Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · Date deschise privind mediul

Climă/Teme de date INSPIRE (în conformitate cu anexele la Directiva 2007/2/CE ) / RO-Annex X - new PaMs EED.xlsx

Instituția sau publicația sursă
Date deschise privind mediul
Data preluării
26.09.2026 18:34
Dimensiunea materialului
33,3 KB

Conținutul disponibil în colecție

Textul documentului

ntervention procedures for reinforced concrete structure buildings; interventions for masonry buildings; interventions for steel structure buildings; types of interventions for non-structural components in buildings that pose a risk to users in the event of an earthquake; interventions on foundations and foundation ground – supplementation of surface foundations, development of existing surface foundations, measures to strengthen the foundation ground; interventions that reduce seismic forces through measures that reduce the mass of the construction (replacement of heavy layers of the terrace with layers of lightweight materials with superior efficiency, reduction of the operating load at the upper levels of buildings, removal of upper floors), through measures to control the seismic response by installing special devices (such as active shock absorbers, mass tuning dampers, metal shock absorbers (hysteretics), oil shock absorbers (hydraulics)) or seismic insulation of the base N/A the metodology is based on deemed savings N/A final energy savings (and primary energy obtained from final energy multiplied by the conversion factor defined by the Energy Performance Calculation Methodology Mc 001-2022 approved by Order of the Minister of Development, Public Works and Administration nr. 16/2023) for the calculation of energy savings we have considered maintaining the savings for a period of 7 years N/A The calculation of energy savings was based on the value of the total annual final energy consumption obtained from the building's initial energy performance certificate. This consumption has been reduced by the percentage set as minimum according to the call for proposals (30% moderate renovation), thus obtaining the minimum amount of energy savings to be achieved from the renovation works. Depending on the planning related to the intermediate stages of completion of the execution of the works, the moment from which energy savings can be accounted for was assessed, maintaining the values over a period of 7 years (the calculation was made for the period 2024-2030). (explain here how the calculation methodology complies with points (a) to (c) of Annex V(2), including how the effects of EU laws and regulations are taken into account, as required by points 2(b) and 2(c) of Annex V) N/A N/A N/A Regardless of the type of energy renovation work carried out, energy savings are achieved by applying measures leading to a minimum value of 30% N/A Energy savings are estimated for each policy measure and duly accounted for in the monitoring process. The conditions imposed by specific conditions of application take into account the avoidance of double funding for the same type of works, so we consider that the results obtained can only be quantified once. Romania has defined 5 climatic zones. The differences between climate zones are highlighted by different values of total energy consumption. Energy savings from energy renovation of buildings in each climate zone are estimated in the same way (minimmum 30% of annual final energy consumption). The differences between climate zones are highlighted by different values of total energy consumption, but the same amount of savings to be achieved from energy renovation works has been taken into account. In the monitoring phase of the implementation, in order to quantify the energy savings achieved, the programme indicators established , extracted from the initial and final energy performance certificates, will be used. Ministry of Development, Public Works and Administration - coordinator of investments. Central (Ministry of Education) and local public administration authorities- responsible for implementation. N/A The project indicators established by the programme must be achieved. Informations about them are available at the time of completion of the intervention works for energy renovation. The achievement of these indicators can be checked at any time after the completion of the works. N/A N/A N/A When designing intervention works, the technical regulations in force are respected and this is ensured by verification of the technical design by certified design verifiers. During the execution phase of the works, a permanent verification of the execution is carried out by site supervisors and technical responsible for execution. Romania has established a quality system through Law nr. 10/1995 on quality in construction N/A L30 46 COUNCIL IMPLEMENTING DECISION on the approval of the assessment of the recovery and resilience plan for Romania; OMDLPA nr. 999/2022 pentru aprobarea Ghidului specific — Condiții de accesare a fondurilor europene aferente Planului național de redresare și reziliență în cadrul apelurilor de proiecte PNRR/2022/C10, componenta 10 — Fondul local*) publicat în Monitorul Oficial al României, Partea I, nr. 467 bis din 10 mai 2022; OMDLPA nr. 441/2022 pentru aprobarea Ghidului specific privind regulile și condițiile aplicabile finanțării din fondurile europene aferente Planului național de redresare și reziliență în cadrul apelului de proiecte PNRR/2022/C5/2/B.2.1/1, PNRR/2022/C5/B.2.2/1, componenta 5 — Valul renovării, axa 2 — Schema de granturi pentru eficiență energetică și reziliență în clădiri publice, operațiunea B.2: Renovarea energetică moderată sau aprofundată a clădirilor publice*) publicat în Monitorul Oficial al României, Partea I nr. 289 bis din 25 martie 2022; OMDLPA nr. 440/2022 pentru aprobarea Ghidului specific privind regulile și condițiile aplicabile finanțării din fondurile europene aferente Planului național de redresare și reziliență în cadrul apelului de proiecte PNRR/2022/C5/2/B.1/1, componenta 5 — Valul renovării, axa 2 — Schema de granturi pentru eficiență