Commission Staff Working Document: Analysis of the recovery and resilience plan of Romania amending the approval of the assessment of the recovery and resilience plan of 29 October 2021

Instituția sau publicația sursă
PNRR România, plan și decizii
Data preluării
26.09.2026 17:53
Dimensiunea materialului
643,8 KB

Conținutul disponibil în colecție

Textul documentului

ficiency renovations 0.43 and energy production from renewable sources for prosumers Training for green energy skills 10.38 0% Boosting renewable energy production 460.00 100% Boosting energy efficiency of public buildings 300.00 100% Grant Voucher Scheme to accelerate the 610.76 100% deployment of renewable energy by households Digitalisation, efficiency and modernisation of the 56.24 0% national electricity transmission network Pilot project for the installation of 20 MW of 17.00 100% floating solar panels on irrigation channels Grant Voucher Scheme to make energy efficiency 559.65 100% improvements to households *** Taking into consideration the assessment of all the measures envisaged in the REPowerEU chapter, the measures in the chapter are expected, to a large extent, to have a cross-border or multi-country dimension or effect. This would warrant a rating of A under criterion 2.13 of Annex V of the RRF Regulation. 29 3.14. ANNEX I: Climate tracking and digital tagging Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Rehabilitation of existing defence lines in accordance with the C1.I.4 Floods Directive and 96.97 035 100% the National Strategy for Flood Risk Management Rehabilitation of existing defence lines in accordance with the Floods Directive and C1.I.4 the National Strategy 8.03 055 100% for Flood Risk Management - Other types of ICT infrastructure Rehabilitation of existing accumulations C1. I.4 that require emergency 209.37 040 40% response for safe operation Rehabilitation of existing accumulations that require emergency C1. I.4 25.93 055 100% response for safe operation – Other types of ICT infrastructure Appropriate endowment of river basin administrations C1.1.5 1.60 035 100% for flood monitoring, prevention and emergency response Appropriate endowment of river basin administrations for flood monitoring, C1.1.5 5.20 055 100% prevention and emergency response – Other types of ICT infrastructure 30 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Implementation of the C1.1.6 30.00 055 100% water cadastre Extension of the national observation network of the National C1.1.7 40.00 035 100% 055 100% Integrated Meteorological System (SIMIN) Afforestation and reforestation national C2.I.1 460.88 035 100% campaign, including urban forests Development of modern production C2.I.2 50.00 035 100% capacities of forest reproduction material Update of approved management plans and identification of potential areas for strict protection in natural terrestrial and marine C2.I.3 120.00 050 40% habitats in order to implement the EU Biodiversity Strategy for 2030_Update of approved management plans Update of approved management plans and identification of potential areas for strict protection in natural C2.I.3 5.00 050 40% terrestrial and marine habitats in order to implement the EU Biodiversity Strategy for 2030 31 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Integrated investments for the ecological reconstruction of habitats and the conservation of species related to meadows, aquatic and water- C2.I.4 150.00 050 40% dependent areas Removing obstacles in watercourses to facilitate the restoration of the connectivity of water-dependent habitats and species Integrated investments for the ecological reconstruction of habitats and the conservation of species C2.I.4 related to meadows, 35.00 050 40% aquatic and water- dependent areas_Reconstruction of grassland habitats in protected natural areas Integrated investments for the ecological reconstruction of habitats and the conservation of species related to meadows, aquatic and water- C2.I.4 dependent 35.00 050 40% areas_Decolourisation of the Danube Delta lakes in the Danube Delta to reduce eutrophication and maintain biological diversity 32 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Integrated investments for the ecological reconstruction of habitats and the conservation of species related to meadows, C2.I.4 aquatic and water- 7.16 055 100% dependent areas_Implementation of a wild sturgeon monitoring system along the Lower Danube Integrated flood risk C2.I.5 mitigation systems in 22 040 40% forest river basins Development, modernisation and completion of integrated municipal waste management