Commission Staff Working Document: Analysis of the recovery and resilience plan of Romania amending the approval of the assessment of the recovery and resilience plan of 29 October 2021
- Instituția sau publicația sursă
- PNRR România, plan și decizii
- Data preluării
- 26.09.2026 17:53
- Dimensiunea materialului
- 643,8 KB
Conținutul disponibil în colecție
Textul documentului
ficiency renovations 0.43
and energy production from renewable sources for
prosumers
Training for green energy skills 10.38 0%
Boosting renewable energy production 460.00 100%
Boosting energy efficiency of public buildings 300.00 100%
Grant Voucher Scheme to accelerate the 610.76 100%
deployment of renewable energy by households
Digitalisation, efficiency and modernisation of the 56.24 0%
national electricity transmission network
Pilot project for the installation of 20 MW of 17.00 100%
floating solar panels on irrigation channels
Grant Voucher Scheme to make energy efficiency 559.65 100%
improvements to households
***
Taking into consideration the assessment of all the measures envisaged in the REPowerEU
chapter, the measures in the chapter are expected, to a large extent, to have a cross-border or
multi-country dimension or effect. This would warrant a rating of A under criterion 2.13 of Annex
V of the RRF Regulation.
29
3.14. ANNEX I: Climate tracking and digital tagging
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Rehabilitation of
existing defence lines
in accordance with the
C1.I.4 Floods Directive and 96.97 035 100%
the National Strategy
for Flood Risk
Management
Rehabilitation of
existing defence lines
in accordance with the
Floods Directive and
C1.I.4 the National Strategy 8.03 055 100%
for Flood Risk
Management - Other
types of ICT
infrastructure
Rehabilitation of
existing accumulations
C1. I.4 that require emergency 209.37 040 40%
response for safe
operation
Rehabilitation of
existing accumulations
that require emergency
C1. I.4 25.93 055 100%
response for safe
operation – Other types
of ICT infrastructure
Appropriate
endowment of river
basin administrations
C1.1.5 1.60 035 100%
for flood monitoring,
prevention and
emergency response
Appropriate
endowment of river
basin administrations
for flood monitoring,
C1.1.5 5.20 055 100%
prevention and
emergency response –
Other types of ICT
infrastructure
30
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Implementation of the
C1.1.6 30.00 055 100%
water cadastre
Extension of the
national observation
network of the National
C1.1.7 40.00 035 100% 055 100%
Integrated
Meteorological System
(SIMIN)
Afforestation and
reforestation national
C2.I.1 460.88 035 100%
campaign, including
urban forests
Development of
modern production
C2.I.2 50.00 035 100%
capacities of forest
reproduction material
Update of approved
management plans and
identification of
potential areas for strict
protection in natural
terrestrial and marine
C2.I.3 120.00 050 40%
habitats in order to
implement the EU
Biodiversity Strategy
for 2030_Update of
approved management
plans
Update of approved
management plans and
identification of
potential areas for strict
protection in natural
C2.I.3 5.00 050 40%
terrestrial and marine
habitats in order to
implement the EU
Biodiversity Strategy
for 2030
31
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Integrated investments
for the ecological
reconstruction of
habitats and the
conservation of species
related to meadows,
aquatic and water-
C2.I.4 150.00 050 40%
dependent areas
Removing obstacles in
watercourses to
facilitate the restoration
of the connectivity of
water-dependent
habitats and species
Integrated investments
for the ecological
reconstruction of
habitats and the
conservation of species
C2.I.4 related to meadows, 35.00 050 40%
aquatic and water-
dependent
areas_Reconstruction
of grassland habitats in
protected natural areas
Integrated investments
for the ecological
reconstruction of
habitats and the
conservation of species
related to meadows,
aquatic and water-
C2.I.4 dependent 35.00 050 40%
areas_Decolourisation
of the Danube Delta
lakes in the Danube
Delta to reduce
eutrophication and
maintain biological
diversity
32
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Integrated investments
for the ecological
reconstruction of
habitats and the
conservation of species
related to meadows,
C2.I.4 aquatic and water- 7.16 055 100%
dependent
areas_Implementation
of a wild sturgeon
monitoring system
along the Lower
Danube
Integrated flood risk
C2.I.5 mitigation systems in 22 040 40%
forest river basins
Development,
modernisation and
completion of
integrated municipal
waste management
