or all running days and to one, several or all sections of the allocated path.
In case a path has to be cancelled, for whatever reason, the cancellation has to be done according to national
processes.
3.7.5 Unused path
If an applicant or designated RU does not use the allocated path, the case is treated according to the national
rules.
3.8 Exceptional transport and dangerous goods
3.8.1 Exceptional transport
PaPs and RC do not include the possibility to manage exceptional consignments (e.g. out-ofgauge loads). The
parameters of the PaPs and RC offered have to be respected, including the published combined transport
profiles.
Requests for exceptional consignments are forwarded by the C-OSS directly to the IMs/ABs concerned for further
treatment.
3.8.2 Dangerous goods
Dangerous goods may be loaded on trains using PaPs or RC if both international and national rules concerning
the movement of hazardous material are respected (e.g. according to RID – Regulation governing the
international transport of dangerous goods by rail).
Dangerous goods have to be declared, when making a path request, to all IMs/ABs on the Corridor.
Network Statement - 2026 ANNEX 4.b Version: 15.0.0 Update: 15.12.2024 Pag: 19 / 21
Compania Naţională de Căi Ferate “CFR” S.A. România
3.9 Rail related services
Rail related services are specific services, the allocation of which follows national rules and partially other
deadlines than those stipulated in the process of path allocation. Therefore, the request has to be sent to the
IMs/ABs concerned directly.
If questions regarding rail related services are sent to the C-OSS, he/she contacts the IMs/ABs concerned, who
provide an answer within a reasonable time frame.
3.10 Contracting and invoicing
Network access contracts are concluded between IMs/ABs and the applicant on the basis of national network
access conditions.
The C-OSS does not issue any invoices for the use of allocated paths. All costs (charges for using a path,
administration fees, etc.) are invoiced by the relevant IMs/ABs according to national rules.
3.11 Appeal procedure
Based on Article 20 of the Regulation: in case of complaints regarding the allocation of PaPs (e.g. due to a decision
based on the priority rules for allocation), the applicants may address the relevant Regulatory Body (RB) as stated
in the Cooperation Agreement signed between RBs on the Corridor.
For a link to the Cooperation Agreements among the RBs refer to the CID of each Corridor.
Network Statement - 2026 ANNEX 4.b Version: 15.0.0 Update: 15.12.2024 Pag: 20 / 21
Compania Naţională de Căi Ferate “CFR” S.A. România
3.12 Table of deadlines
Date / Deadline Date in XSystem Description of Activities
9 January 2023
X-11 Publication of PaP Catalogue
10 January 2023 – 23 January Correction phase (corrections of errors to published
X-11 – X-10.5
2023 PaPs)
11 April 2023
X-8 Last day to request a PaP
17 April 2023
Last day to inform applicants about the alternative PaP
offer
24 April 2023
Last day for C-OSS to send PaP pre-booking information
X-7.5
to applicants
3 July 2023
X-5 Publication of draft timetable
4 July 2023 – 4 August 2023
X-5 – X-4 Observations and comments from applicants
25 April 2023 – 16 October Late path request application phase via the C-
X-7.5 – X-2
2023 OSS
22 August 2023 – 13 November
X-3.5 – X-1 Late path request allocation phase
2023
21 August 2023
X-3.5 Publication of final offer
26 August 2023
X-3 Acceptance of final offer
9 October 2023
X-2 Publication of RC
10 December 2023
X Timetable change
10 October 2023 – 14
December 2024 X-2 - X+12 Application and allocation phase for RC
Network Statement - 2026 ANNEX 4.b Version: 15.0.0 Update: 15.12.2024 Pag: 21 / 21
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
8710f6f83b34c0b9f6ae6efb44714812686e90e4acf657b0203ab7281ca219ba