Document colectat · Documentul de referință al rețelei feroviare 2026
CFR Network Statement2026
- Instituția sau publicația sursă
- Documentul de referință al rețelei feroviare 2026
- Data preluării
- 26.09.2026 17:55
- Dimensiunea materialului
- 3.692,6 KB
Conținutul documentului colectat
Secțiuni și tabele
Compania Nationala de Cai Ferate “CFR” S.A. Romania
It means the activity of conducting the railway traffic at the level of the regional organizational
structures, and at the level of the railway stations through the signalling and safety installations as well
as the supply of information on train traffic.
e) The use of the traction current supply equipment, if available (without the supply of electric power)
It means to make available to the RUs’ electric traction railway vehicles of the elements of the traction
current supply system of the contact wire necessary for its distribution, where they exist (electrified
lines).
f) Any other necessary information for introducing or operating the services for which infrastructure
capacities have been granted.
It means to make available to the RUs the data regarding the scheduling of the trains and the
infrastructure condition. This is mainly performed with the help of the IT systems which enable the RUs
to schedule and locate their own trains.
CFR also provides the hot axle box detection service (HABD) for the rolling stock of RUs trains in traffic, depending on the availability of specific equipment. Details are presented in Art. 5.5.3.
Infrastructure Access Charge
To ensure the minimum package of services provided for in Law No. 202/2016 on the integration of the Romanian railway system in the single European railway area, with subsequent amendments and additions and in the access contracts, CFR charges an infrastructure access charge (IAC). IAC is charged for the movement of a train on the railway infrastructure managed by CFR between two points (stations) of the network, without shunting or (re)fuelling services. IAC applies on a non- discriminatory basis to all RUs for similar conditions of transport. The method of allocating the direct costs related to the minimum access package (MPA) is presented in Annex 25.c. This allocation method is valid from 01.03.2024 and is in force until further modification.
a) IAC calculation methodology IAC is calculated based on a methodology approved, according to the legal provisions, by the Activity and Performance Contract of the National Railway Company "C.F.R." - SA. The activity and performance contract of CFR SA for the period 2021-2025, approved by GD No. 920/2021, is presented in Annex 24.a. The extract with the IAC calculation methodology is presented in Annex 25.a. The IAC calculation methodology is based on the following elements: a) the distance travelled by the train; b) the gross tonnage of the train; c) type of traffic: freight or passengers; d) traffic route; e) line class f) equipping with electrification systems to ensure traction current.
b) Line classes (sections) for IAC calculation The modality to include an IAC section into a line class for IAC calculation is presented in the IAC calculation methodology.
2026 CFR Network Statement Version: 15.1.6 Section: Services and Charges A Page
Date: 29.05.2026 65 of 98
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c263a03e282fd1a41999104a7c4f6b7621f27637ae19f710e9fb29da1eae84fd