Program de
guvernare
Documentul original ↗
Proiect editorial 2026-2028Propuneri, date și condiții de implementare, cu stadiul verificării la vedere.

Document colectat · PNRR România, plan și decizii

COMMISSION STAFF WORKING DOCUMENT - Updated climate tracking and digital tagging of the recovery and resilience plan of Romania

Instituția sau publicația sursă
PNRR România, plan și decizii
Data preluării
26.09.2026 17:54
Dimensiunea materialului
308,0 KB

Conținutul disponibil în colecție

Textul documentului

EUROPEAN COMMISSION Brussels, 22.10.2025 SWD(2025) 342 final COMMISSION STAFF WORKING DOCUMENT Updated climate tracking and digital tagging of the recovery and resilience plan of Romania Accompanying the document Proposal for a COUNCIL IMPLEMENTING DECISION amending Implementing Decision (EU) (ST 12319/21 INIT; ST 12319/21 ADD 1) of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Romania {COM(2025) 654 final} EN EN EXECUTIVE SUMMARY The modifications submitted by Romania under Article 21(1) of Regulation (EU) 2021/241 affect 147 measures in total. Romania requested to modify these 147 measures due to objective circumstances. In addition, the proposed amendments to the Romania recovery and resilience plan aim to adapt the plan in line with the Communication from the Commission to the European Parliament and the Council “NextGenerationEU – the Road to 2026”1. Based on the assessment of the submitted modification, the Romanian modified plan receives an A-rating on all criteria except for costing, where the plan receives a B-rating (unchanged from the original plan assessment). (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Cross- Balanced CSRs Growth, DNSH Green Digital Lasting M & T Costing Control Cohe- REPower border Response jobs… target target impact Systems rence EU A A A A A (40.6%) A (21.3%) A A B A A A A 1 4.6.2025 COM(2025) 310 final 1 UPDATED CLIMATE TRACKING AND DIGITAL TAGGING OF THE RECOVERY AND RESILIENCE PLAN OF ROMANIA The table below presents the detailed application of the climate tracking and digital tagging methodologies set out respectively in Annexes VI and VII to Regulation (EU) 2021/241 in the modified Romanian recovery and resilience plan. Int. Field = intervention field. Coeff. = Coefficient for the calculation of support to climate change objectives and to digital transition, on the basis of Annex VI and Annex VII of the RRF Regulation. Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Rehabilitation of existing accumulations that require C1. I.4 33.00 040 40% emergency response for safe operation Appropriate endowment of river basin administrations for C1.I.5 1.60 035 100% flood monitoring, prevention and emergency response Appropriate endowment of river basin administrations for flood monitoring, prevention C1.1.5 5.20 055 100% and emergency response – Other types of ICT infrastructure Implementation of the water C1.1.6 30.00 055 100% cadastre Afforestation and reforestation national C2.I.1 307.55 035 100% campaign, including urban forests Development of modern C2.I.2 production capacities of forest 50.00 035 100% reproduction material 2 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Update of approved management plans and identification of potential areas for strict protection in C2.I.3 5.00 050 40% natural terrestrial and marine habitats in order to implement the EU Biodiversity Strategy for 2030 Integrated investments for the ecological reconstruction of habitats and the conservation of species related to meadows, C2.I.4 aquatic and water-dependent 7.16 055 100% areas_Implementation of a wild sturgeon monitoring system along the Lower Danube Integrated flood risk C2.I.5 mitigation systems in forest 22.00 040 40% river basins Development, modernisation and completion of integrated municipal waste management C3.I.1 systems at county level or at 240.11 042 40% city/municipality level_Establishment of voluntary collection centres Development, modernisation and completion of integrated municipal waste management systems at county level or at C3.I.1 city/municipality level 39.39 042 40% _Household waste management: prevention, minimisation, sorting, reuse, recycling measures Development, modernisation and completion of integrated municipal waste management C3.I.1 33.37 055 100% systems at county level or at city/municipality level _Other types of ICT infrastructure 3 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Development, modernisation and completion of integrated municipal waste management systems at county level or at C3.I.1 16.18 042 40% city/municipality level _Integrated voluntary injection collection centres for agglomerations Development, modernisation and completion of integrated municipal waste management systems at county level or at city/municipality level C3.I.1 0.56 044 40% _Commercial, industrial waste management: