Textul documentului
acts signed on 14 August 2024 and 6
September 2024 were not signed with applicants from the reserve list. Instead, the
contracts were signed following a new evaluation process which started on 17 May
2024, hence after the end of the aforementioned six-month deadline14. The
Commission takes the view that the execution of contracts resulting from a separate
evaluation process constitutes a new and distinct contractual agreement with
applicants that were not part of the original tender process. On this basis, the
Commission considers that the contracts signed on 14 August 2024 and 6 September
2024 do not qualify as measures taken by Romania within the six-month period
prescribed by Article 24(8) of the Regulation (EU) 2021/241.
(31) Therefore, as Romania has not taken the necessary measures within a period of six
months from the suspension to satisfactorily fulfil milestone 129 constituting part of
Romania’s request for payment, the Commission does not consider that milestone 129
is satisfactorily fulfilled. Nonetheless, in accordance with the methodology for the
determination of payment suspension under the Recovery and Resilience Facility
Regulation, the further progress made towards achieving the policy objective of the
milestone through the conclusion of contracts for an installed capacity of
41.83 MW(H2) with an expected volume generated of at least 8 300 tons of renewable
hydrogen should be reflected in a revision to the amount that was subject to
suspension. As a result, the amount for the second instalment of the loan support to be
13
See Financing contracts No 153 and 154/29.12.2023 with OMV Petrom, Financing contract No
302/12.04.2024 with Interventii Active in Atmosfera and Financing contract No 320/19.06.2024 with
Tehnomir.
14
See Order No 573/17.05.2024 issued by the Minister of Energy.
EN 9 EN
disbursed should be increased and will be released to Romania with a separate
Commission Implementing Decision.
(32) After consideration of the observations of Romania and in line with the methodology
for the determination of payment suspension under Regulation (EU) 2021/241, the
amount should be recalculated, taking into account the following elements:
(33) Milestone 129: Signature of contracts for the construction of at least 60 MW of new
electrolysers capacity
(i) The unit value for the milestone was derived by dividing the financial contribution
made available to Romania in the Council Implementing Decision of
EUR 14 942 153 000 by the number of milestones and targets in that Decision
related to the loan support (210).
(ii) A coefficient of 0.5 was applied to the milestone as it concerns an intermediary
milestone that is followed by a subsequent target related to the same investment.
(iii) a proportional reduction to the corrected unit value was applied to the milestone
(a factor of 0.3028) as it concerns an investment milestone, and it is possible to
evaluate the share of what has been achieved. Namely, contracts for an installed
capacity of 41.83 MW(H2) were signed, representing a share of 69.72% of the
target capacity of 60 MW(H2) from the milestone name.
(iv) No upward adjustment of the corrected unit value was applied to the milestone as
the investment is not considered by the Commission to be of major importance to
justify any of the ratings underpinning the positive assessment of the RRP. In
particular, in light of the Staff Working Document and the Council Implementing
Decision the measure is not relevant to justify any of the ratings related to the
assessment criteria of the recovery and resilience plan.
(34) On this basis, following the assessment of the measures taken by Romania within a
period of six months from the suspension decision and the observations provided, the
amount of the reduction should be recalculated considering a proportional reduction
compared to the amount suspended to account for the share of what has been achieved.
As a result of the recalculation, an amount of EUR 10 772 581 should be reduced in
accordance with Article 24(8) of Regulation (EU) 2021/241,
HAS ADOPTED THIS DECISION:
Article 1
Reduction of the loan support
The loan support made available to Romania laid down in Article 3 of Council Implementing
Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience
plan for Romania shall be reduced by EUR 10 772 581. This reduction shall be applied
against the amount indicated in Section 2(2) (2) of the Annex to that Decision.
EN 10 EN
Article 2
Addressee
This Decision is addressed to Romania.
Done at Brussels, 18.12.2024
For the Commission
Valdis DOMBROVSKIS
Member of the Commission
EN 11 EN
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c8b7bd7fd8f8d7b145f27e7cc5f9322ab15ac602c08c5eb9addf43ad42c53290