C3.I.1 452.20 042 40%
systems at county level
or at city/municipality
level_Establishment of
voluntary collection
centres
Development,
modernisation and
completion of
integrated municipal
waste management
systems at county level
C3.I.1 or at city/municipality 108.33 042 40%
level _Household waste
management:
prevention,
minimisation, sorting,
reuse, recycling
measures
33
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Development,
modernisation and
completion of
integrated municipal
C3.I.1 waste management 91.77 055 100%
systems at county level
or at city/municipality
level _Other types of
ICT infrastructure
Development,
modernisation and
completion of
integrated municipal
waste management
C3.I.1 systems at county level 75.51 042 40%
or at city/municipality
level _Integrated
voluntary injection
collection centres for
agglomerations
Development,
modernisation and
completion of
integrated municipal
waste management
systems at county level
or at city/municipality
C3.I.1 2.61 044 40%
level _Commercial,
industrial waste
management:
prevention,
minimisation, sorting,
reuse, recycling
measures
Development,
modernisation and
completion of
integrated municipal
waste management
C3.I.1 220.00 042 40%
systems at county level
or at city/municipality
level_Construction of
waste recycling
facilities to meet the
34
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
recycling targets of the
circular economy
package
Development of
infrastructure for
manure and other
C3.I.2 255.00 044 40%
compostable
agricultural waste
management
Development of public
monitoring, control and
institutional capacities
for waste management
and pollution
prevention _
C3.I.3 0.36 042 40%
Household waste
management:
prevention,
minimisation, sorting,
reuse, recycling
measures
Development of public
monitoring, control and
institutional capacities
for waste management
C3.I.3 11.97 055 100%
and pollution
prevention _Other
types of ICT
infrastructure
Development of public
monitoring, control and
institutional capacities
for waste management
and pollution
C3.I.3 prevention_Air quality, 1.80 048 40% 055 100%
radioactivity and noise
monitoring equipment
for the National
Environmental
Protection Agency
35
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Development of public
monitoring, control and
institutional capacities
for waste management
and pollution
C3.I.3 prevention_Air quality, 13.20 055 100%
radioactivity and noise
monitoring equipment
for the National
Environmental
Protection Agency
Modernisation and
renewal of railways
infrastructure -
C4.I.1 Modernisation of TEN- 994.00 064 100%
T Core sections —
Railway infrastructure
construction
Modernisation and
renewal of railways
infrastructure -
Modernisation of TEN-
C4.I.1 T Core sections — 115.00 070 40% 070 100%
digital infrastructure
with the exception of
traffic management
systems
Modernisation and
renewal of railways
infrastructure -
C4.I.1 46.00 071 40% 071 100%
Modernisation of TEN-
T Core sections —
ERTMS
Modernisation and
renewal of railways
infrastructure -
Modernisation of TEN-
C4.I.1 927.00 065 100%
T Comprehensive
sections — Railway
infrastructure
construction
36
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Modernisation and
renewal of railways
infrastructure -
Modernisation of TEN-
C4.I.1 T Comprehensive 183.00 070 40% 070 100%
sections — Digital
infrastructure with the
exception of traffic
management systems
Modernisation and
renewal of railways
infrastructure -
C4.I.1 38.00 071 40% 071 100%
Modernisation of TEN-
T Comprehensive
sections — ERTMS
Modernisation and
renewal of railways
C4.I.1 infrastructure - “Quick 261.00 067 100%
wins” sections TEN-T
Core
Modernisation and
renewal of railways
C4.I.1 infrastructure - “Quick 191.00 068 100%
wins” sections TEN-T
Comprehensive
Modernisation and
renewal of railways
infrastructure –
C4.I.1 223.00 068 100%
Renewal of TEN-T
Comprehensive
sections
Modernisation and
renewal of railways
C4.I.1 infrastructure – 53.00 069 40%
Renewal of sections
non TEN-T
Modernisation and
renewal of railways
C4.I.1 infrastructure – 213.00 070 40% 070 100%
Centralisers for
railways stations
37
Climate Digital
Measure Measure/ Budget
ID Sub-Measure Name (EUR m) Coeff. Int. Coeff.
Int. field
% field %
Railways rolling stock -
Electric Locomotives,
C4.I.2 382.00 072bis 100%
EMU/HEMU railcars,
wagon retraction
Railways rolling stock -
C4.I.2 Hydrogen refuelling 15.00 077 100%
infrastructure
Railways rolling stock -
ERTMS on board for
C4.I.2 15.00 071 40% 071 1
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
9c9d979fe9e2d01f6ddc8a83e0984ff9c88984a9b50c39b11bd53f73a86c3d3e