energetică și reziliență în clădiri publice, operațiunea B.1: Renovarea integrată (consolidare seismică și renovare energetică moderată) a clădirilor publice*) publicat în Monitorul Oficial al României Partea I nr. 286 bis din 25 martie 2022; 1628000000.0 Euro 2023-August 2026 191 0 0 0 0 11 20 32 32 32 32 32 The National Recovery and Resilience Plan has established interim targets for August 2024, August 2025 Ministry of Development, Public Works and Administration public sector N/A Thermal rehabilitation of building envelope elements; Thermal rehabilitation of the heating system/hot water supply system; Installation/rehabilitation/modernization of air conditioning and/or mechanical ventilation systems to ensure indoor air quality; Rehabilitation / modernization of lighting installations in buildings; Integrated energy management systems for buildings, respectively modernization of technical building systems, including in order to prepare buildings for smart solutions; Smart shading systems for the warm season; Alternative systems for producing electricity and/or heat for own consumption; use of renewable energy sources; It isequipping buildings with charging stations for electric cars, according to the provisions of Law no. 372/2005 on the energy performance of buildings, republished; Interventions to strengthen structures in reinforced concrete frames; Interventions to strengthen structures in reinforced concrete frames with masonry filling panels; Interventions for the consolidation of structures with reinforced concrete walls through wall consolidation solutions – as individual structural elements and through consolidation solutions with modification of the structure as a whole, interventions on floors and foundation consolidation works with interventions to strengthen the foundation ground, where appropriate; Intervention procedures for reinforced concrete structure buildings; interventions for masonry buildings; interventions for steel structure buildings; types of interventions for non-structural components in buildings that pose a risk to users in the event of an earthquake; interventions on foundations and foundation ground – supplementation of surface foundations, development of existing surface foundations, measures to strengthen the foundation ground; interventions that reduce seismic forces through measures that reduce the mass of the construction (replacement of heavy layers of the terrace with layers of lightweight materials with superior efficiency, reduction of the operating load at the upper levels of buildings, removal of upper floors), through measures to control the seismic response by installing special devices (such as active shock absorbers, mass tuning dampers, metal shock absorbers (hysteretics), oil shock absorbers (hydraulics)) or seismic insulation of the base. https://www.mdlpa.ro/pages/c5valulrenovarii N/A the metodology is based on deemed savings N/A final energy savings (and primary energy obtained from final energy multiplied by the conversion factor defined by the Energy Performance Calculation Methodology Mc 001-2022 approved by Order of the Minister of Development, Public Works and Administration nr. 16/2023) for the calculation of energy savings we have considered maintaining the savings for a period of 7 years N/A The calculation of energy savings was based on the value of the total annual final energy consumption obtained from the building's initial energy performance certificate. This consumption has been reduced by the percentage set as minimum according to the call for proposals (30% moderate renovation, 60% deep renovation), thus obtaining the minimum amount of energy savings to be achieved from the renovation works. Depending on the planning related to the intermediate stages of completion of the execution of the works established by the CID, the moment from which energy savings can be accounted for was assessed, maintaining the values over a period of 7 years (the calculation was made for the period 2024-2030). The estimation of the energy savings achieved by energy renovation of the entire area assumed by CID was made by establishing a sample of 15 buildings from each category of buildings related to the calls for projects opened within the national plan, evenly distributed in the 5 climate classes of Romania. The energy savings achieved values corresponding to the total developed floor area of buildings analysed were extrapolated to the total area assumed to be achieved by the NRRP for this category of buildings. The estimated energy savings values for each year from 2024 (intermediate deadline for completion of renovation works for 30% of the CID area) until 2030 were highlighted. In the monitoring phase of the implementation, in order to quantify the energy savings achieved, the programme indicators established by the specific guides of the launched calls, extracted from the initial and final energy performance certificates, will be used. N/A N/A N/A Regardless of the type of energy renovation work carried out, energy savings are achieved by applying measures leading to a minimum value of 30% (or 60% as appropriate) N/A Energy savings are estimated for each policy measure and duly accounted for in the monitoring process. The conditions imposed in the specific guidelines take into account the avoidance of double funding for the same type of works, so we consider that the results obtained can only be quantified once. Romania has defined 5 climatic zones. The differences between climate zones are highlighted by different values of total energy consumption. Energy savings from energy renovation of buildings in each climate zone are estimated in the same way (minimmum 30% or 60% of annual final energy consumption). The differences between climate zones are highlighted by different values of total energy consumption, but the same amount of savings to be achieved from energy renovation works has been taken into account. In the monitoring phase of the implementation, in order to quantify the energy savings achieved, the programme indicators established by the specific