C3.I.1 452.20 042 40% systems at county level or at city/municipality level_Establishment of voluntary collection centres Development, modernisation and completion of integrated municipal waste management systems at county level C3.I.1 or at city/municipality 108.33 042 40% level _Household waste management: prevention, minimisation, sorting, reuse, recycling measures 33 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Development, modernisation and completion of integrated municipal C3.I.1 waste management 91.77 055 100% systems at county level or at city/municipality level _Other types of ICT infrastructure Development, modernisation and completion of integrated municipal waste management C3.I.1 systems at county level 75.51 042 40% or at city/municipality level _Integrated voluntary injection collection centres for agglomerations Development, modernisation and completion of integrated municipal waste management systems at county level or at city/municipality C3.I.1 2.61 044 40% level _Commercial, industrial waste management: prevention, minimisation, sorting, reuse, recycling measures Development, modernisation and completion of integrated municipal waste management C3.I.1 220.00 042 40% systems at county level or at city/municipality level_Construction of waste recycling facilities to meet the 34 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % recycling targets of the circular economy package Development of infrastructure for manure and other C3.I.2 255.00 044 40% compostable agricultural waste management Development of public monitoring, control and institutional capacities for waste management and pollution prevention _ C3.I.3 0.36 042 40% Household waste management: prevention, minimisation, sorting, reuse, recycling measures Development of public monitoring, control and institutional capacities for waste management C3.I.3 11.97 055 100% and pollution prevention _Other types of ICT infrastructure Development of public monitoring, control and institutional capacities for waste management and pollution C3.I.3 prevention_Air quality, 1.80 048 40% 055 100% radioactivity and noise monitoring equipment for the National Environmental Protection Agency 35 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Development of public monitoring, control and institutional capacities for waste management and pollution C3.I.3 prevention_Air quality, 13.20 055 100% radioactivity and noise monitoring equipment for the National Environmental Protection Agency Modernisation and renewal of railways infrastructure - C4.I.1 Modernisation of TEN- 994.00 064 100% T Core sections — Railway infrastructure construction Modernisation and renewal of railways infrastructure - Modernisation of TEN- C4.I.1 T Core sections — 115.00 070 40% 070 100% digital infrastructure with the exception of traffic management systems Modernisation and renewal of railways infrastructure - C4.I.1 46.00 071 40% 071 100% Modernisation of TEN- T Core sections — ERTMS Modernisation and renewal of railways infrastructure - Modernisation of TEN- C4.I.1 927.00 065 100% T Comprehensive sections — Railway infrastructure construction 36 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Modernisation and renewal of railways infrastructure - Modernisation of TEN- C4.I.1 T Comprehensive 183.00 070 40% 070 100% sections — Digital infrastructure with the exception of traffic management systems Modernisation and renewal of railways infrastructure - C4.I.1 38.00 071 40% 071 100% Modernisation of TEN- T Comprehensive sections — ERTMS Modernisation and renewal of railways C4.I.1 infrastructure - “Quick 261.00 067 100% wins” sections TEN-T Core Modernisation and renewal of railways C4.I.1 infrastructure - “Quick 191.00 068 100% wins” sections TEN-T Comprehensive Modernisation and renewal of railways infrastructure – C4.I.1 223.00 068 100% Renewal of TEN-T Comprehensive sections Modernisation and renewal of railways C4.I.1 infrastructure – 53.00 069 40% Renewal of sections non TEN-T Modernisation and renewal of railways C4.I.1 infrastructure – 213.00 070 40% 070 100% Centralisers for railways stations 37 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Coeff. Int. Coeff. Int. field % field % Railways rolling stock - Electric Locomotives, C4.I.2 382.00 072bis 100% EMU/HEMU railcars, wagon retraction Railways rolling stock - C4.I.2 Hydrogen refuelling 15.00 077 100% infrastructure Railways rolling stock - ERTMS on board for C4.I.2 15.00 071 40% 071 1
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

9c9d979fe9e2d01f6ddc8a83e0984ff9c88984a9b50c39b11bd53f73a86c3d3e