Document colectat · PNRR România, plan și decizii
ANNEX to the COUNCIL IMPLEMENTING DECISION amending Implementing Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Romania
- Instituția sau publicația sursă
- PNRR România, plan și decizii
- Data preluării
- 26.09.2026 17:54
- Dimensiunea materialului
- 3.786,9 KB
Conținutul disponibil în colecție
Textul documentului
reduced significantly
which shall enable the
extension of the water
and wastewater service
14452/25 ADD 1 6
ECOFIN 1A EN
infrastructure.
- Oblige local public
administration
authorities to keep
records of natural and
legal persons that do not
discharge waste water
into the public sewerage
network and send the list
of such persons to the
National Environmental
Guard annually.
- Oblige users to connect
to existing public
sewerage systems if they
do not have an
appropriate individual
collection and treatment
system.
- Allow to organise,
where appropriate, the
provision of the water
service only, on the
condition that the
collection of
wastewater is done
through individual
collection and
treatment systems that
shall ensure the same
level of environmental
protection as
14452/25 ADD 1 7
ECOFIN 1A EN
centralised collection
and treatment systems.
- Ensure the exceptional
nature of adequate
individual systems,
which shall only address
situations where
centralised systems are
not technically and
economically feasible.
- Prohibit the direct
discharge of untreated
wastewater from
appropriate individual
systems into the
environment.
- Develop criteria for
authorization,
construction,
registration/record,
operation and
maintenance of
appropriate individual
systems.
2 Reform 1. Milestone Entry into Provision in the Q1 2022 Entry into force of the law
Strengthening the force of the law indicating approving the national
regulatory law the entry into programme First
framework for approving the force of the law Connection to Water and
sustainable national for the First Sanitation, which shall
management of programme Connection to support families and single
water and waste First Water and people on low incomes
water sector and Connection Sanitation (who have average
14452/25 ADD 1 8
ECOFIN 1A EN
accelerating to Water and programme monthly net cash income
people’s access to Sanitation below the gross national
quality services minimum wage guaranteed
under European per family member) to pay
directives the costs incurred for
connection to the water
supply and sewerage
system.
Low income households
shall be identified by the
local authorities. The First
Connection Programme
shall then finance, through
the Environmental Fund
Administration, the
connection works for the
identified families
contracted by the local
authorities.
3 Reform 1. Milestone Implementa- Implementation Q4 2022 The Environmental Fund
Strengthening the tion agreements Administration shall sign
regulatory agreements signed with the the implementation
framework for the signed with local authorities agreements with the local
sustainable the local participating in authorities participating in
management of the authorities the First the First Connection to
water and waste participating Connection to Water and Sanitation
water sector and in the First Water and Programme.
accelerating Connection Sanitation
people’s access to to Water and Programme
quality services Sanitation
under European Programme
directives
4 Reform 2. Milestone Entry into Provision in the Q1 2026 Studies for the 11 river
14452/25 ADD 1 9
ECOFIN 1A EN
Reconfiguration of force of the law indicating basins in Romania shall be
ANAR’s current law the entry into made available on a
economic introducing force of a website and cover: (i) the
mechanism to amendments legislative act economic importance of
ensure the to regulate for amendments the sustainable water
modernisation and the new to regulate the management and use; (ii)
maintenance of the economic new economic trends in the evolution of
national water mechanism mechanism for the water needs and the
management for water water resources volumes of water collected
system resources in in Romania at river basin / area level;
Romania and (iii) medium and long-
term macroeconomic
indicators and the optimal
cost recovery mechanism
for the water volumes
provided by ANAR to
water resource users in
accordance with the
ecological flow
requirements.
On the basis of the studies,
legislative amendments
shall enter into force to
regulate the new economic
mechanism for water
resources in Romania.
The new mechanism shall
increase the correlation
between ANAR’s
(Romanian Waters
Administration) regulated
water revenue system and
the costs for each category
14452/25 ADD 1 10
ECOFIN 1A EN
of water users ANAR
supplies.
6 Investment 1. Target Constructed Kilometres 0 288.3 Q2 2026 A total of 288.3km of
Construction of water (km) water distribution
water networks and distribution networks shall be
sewerage systems networks constructed in
in agglomerations agglomerations of more
of more than 2 000 than 2 000 population.
population
equivalent
8 Investment 1. Target Constructed Kilometres 0 975 Q2 2026 At least 975 km of sewage
Construction of sewage (km) network shall be
water and sewerage networks constructed in total in
systems in agglomerations of more
agglomerations of than 2 000 population
more than 2 000 equivalents.
population
equivalent
10 Investment 2. Target Individual or Number 0 9 545 Q2 2026 9 545 in total individual or
Collection of waste other other appropriate systems
water in appropriate shall be constructed in
agglomerations of systems agglomerations of less
less than 2 000 constructed than 2 000 population
population in agglomera- equivalent.
equivalent tions of less
than 2 000
population
equivalent.
12 Investment 2. Target Constructed Kilometres 0 88.7 Q2 2026 88.7 km in total of sewage
Collection of waste sewerage (km) network shall be
water in networks in constructed in
agglomerations of agglomera- agglomerations below
less than 2 000 tions below 2 000 population
14452/25 ADD 1 11
ECOFIN 1A EN
population 2 000 equivalents.
equivalent population
equivalent
17 Investment 4. Target Existing dam Number 0 2 Q2 2026 1 existing dam – LESU,
Rehabilitation of and polder for which a revised
existing rehabilitated feasibility study concluded
accumulations that that there are no feasible
require emergency alternatives to reduce flood
interventions for
← Înapoi la începutul extrasului
Extrasul poate avea altă structură decât documentul original. Data preluării nu reprezintă perioada statistică sau data publicării de către instituție.
Identificarea exactă a documentului colectat
Amprenta SHA-256 permite identificarea versiunii preluate.
2d42cc042ec0b415a2656a4949f50e85266b99d38d037ae1e7b0516b19e5384b