samples, out of which
all 60 have been considered as connected and functional. This analysis concluded that the target
has been over-achieved.
In consideration of the foregoing, the analysis certifies that the cash registers are connected to the
National Agency for Fiscal Administration’s electronic system and are functioning. The full
connection of cash registers will ensure that transactions performed by cash registers are tracked
and stored electronically by the National Agency for Fiscal Administration. This will help address,
22
in particular, fraud in the area of trade, by allowing the National Agency for Fiscal Administration
to monitor the activity of cash registers in Romania and reducing informal transactions. The higher
number of transactions recorded thanks to the full connection of cash registers shall in turn
contribute to reducing the VAT gap in Romania.
Commission Preliminary Assessment: Satisfactorily fulfilled
Number: 366 Related Measure: Development of pre-hospital medical infrastructure
Name of the Milestone: Adoption of criteria for prioritising investments in Integrated Community
Centres
Qualitative Indicator: Adoption of the Manual of Integrated Community
Centres, including guidelines for the prioritization of investments in Integrated Time: Q4 2021
Community Centres through an order of the Minister of Health.
Context:
As provided in the Council Implementing Decision, the objective of this investment is to improve the
access for the population, in particular for people in rural, disadvantaged and marginalized areas, to
quality health care, as well as to increase the availability of health services in primary and
community care.
The adoption of the criteria for prioritising investments in Integrated Community Centres (ICCs) is
the first milestone in this investment. These criteria should be contained in the Manual of the
Integrated Community Centres, providing guidelines for prioritisation of communities to benefit
from the Integrated Community Centres, approved by Ministerial Order. This milestone is followed
by target 370, due by Q2/2025, which consists of building/renovating 200 Integrated Community
Centres.
Evidence provided:
In line with the verification mechanism set out in the Operational Arrangements, the following
evidence was provided:
1. Summary document duly justifying how the milestone (including all the constitutive
elements) was satisfactorily fulfilled (Cover Note).
2. Copy of the Ministerial Order (Ministry of Health Order 2931/2021, published in the Official
Journal No. 1240 bis on 29/12/2021).
3. Copy of the Manual of Integrated Community Centres.
4. Guidelines for the prioritization of investments in Integrated Community Centres.
5. Link to the website where the Manual may be accessed.
The authorities also provided:
6. The letter no. 186/20.06.2022 from the Association of Romanian Communes (ACoR) to the
Minister of Health confirming the involvement of ACoR in the drafting of the Manual of
Integrated Community Centres and in the adoption of the prioritisation criteria for
investments in ICCs.
7. The email correspondence between the Ministry of Health and the president of ACoR and
the vice-president of the Romanian Association of Cities since December 2021, for their
consultation regarding the drafting of the Manual of Integrated Community Centres and the
data collection for the prioritisation criteria for investments in Integrated Community
Centres.
Analysis:
23
In line with the requirements set out in the CID Annex, the Ministry of Health elaborated the
Manual of Integrated Community Centres which includes the methodological priority guidelines
drafted in consultation with representatives of the local public authorities. The Manual has been
adopted by Order 2931/2021 of the Minister of Health and the priority guidelines included therein
line out the prioritization of investments in the Integrated Community Centres.
The requirements established by the description of the measure and of the milestone in the Council
Implementing Decision have been fulfilled as follows:
Regarding the adoption of the Manual of Integrated Community Centres through an Order
of the Minister of Health:
o the Manual of Integrated Community Centres was approved through Order
2931/2021 of the Minister of Health, published in the Official Journal No. 1240 bis
(29 December 2021).
With respect to the requirement of the priority guidelines in the Manual of Integrated
Community Centres being developed in consultation with representatives of the local public
authorities:
o the Manual including the priority guidelines was developed with the support of
experts from the Romanian Association of Communes and the Romanian
Association of Cities, as proven by the supplementing documents which have been
provided (the letter from the Association of Romanian Communes (ACoR) and the
email correspondence with the president of ACoR and the vice-president of the
Romanian Association of Cities). The consultation with representatives of the local
public authorities is also mentioned at page 19 of the Ministerial Order, in the last
paragraph.
Regarding the requirement that the prioritisation of Administrative Territorial Units must
consider the following six criteria: (1) the number of vulnerable people per community
(minimum 500 medically, socially or economically vulnerable people); (2) the availability of
association with other vulnerable localities; (3) the existence of a community nurse and a
social worker/social assistance technician; (4) administrative territorial units without access
to a family doctor or with insufficient number of family doctors relative to the population;
(5) the existence of a local council decision to set up the Integrated Community Centres; (6)
the identification of the locality as a marginal rural area. The purpose of these criteria is to
allow for the prioritisation of Administrative Territorial Units where Integrated Community
Centres are to benefit from the investments.
o The criteria for prioritising investments in Integrated Community Centres are
detailed in chapter 9 (pp. 19-21) of the Manual of Integrated Community Centres
which is in the annex of the Ministerial Order. All the criteria correspond to the six
requirements enumerated above and listed in the CID Annex.