guides of the launched calls, extracted from the initial and final energy performance certificates, will be used. Ministry of Development, Public Works and Administration - coordinator of reforms and investments. Central and local public administration authorities- responsible for implementation. N/A The project indicators established by the specific guides must be achieved. Informations about them are available at the time of completion of the intervention works for energy renovation. The achievement of these indicators can be checked at any time after the completion of the works. N/A N/A N/A N/A N/A L31 45 N/A N/A 121622 0 10600 21200 36030 52980 70 87 116 148 180 211 N/A Ministry of Development, Public Works and Administration N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A L32 45 N/A N/A 32849 0 393 1715 1715 2689 3815 4788 5914 5521 5172 6299 N/A Ministry of Development, Public Works and Administration N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A L33 45 N/A N/A 240515 0 0 0 0 16227 28487 39160 39160 39160 39160 39160 N/A Ministry of Development, Public Works and Administration N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A L34 45 Law no. 212/2022 regarding some measures to reduce the seismic risk of buildings, with subsequent amendments; The methodological norms for applying the provisions of Law no. 212/2022 approved by Order no. 2.853/2022 710000000.00 Euros 2023-2026 for the National Program for the consolidation of buildings with high seismic risk, of which the amount of 380000000.00 for The sub-program design and execution of intervention works for multi-storey buildings with the main purpose of housing 11757 0 0 0 0 0 0 1959 1959 1959 1959 3919 N/A Ministry of Development, Public Works and Administration; Beneficiaries of the Subprogram for the design and execution of intervention works for multi-storey buildings with the main residential purpose are the administrative-territorial units and subunits, represented by the local public administration authorities. residential sector N/A Thermal rehabilitation of building envelope elements; Thermal rehabilitation of the heating system/hot water supply system; Installation/rehabilitation/modernization of air conditioning and/or mechanical ventilation systems to ensure indoor air quality; Rehabilitation / modernization of lighting installations in buildings; Integrated energy management systems for buildings, respectively modernization of technical building systems, including in order to prepare buildings for smart solutions; Smart shading systems for the warm season; Alternative systems for producing electricity and/or heat for own consumption; use of renewable energy sources; It isequipping buildings with charging stations for electric cars, according to the provisions of Law no. 372/2005 on the energy performance of buildings, republished; Interventions to strengthen structures in reinforced concrete frames; Interventions to strengthen structures in reinforced concrete frames with masonry filling panels; Interventions for the consolidation of structures with reinforced concrete walls through wall consolidation solutions – as individual structural elements and through consolidation solutions with modification of the structure as a whole, interventions on floors and foundation consolidation works with interventions to strengthen the foundation ground, where appropriate; Intervention procedures for reinforced concrete structure buildings; interventions for masonry buildings; interventions for steel structure buildings; types of interventions for non-structural components in buildings that pose a risk to users in the event of an earthquake; interventions on foundations and foundation ground – supplementation of surface foundations, development of existing surface foundations, measures to strengthen the foundation ground; interventions that reduce seismic forces through measures that reduce the mass of the construction (replacement of heavy layers of the terrace with layers of lightweight materials with superior efficiency, reduction of the operating load at the upper levels of buildings, removal of upper floors), through measures to control the seismic response by installing special devices (such as active shock absorbers, mass tuning dampers, metal shock absorbers (hysteretics), oil shock absorbers (hydraulics)) or seismic insulation of the base. N/A the metodology is based on deemed savings N/A final energy savings (and primary energy obtained from final energy multiplied by the conversion factor defined by the Energy Performance Calculation Methodology Mc 001-2022 approved by Order of the Minister of Development, Public Works and Administration nr. 16/2023) for the calculation of energy savings we have considered maintaining the savings for a period of 7 years N/A The calculation of energy savings was based on the value of the total annual final energy consumption obtained from the building's initial energy performance certificate. This consumption has been reduced by the percentage set as minimum according to the call for proposals (30% moderate renovation), thus obtaining the minimum amount of energy savings to be achieved from the renovation works. Depending on the planning related to the intermediate stages of completion of the execution of the works, the moment from which energy savings can be accounted for was assessed, maintaining the values over a period of 7 years (the calculation was made for the period 2024-2030). N/A N/A N/A Regardless of the type of energy renovation work carried out, energy savings are achieved by applying measures leading to a minimum value of 30% N/A Energy savings are estimated for each policy measure and duly accounted for in the monitoring process. The conditions imposed by specific conditions of application take into account the avoidance of double funding for the same type of works, so we consider that the results obtained can o
← Înapoi la începutul extrasului

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

d81c6fde8f661305d52ff838ce441e3f6472de086feb0fe87ebb3fc4aec79a95