Textul documentului
European Union (OJEU) if the case
c) copy of the signed contracts with the
contractual counterparts and of the
subsequent amendments to the
contracts if any.
d) extract of the relevant parts of the
technical specifications of the
project proving alignment with the
description of the milestone and of
the description of the investment in
the CID
23
Qualitative Quantitative indicators Indicative timeline
Related Measure Further
Milestone/ indicators (for targets) for completion Responsibility
Num (Reform or Name specification
Target (for for reporting and Verification mechanism
Investment) (where
milestones) implementation
Unit of necessary)
Baseline Goal Quarter Year
measure
e) copy of the EIA and permits
obtained if needed.
77 Investment 2. Target New electric Number 0 262 Q2 2026 Ministry of Summary document duly justifying how
Railways rolling rolling stock Transport and the target (including all the constitutive
stock in operation Infrastructure elements) was satisfactorily fulfilled.
(MTI)/
Authority for This document shall include as an annex
Railway Reform a spreadsheet with the list of certificates
(ARF) including official references of the
certificates issued in accordance with the
national legislation to indicate that
purchased New electric rolling stock is in
operation.
On the basis of a sample that may be
selected by the Commission, at a
minimum the following documentary
evidence shall be submitted for each unit
purchased :
a) certificatests signed by the
competent authority in accordance
with the national legislation to
indicate that purchased New electric
rolling stock is operational.
b) extract of the relevant parts of the
technical specifications of the items
purchased proving alignment with
the description of the target and of
the description of the investment in
the CID;
113 Reform 1. Target Decommis- Megawatt 0 1 695 Q4 2021 Ministry of Summary document duly justifying how
Electricity market sioning of s (MW) Energy the target (including all the constitutive
reform, coal-fired elements) was satisfactorily fulfilled. This
replacement of power- document shall include as an annex the
coal in the energy production following documentary evidence:
mix and support capacity
for a legislative
24
Qualitative Quantitative indicators Indicative timeline
Related Measure Further
Milestone/ indicators (for targets) for completion Responsibility
Num (Reform or Name specification
Target (for for reporting and Verification mechanism
Investment) (where
milestones) implementation
Unit of necessary)
Baseline Goal Quarter Year
measure
and regulatory • The decision issued by the Energy
framework for Regulator (ANRE) withdrawing the
private license to operate power generation
investment in
capacities of 1 695MW of coal-fired
renewable
electricity installed electricity production
production capacity.
• Certification from the Transmission
System Operator (TSO) of
disconnection and decommissioning
from the National Transmission
System (the NTS) of 1 695MW of
coal-fired installed electricity
production capacity, endorsed by the
relevant ministry.
114 Reform 1. Milestone Entry into Provision in Q2 2022 Ministry of Copy of the publication in the Official
Electricity market force of the the law Energy Journal, accompanied by a summary
reform, Decarbonisati indicating the document duly justifying how the
replacement of on law entry into milestone was satisfactorily fulfilled. This
coal in the energy adopting the force of the summary document shall include a
mix and support coal/lignite legislative act reference to the relevant provisions
for a legislative phase-out indicating the entry into force and to the
and regulatory calendar provisions which fulfil the relevant
framework for elements of the milestone, as listed in the
private description of milestone and the
investment in corresponding measure in the CID annex,
renewable with appropriate links to or copies of the
electricity document(s) mentioned in the summary
production
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
c72f4c753645594284a4468173145d1a9c1d7855c09b5e5aab89bf33949e6313