Additionally, the Manual may be accessed online via the following link:
https://www.ms.ro/organizare/unitatea-de-implementare-si-coordonare-programe/
Commission Preliminary Assessment: Satisfactorily fulfilled
Number: 426 Related Measure: Stepping up the fight against corruption
Name of the Milestone: Entry into force of the government decision approving new National Anti-
Corruption Strategy
Qualitative Indicator: Provision in the government decision indicating the
Time: Q4 2021
adoption of the Anti-Corruption Strategy
Context:
24
The objective of reform 6 is to step up the fight against corruption through subsequent milestones,
by: i) adopting the national strategic framework for its prevention and repression; ii) strengthening
the capacity of the institution competent to combat it, namely the National Anti-Corruption
Directorate (DNA); iii) recovering the damage and proceeds of crime, to strengthen integrity in the
civil service; iv) ensuring an efficient system for declaring assets and interests.
Milestone 426 requires the adoption of an Anti-Corruption Strategy (“the Strategy”) by government
decision and constitutes the first part of Reform 6. Romania committed to implement at least 70%
of the measures foreseen in the strategy by 31 December 2025 (Target 428).
Evidence provided:
In line with the verification mechanism set out in the Operational Arrangements, the following
evidence was provided:
1. Summary document justifying how the milestone (including all the constitutive elements)
was satisfactorily fulfilled. The document moreover includes links to the website where the
strategy can be accessed.
2. Copy of the publication in the Official Journal No. 1218 of 22 December 2021 of the
Government Decision GD 1269/2021 approving the Strategy.
3. Copy of the adopted strategy (as annex to GD 1269/2021), including a summary of the
policies and measures envisaged.
Analysis:
The following elements have been addressed:
The anti-corruption strategy contains 127 measures organised in 5 general objectives and 19
specific objectives, 16 more than those set out in the CID Annex.
As required by the CID Annex, the Strategy sets out five general objectives (detailed from pg. 26
to pg. 40): (1) increasing implementation of anti-corruption measures; (2) reducing the impact
of Corruption on citizens; (3) strengthening integrity management and administrative capacity
to prevent and fight corruption; (4) strengthening integrity in priority areas; (5) improving the
performance of the fight against corruption by criminal and administrative means.
At the level of the specific objective (“SO”), the Strategy aims at training staff of central and
local public authorities and representatives of the private sector on environmental integrity
issues (SO 4.8, Measure 1), in line with the CID Annex. The Ministry of Justice moreover
commits to work with the High Court of Cassation and Justice, the Supreme Council of
Magistracy, the National Institute of Magistracy NMI, the Ministry of Environment and the
General Inspectorate for Immigration to develop a curriculum for the training of practitioners
involved in preventing and combating environmental crime. The curriculum would include
issues on preventing and combating related corruption (SO 4.8, Measure 3).
The Strategy aims at allocating a new DNA seat and provide with the necessary financial
resources for the fitting-out of the new premises, which is appropriate also in the light of the
support structure of the European Public Prosecutor's Office and the Technical Service to be
developed (SO 5.1, Measure 2). It moreover commits to the development of the DNA Technical
Service, including at territorial level (3 area centres, with staff of the allocated 90 police officers
mentioned in SO 5.1, Measure 4) (SO 5.1, Measure 3) and to provide the financial and human
resources needed to support investigations into high-level corruption cases – in particular, by
allocating and budgeting an additional 90 judicial police officers in DNA (SO 5.1, Measure 4).
25
These measures would help enhance the functioning of the DNA (National Anti-Corruption
Directorate), the European Public Prosecutor Office support structure, the Technical Service and
the reinforcement of judicial police officers, as required by the CID Annex.
To promote the unification and judicial practice in corruption, the DNA will conduct an analysis
of judicial practice concerning corruption cases especially in public procurement (SO 4.4,
Measure 1), while ordinary appeals and appeals in the interest of the law will be promoted in
order to step up efforts to unify judicial practice with respect to corruption cases (SO 5.1,
Measure 7).