prevention, minimisation, sorting, reuse, recycling measures Development, modernisation and completion of integrated municipal waste management systems at county level or at C3.I.1 city/municipality 76.15 042 40% level_Construction of waste recycling facilities to meet the recycling targets of the circular economy package Development of infrastructure for manure and other C3.I.2 50.20 044 40% compostable agricultural waste management Development of public monitoring, control and institutional capacities for waste management and C3.I.3 pollution prevention _ 0.36 042 40% Household waste management: prevention, minimisation, sorting, reuse, recycling measures 4 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Development of public monitoring, control and institutional capacities for C3.I.3 11.97 055 100% waste management and pollution prevention _Other types of ICT infrastructure Modernisation and renewal of railways infrastructure - C4.I.1 Modernisation of TEN-T 364.89 064 100% Core sections — Railway infrastructure construction Modernisation and renewal of railways infrastructure - Modernisation of TEN-T C4.I.1 1088.90 065 100% Comprehensive sections — Railway infrastructure construction Modernisation and renewal of railways infrastructure - C4.I.1 346.45 067 100% “Quick wins” sections TEN-T Core Modernisation and renewal of railways infrastructure - C4.I.1 74.14 068 100% “Quick wins” sections TEN-T Comprehensive Railways rolling stock - Electric Locomotives, C4.I.2 280.83 072bis 100% EMU/HEMU railcars, wagon retraction Development of sustainable road infrastructure - TEN-T C4.I.3 8.06 063 100% Core sections (A1, A7, A8) — ITS infrastructure Development of sustainable road infrastructure - TEN-T C4.I.3a 23.91 063 100% Core sections (A1, A7, A8) — ITS infrastructure 5 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Development of sustainable road infrastructure - TEN-T C4.I.3 47.90 063 100% Comprehensive (A3) sections — ITS infrastructure Development of sustainable road infrastructure - C4.I.3 101.15 063bis 40% 063bis 100% Infrastructure for charging and control Development of sustainable road infrastructure - ITS C4.I.3 infrastructure (other than A1, 77.18 063 100% A3, A7, A8), Road safety infrastructure — digital Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.1 323.73 025bis 100% energy efficiency of the existing building stock_residential buildings Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.a.1 674.67 025bis 100% energy efficiency of the existing building stock_residential buildings Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.2 energy efficiency of the 6.25 077 100% existing building stock_alternative fuels infrastructure Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.a.2 energy efficiency of the 6.25 077 100% existing building stock_alternative fuels infrastructure 6 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.3 190.00 026bis 100% energy efficiency of the existing building stock_public buildings Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.a.3 700.00 026bis 100% energy efficiency of the existing building stock_public buildings Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.4 energy efficiency of the 6.25 077 100% existing building stock_alternative fuels infrastructure Establishment of a Renovation Wave fund to finance works to improve the C5.I.1.a.4 energy efficiency of the 6.25 077 100% existing building stock_alternative fuels infrastructure Implementation of the C5.I.2 5.00 011 100% National Building Register Circular economy and C5.I.4 increased energy efficiency of 5.00 023 40% historic buildings Circular economy and C5.I.4 increased energy efficiency of 5.05 026 40% historic buildings 7 Climate Digital Measure Measure/ Budget ID Sub-Measure Name (EUR m) Int. Int. Coeff. % Coeff. % field field Circular economy and C5.I.4 increased energy efficiency of 1.70 01 100% historic buildings Green hydrogen production C6.I.2 capacities and/or use for 86.5 032 100% electricity storage Development of flexible and high-efficient gas-fired combined heat and power C6.I.3 86.38 034 40% generation (CHP) in district heating to achieve deep decarbonisation Industrial chain of production and/or assembly and/or recycling of batteries, cells C6.I.4 and photovoltaic panels 50.00 027 100% (including ancillary equipment), and new electricity storage capacities Industrial chain of production and/or assembly and/or recycling of batteries, cells C6.I.4 and photovoltaic panels 80.00 033 100% 033 40% (including ancillary equipment), and new electricity storage capacities Ensuring energy efficiency in C6.I.5 64.00 024ter 100% the industrial sector Developing and

Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.

Identificarea exactă a documentului colectat

Amprenta SHA-256 permite identificarea versiunii preluate.

9c61228bec12e505a866e84f22fa1df6be31a6e6cd360c772a3a1e8ed2abf8d5