Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · PNRR România, plan și decizii

Operational Arrangements between the European Commission and Romania

Instituția sau publicația sursă
PNRR România, plan și decizii
Data preluării
26.09.2026 17:54
Dimensiunea materialului
5.789,4 KB

Conținutul disponibil în colecție

Textul documentului

European Union (OJEU) if the case c) copy of the signed contracts with the contractual counterparts and of the subsequent amendments to the contracts if any. d) extract of the relevant parts of the technical specifications of the project proving alignment with the description of the milestone and of the description of the investment in the CID 23 Qualitative Quantitative indicators Indicative timeline Related Measure Further Milestone/ indicators (for targets) for completion Responsibility Num (Reform or Name specification Target (for for reporting and Verification mechanism Investment) (where milestones) implementation Unit of necessary) Baseline Goal Quarter Year measure e) copy of the EIA and permits obtained if needed. 77 Investment 2. Target New electric Number 0 262 Q2 2026 Ministry of Summary document duly justifying how Railways rolling rolling stock Transport and the target (including all the constitutive stock in operation Infrastructure elements) was satisfactorily fulfilled. (MTI)/ Authority for This document shall include as an annex Railway Reform a spreadsheet with the list of certificates (ARF) including official references of the certificates issued in accordance with the national legislation to indicate that purchased New electric rolling stock is in operation. On the basis of a sample that may be selected by the Commission, at a minimum the following documentary evidence shall be submitted for each unit purchased : a) certificatests signed by the competent authority in accordance with the national legislation to indicate that purchased New electric rolling stock is operational. b) extract of the relevant parts of the technical specifications of the items purchased proving alignment with the description of the target and of the description of the investment in the CID; 113 Reform 1. Target Decommis- Megawatt 0 1 695 Q4 2021 Ministry of Summary document duly justifying how Electricity market sioning of s (MW) Energy the target (including all the constitutive reform, coal-fired elements) was satisfactorily fulfilled. This replacement of power- document shall include as an annex the coal in the energy production following documentary evidence: mix and support capacity for a legislative 24 Qualitative Quantitative indicators Indicative timeline Related Measure Further Milestone/ indicators (for targets) for completion Responsibility Num (Reform or Name specification Target (for for reporting and Verification mechanism Investment) (where milestones) implementation Unit of necessary) Baseline Goal Quarter Year measure and regulatory • The decision issued by the Energy framework for Regulator (ANRE) withdrawing the private license to operate power generation investment in capacities of 1 695MW of coal-fired renewable electricity installed electricity production production capacity. • Certification from the Transmission System Operator (TSO) of disconnection and decommissioning from the National Transmission System (the NTS) of 1 695MW of coal-fired installed electricity production capacity, endorsed by the relevant ministry. 114 Reform 1. Milestone Entry into Provision in Q2 2022 Ministry of Copy of the publication in the Official Electricity market force of the the law Energy Journal, accompanied by a summary reform, Decarbonisati indicating the document duly justifying how the replacement of on law entry into milestone was satisfactorily fulfilled. This coal in the energy adopting the force of the summary document shall include a mix and support coal/lignite legislative act reference to the relevant provisions for a legislative phase-out indicating the entry into force and to the and regulatory calendar provisions which fulfil the relevant framework for elements of the milestone, as listed in the private description of milestone and the investment in corresponding measure in the CID annex, renewable with appropriate links to or copies of the electricity document(s) mentioned in the summary production
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

c72f4c753645594284a4468173145d1a9c1d7855c09b5e5aab89bf33949e6313