Document colectat · PNRR România, plan și decizii
Preliminary assessment of the third payment request of Romania (2024)
- Instituția sau publicația sursă
- PNRR România, plan și decizii
- Data preluării
- 26.09.2026 17:54
- Dimensiunea materialului
- 3.052,5 KB
Conținutul documentului colectat
Secțiuni și tabele
ii. Decision 1357/25.05.2023 issued by the National Energy Regulator (‘ANRE’) modifying
License no. 1085 for the commercial exploitation of capacities for the production of
electricity and heat in cogeneration, issued to the operator CE Oltenia ('CEO’), withdrawing
Power Unit No. 3 – 330 MW from the Rovinari Thermal Power Plant from operation and
mothballing Power Unit No. 7 – 330 MW from the Turceni Thermal Power Plant;
iii. Address CEO-SE Roviniari No. 449/SER/12.05.2023 in which CE Oltenia is notifying the
Transmission System Operator (‘TSO’) Transelectrica of the definitive withdrawal of Power
Unit No. 3 – 330 MW from the Rovinari Thermal Power Plant from operation and the
mothballing of Power Unit No. 7 – 330 MW from the Turceni Thermal Power Plant;
iv. Certification No. 27295/30.05.2023 from the TSO Transelectrica in which the National
Power Transmission Company Transelectrica certifies the withdrawal of Power Unit No. 3 –
330 MW from the Rovinari Thermal Power Plant from operation and the mothballing Power
Unit No. 7 – 330 MW from the Turceni Thermal Power Plant;
v. Ministerial Order no. 326/2024 issued by the Ministry of Energy amending the Annex to
Order No. 112/2024 of the Minister for Energy approving the rules on regulating the
activation of lignite-fired electricity generation capacity provided for in Article 4 (1) (a) of
Government Emergency Order No nr.108/2022 on decarbonising the energy sector;
vi. Notification No. 1075/DG/12.05/2023 of CE Oltenia informing the Ministry of Energy about
the withdrawal of 330 MW of production capacity from operation and the mothballing of
330 MW of production capacity;
vii. Notification No. 1074/DG/12.05.2023 of CE Oltenia informing ANRE about the withdrawal
of 330 MW of production capacity from operation and the mothballing of 330 MW of
production capacity;
viii. Address No. 34444/25.07.2023 containing the attestation by the TSO Transelectrica of
physical separation of Power Unit no. 3 of the Rovinari Thermal Power Plant from the
national electricity systems;
ix. Decision of the CE Oltenia Directorate No. 54/29.06.2023 to decommission and capitalise by
way of scrapping fixed assets related to Power Unit no. 3 from the Rovinari Thermal Power
Plant.
Analysis:
The justification and substantiating evidence provided by the Romanian authorities cover all constitutive elements of the target.
A cumulative 2 355 MW of coal and lignite-fired installed electricity production capacity have been shut down, out of which 2 025 MW have been decommissioned and 330 MW have been mothballed.
With its Decision 1357/25.05.2023 modifying License no. 1085 for the commercial exploitation of capacities for the production of electricity and heat in cogeneration, granted to the operator CE Oltenia, the National Energy Regulator (ANRE) withdrew the licence for Power Unit No. 3 – 330 MW from the Rovinari Thermal Power Plant to operate and amended the licence for Power Unit No. 7 – 330 MW from the Turceni Power Plant, requiring that the latter be kept mothballed until the end of 2025. The withdrawal and mothballing were certified by the Transmission System Operator (TSO) Transelectrica in its Certification No. 27295/30.05.2023. The measures are further demonstrated by the notifications No. 1075/DG/12.05/2023 and No. 1074/DG/12.05/2023 by CE Oltenia respectively notifying the Ministry of Energy and ANRE of the withdrawal of 330 MW of production capacity from operation and the mothballing of 330 MW.
When added to the decommissioning of 1 695 MW of coal and lignite-fired installed electricity production capacity achieved under target #113, positively assessed in the context of Romania’s first
Valorile și formulările aparțin documentului citat. Data preluării nu reprezintă perioada datelor sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
5a0ae438fcf8d27372091116fc4f4be9bb91e4070f1330f12d84cd33b8b9ce4f