As required by the CID Annex, the new Strategy sets out as new priority area environmental
corruption (page 21 and SO 4.8, as discussed above) and the integrity in the protection of
cultural assets (pg. 23 and SO 4.9). The Strategy moreover addresses the link between
corruption and organised crime (SO 5.3), as it acknowledges corruption as one of the means
that sustain the activities of organised crime groups and entrench their power. Measures to
achieve this objective include the production of a taxonomy of judicial practices on corruption
cases associated with organised crime, and the reinforcement of the protection of judicial staff
involved in the prevention and fight against corruption and organised crime (pg. 42).
The strategy moreover reviews the integrity legislation (Section C.2, pg. 10-11) and sets out
measures to improve legislation concerning:
o Conflicts of interests and incompatibilities, especially in the health sector (SO 4.1,
Measure 6), education sector (SO 4.2, Measure 6) and the management of cultural
heritage (SO 4.9, Measure 2)
o Declaration of assets and gifts, especially in the public sector (SO 5.2, Measure 3)
o Revolving door (pantouflage), especially to avoid conflicts of interests between
providers of anti-corruption training and the examiners that shall award
licensing/accreditation/certification mechanisms for that training (SO 4.2, Measure 5)
o The status and mandate of Ethics Adviser, in order to make anti-corruption preventive
measures more effective (SO 3.1, Measure 1).
The uniform application of the general standard of disclosure of public interest information ex
officio at the level of central and local public authorities (SO 3.2, Measures 1 and 2). Moreover,
Annex 4 includes a General Standard for Disclosure of Public Interest Disclosures that central and
local public authorities will have to fill into report, among others, information about their budget
and all financial sources and, in the case of contracting authorities, annual public procurement
programmes, a summary of procured contracts (for contracts worth less than EUR 5,000) or public
contracts (in all the other cases).
Commission Preliminary Assessment: Satisfactorily fulfilled
Number: 450 Related Measure: Monitoring and implementation of the plan
Name of the Milestone: Audit and Controls: information for monitoring implementation of the
recovery and resilience plan
Qualitative Indicator: Audit report confirming repository system
Time: Q4/2021
functionalities
Context
The objective of the overall investment is to set up and operationalise the integrated IT system, part
26
of the government cloud and connect it with other national and EU systems used for the purpose of
the implementation of the recovery and resilience plan.
The purpose of the IT system is to ensure the electronic collection, recording and storage of data
relating to each component of the RRF, including all data as requested by Art. 22(2)(d) of the RRF
Regulation.
Evidence Provided:
In line with the verification mechanisms set out in the Operational Arrangements, the following
evidence was provided:
1. Copy of the final Audit Report, signed on 30/05/2022 by the Audit Authority;
2. A certificate of completion of the works signed by the contractor, i.e. Special
Telecommunications Service (STS) no 99817/28.04.2022;
3. An acceptance Protocol signed by STS and the competent authority, i.e. Ministry of
Investments and European Projects (MIPE), no 99641/30.03.2022);
4. Summary document justifying how the milestone (including all the constitutive elements)
was satisfactorily fulfilled;
5. Link to the website where the IT system can be accessed: (Proiecte PNRR (gov.ro)).
Analysis:
The evidence provided by the Romanian authorities addresses the description of the reform in the
CID Annex as follows:
1. A repository system for monitoring the implementation of the recovery and resilience plan shall
be in place and operational before the first payment request (except for pre-financing). The
system shall include, as a minimum, the following functionalities:
a) collection of data and monitoring of the achievement of milestones and targets;
(…)
Romania presented a full repository system for monitoring the implementation of the recovery and
resilience plan in place and operational before the first payment request (except for prefinancing).
The acceptance Protocol signed between the Romanian Special Telecommunication Services
(hereinafter STS) and the Ministry of European Investments and Projects (hereinafter MIPE) as
national coordinator in March 2022 covers part of the IT system. The Protocol refers to the
functionalities of the front office module (the module used by applicants) as being completed and
operational. The certificate of completion of works signed by the developer, i.e. STS, on 28 April
covers, however the rest of the IT system, i.e. back office modules confirming that the system has
been completed and is operational in its integrity since 26 April 2022.
The audit report submitted by the Romanian authorities (drafted by the Audit Authority -
hereinafter the AA) covers not only milestone 450, but all milestones and targets of the first
payment request. M450 is assessed in chapter 3.3 The Audit findings and recommendations for
M450 and in detail in Annex 12 of the audit report. The audit report confirms that the IT system
(e_SMC) is operational and able to collect all data for the monitoring of the achievement of all
milestones and targets, including issuing progress reports and management declarations. Moreover,
the Dashboard component is active. It can display in real-time the evolution of the parameters for
the implementation of the Plan, i.e
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
4295cee125aa894d28dac7158da4899a4b7739a9ddccf7a8d3f87fa9d0d8ba9a